If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-065-01365 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.20185,"lon":-79.09975,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Eldred Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: MINEWEASER 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.201850 | |
Longitude: -79.099750 |
Date | Event |
---|---|
1927-03-01 | Drilling Completion |
2001-03-06 | OLD WELL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | HANLEY & BIRD INC | 1554.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1996 | HANLEY & BIRD INC | 863 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | HANLEY & BIRD INC | 772 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | HANLEY & BIRD INC | 549 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | HANLEY & BIRD INC | 480 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | HANLEY & BIRD INC | 270 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | HANLEY & BIRD INC | 286 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | HANLEY & BIRD INC | 103 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | HANLEY & BIRD INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2004 | HANLEY & BIRD INC | 1056 | 365 | 0.00 | 0 | 0.00 | 0 |
2005 | HANLEY & BIRD INC | 1008 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | HANLEY & BIRD INC | 1,008.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | HANLEY & BIRD INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | HANLEY & BIRD INC | 845.75 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | HANLEY & BIRD INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | HANLEY & BIRD INC | 884.13 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA LLC | 1,091.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 1,585.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 1,404.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 1,598.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 1,488.79 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 493.00 | 183 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 449.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 546.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2798158 | Primary Facility | 2018-10-30 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was equipped to produce. A valve was open, making it appear to be producing gas. Well integrity looked to be in good condition, with no signs of any leaks. There did not appear to be much corrosion. The wellhead was located in a small stream. Casing was 3 1/2" casing. The well was properly labeled and was hooked up to a drip. Production reported in 2027 was 449 mcf for 365 days. |
For data sources see[6]