If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20295 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.210897,"lon":-76.622575,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Franklin Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148923 | |
Farm/Lease Name: MOSER 8521H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-05-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.210897 | |
Longitude: -76.622575 |
Date | Event |
---|---|
2010-05-07 | New Permit Application |
2010-10-05 | Performed Spud Operation |
2010-11-09 | Drilling Completion |
2011-01-30 | Perforation |
2012-03-06 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-03-10 | 2011-03-10 | 4,548 | 4,670,400 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 11.51 | ||
Acid Corrosion Inhibitor Plexhib 256 | Chemplex | Acid Corrosion Inhibitor | Other -(non hazardous) | 52.00 | 0.00017000 | |||
Methanol | 67-56-1 | 40.00 | 0.00013000 | |||||
Propargyl alcohol | 107-19-7 | 8.00 | 0.00003000 | |||||
Water | Water | 7732-18-5 | 100.00 | 88.04 | ||||
Acid Non Emulsifier PlexBreak-145 | Chemplex | Acid Non-Emulsifier | Other -(non hazardous) | 85.00 | 0.00031000 | |||
Methanol | 67-56-1 | 15.00 | 0.00005000 | |||||
Acid - 7.5 HCl Acid | Skylkine Chemical Corp. | Cleaning | Water | 7732-18-5 | 92.50 | 0.30 | ||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.02 | |||||
Whole Product | ||||||||
Acid Iron Chelating Agt Ferriplex 40 | Chemplex | Acid Iron Chelating | Other -(non hazardous) | 57.00 | 0.00070000 | |||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00002000 | |||||
Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00049000 | |||||
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00001000 | |||||
Biocide - Plexcide 24L | Chemplex | Biocide | Other (72) | 72.00 | 0.02 | |||
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00119000 | |||||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00714000 | |||||
Scale Inhibitor - Greenhib 677 | Chemplex | Scale Inhibitor | Salt of phosphonomethylated diamine | 25.00 | 0.00641000 | |||
Other (75) | 75.00 | 0.01 | ||||||
Friction Reducer - Plexslick 921 | Chemplex | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Other (70) | 70.00 | 0.04 | ||||||
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 643,796.00 | 169 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 739,395.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 483,224.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 433,600.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 366,093.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 363,111.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 348,618.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 199,915.65 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 199,181.09 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Produced Fluid | 244.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2011 | XTO ENERGY INC | Produced Fluid | 4,295.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 4,366.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC001 |
2011 | XTO ENERGY INC | Produced Fluid | 986.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 1,402.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | XTO ENERGY INC | Produced Fluid | 1,067.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 2,271.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 2,745.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 1,857.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Produced Fluid | 236.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 10,234.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Produced Fluid | 236.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 1,218.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 2,627.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 123.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 1,763.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 828.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Produced Fluid | 659.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 892.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 162.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 345.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 2,977.78 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 855.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,290.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,054.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 1,446.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,739.49 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 3.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 1,279.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 355.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 114.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 523.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 340.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 948.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,854.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 134.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 40.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 1,051.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 226.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 130.00 Bbl | REUSE (AT WELL PAD) | |
2018 | XTO ENERGY INC | Produced Fluid | 358.18 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 471.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 1,125.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 481.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 106.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 179.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2018 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | XTO ENERGY INC | Produced Fluid | 561.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 904.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 475.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 585.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 114.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1939553 | Primary Facility | 2010-12-29 | Routine/Complete Inspection | No Violations Noted | |
1974941 | Primary Facility | 2011-05-19 | Routine/Complete Inspection | No Violations Noted | |
1976797 | Primary Facility | 2011-05-27 | Follow-up Inspection | No Violations Noted | |
1977185 | Primary Facility | 2011-06-01 | Routine/Complete Inspection | No Violations Noted | |
1980457 | Primary Facility | 2011-06-10 | Follow-up Inspection | No Violations Noted | |
1980505 | Primary Facility | 2011-06-11 | Follow-up Inspection | No Violations Noted | |
1980517 | Primary Facility | 2011-06-12 | Follow-up Inspection | No Violations Noted | |
1980522 | Primary Facility | 2011-06-13 | Follow-up Inspection | No Violations Noted | |
1980931 | Primary Facility | 2011-06-16 | Follow-up Inspection | No Violations Noted | |
1987387 | Primary Facility | 2011-07-07 | Follow-up Inspection | Violation(s) Noted | |
1995255 | Primary Facility | 2011-08-11 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2001199 | Primary Facility | 2011-05-17 | Complaint Inspection | Violation(s) Noted | sw-gas migration investigation, refer to complaint ID 279838 |
2003867 | Primary Facility | 2011-09-16 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2010933 | Primary Facility | 2011-10-14 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2012750 | Primary Facility | 2011-10-19 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2041334 | Primary Facility | 2012-02-09 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2073022 | Primary Facility | 2012-06-01 | Routine/Complete Inspection | No Violations Noted | |
2106617 | Primary Facility | 2012-10-05 | Routine/Complete Inspection | No Violations Noted | |
2129481 | Primary Facility | 2013-01-07 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2497997 | Primary Facility | 2016-06-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Arrived at 13:10. Weather: sunny, pleasant. At the time of this inspection Mike Hahn (XTO) and crew were onsite replacing 2 of the 3 produced water tanks. There were three wells capable of production. The wells were shut-in while the tanks were being replaced.
There were no violations observed during this inspection, however; a violation of §78.86 was cited on 7/7/2011 (IR# 1987387). The result of this inspection is OUTNO, Outstanding violation(s), no new violation(s). Left location @ 13:20 |
2518856 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | Notice of Termination/Well Site Restoration Inspection; 9/12/2016.
I entered the site at 15:35 to find three wells in production. Stormwater management BMP’s have been installed according to the PCSM Plans. The basin’s outlet structure has been modified to meet the PCSM plan and since the basin appears to be infiltrating, neither the underdrain nor the riser structure are necessary. Vegetation has not reached 70% perennial cover on the infiltration basin. The well site has not been re-graded and restored as the restoration plan indicates. This concept is further reiterated by your submission of the 2-year extension request (approved on 1/21/2016) which provides additional time to restore the site if stormwater is handled for the entire remaining site. I recommend denying the Notice of Termination and the Well Site Restoration Reports. No Violations Noted. |
2640582 | Primary Facility | 2017-09-19 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, three wells were in production. Some erosion was noted along the berm of the infiltration basin on the southeast corner of the site. The basin was filled with water and it appears the erosion is due to the saturated nature of the basin. I recommend addressing the erosion immediately. No violations noted. |
2764504 | Primary Facility | 2018-08-16 | Site Restoration | No Violations Noted | Notice of Termination/Well Site Restoration Inspection. At the time of the inspection, three well were in production and no one else was onsite. The site is permanently stabilized and the site conforms with the Post Construction Stormwater Management (PCSM)/Site Restoration Plans depicted in the ESCGP. No additional equipment or materials are being stored onsite. I recommend approving the Notice of Termination for the ESCGP and the Well Site Restoration Report. No violations noted. |
2791672 | Primary Facility | 2018-10-19 | Routine/Complete Inspection | No Violations Noted | Three wells stage for production. Three each sand and water separators within containment. No leaks detected from production equipment. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1987387 | 615203 | 07/07/2011 | 2011-07-07 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | Defective Cement: Gas found in the annular space of the 9 5/8 x 5 1/2 casing. |
2001199 | 619654 | 05/17/2011 | 2011-05-17 | 78.73A - Operator shall prevent gas and other fluids from lower formations from entering fresh groundwater. | Environmental Health & Safety | Viols closed with CACP, Enf ID 327878 |
2001199 | 619655 | 05/17/2011 | 2011-05-17 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | Viols closed with CACP, Enf ID 327878 |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
619654 | 274602 | NOV - Notice of Violation | Administrative Close Out | 2015-07-28 | |||
619654 | 327878 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2015-07-28 | 2015-07-28 | $95,753.00 | $95,753.00 |
619655 | 274602 | NOV - Notice of Violation | Administrative Close Out | 2015-07-28 | |||
619655 | 327878 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2015-07-28 | 2015-07-28 | $95,753.00 | $95,753.00 |
For data sources see[8]