Well ID: 37-065-01213 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.047969,"lon":-78.892289,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Winslow Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: | |
Farm/Lease Name: HARRY H NOLPH | |
License Status: Plugged and Abandoned | |
Spud Date: 1938-10-02 | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.047969 | |
Longitude: -78.892289 |
Date | Event |
---|---|
1938-12-09 | Drilling Completion |
2001-05-16 | Old Well |
2018-08-06 | Begin Plugging |
2018-10-09 | Finished Plugging |
2019-06-14 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | NATL FUEL GAS SUPPLY CORP | 4616.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1992 | NATL FUEL GAS SUPPLY CORP | 4516.00 | 366 | 0.00 | 0 | 0.00 | 0 |
1993 | NATL FUEL GAS SUPPLY CORP | 4380.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1994 | NATL FUEL GAS SUPPLY CORP | 4380.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1995 | SENECA RESOURCES CO LLC | 1983.20 | 359 | 0.00 | 0 | 0.00 | 0 |
1996 | SENECA RESOURCES CO LLC | 3878 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | SENECA RESOURCES CO LLC | 2547 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | SENECA RESOURCES CO LLC | 2889 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | SENECA RESOURCES CO LLC | 640 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | SENECA RESOURCES CO LLC | 4392 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | SENECA RESOURCES CO LLC | 4380 | 365 | 0.00 | 0 | 0.00 | 0 |
2002 | SENECA RESOURCES CO LLC | 3648 | 365 | 0.00 | 0 | 0.00 | 0 |
2003 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2004 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 95.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1768575 | Primary Facility | 2009-02-11 | Complaint Inspection | No Violations Noted | |
2769295 | Primary Facility | 2018-08-28 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Alco Well Services was cleaning out the well. They have made it to a depth of 2160'. The record has TD at 2743'. A lined pit is being used at the site. |
2771985 | Primary Facility | 2018-09-06 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Alco Well Services was not working at this site today. Spoke to company man and was told that the current depth is at 2260'. This is about 200' off of the Tiona. Clean out will resume next week. Only a small amount of waste was in the pit. |
2778554 | Primary Facility | 2018-09-20 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, no activity was taking place. Rig operators were at another plug job. For 6 days in a row, depth has been like a yo-yo, going from between 2290' and 2325'. Well keeps caving back in overnight. They were at 2295' when they shut down. The top of the Tiona is at 2470'. I verbally agreed to an attainable bottom, whatever depth that is when they are back to the rig. Operator will set a 550' cement plug at this depth. Cementing is planned for Tuesday. |
2781131 | Primary Facility | 2018-09-26 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Alco crew onsite setting up to cement tomorrow. A bond log had been run on the 4" and found it to be tight from 650'-920'. The bottom of the pipe was tight as well. Rig pulled at close to 40,000 lbs and only got a little bit of stretch and ach attempt was getting worse. The 4" was cut at 1270' and still no movement. Plan was to perforate above 1270' with 8 sets of shots to 920'. Then cement to 650', cut the 4" and pull, then shoot the 6" near bottom to squeeze some cement down the backside. |
2781574 | Primary Facility | 2018-09-27 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Alco crew just finished up with cementing. The 4" casing was perforated at 1250', 1225', 1175', 1125', 1075', 1025', 975', and 930'. Each perf had 4 shots. After this, cement was pumped from 2275' to calculated 1720'. This was later tagged at 1948', so cement was going down the backside of the perfs. Gel was then set to 1250'. Todays cement job was from here to a calculated 720'. I received a phone call later in the day that this was tagged at 787'. |
2785453 | Primary Facility | 2018-10-04 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, no activity was taking place. Alco rig is laid down. Well only needs pea gravel added and a marker. Plan is to return next week to do this when things dry out some.
The 6" casing had been perforated since last inspection. 4 shots per perf were used at 625', 600', 575', and 525'. Cement was then pumped from 787' to a tagged top at 513'. |
2788317 | Primary Facility | 2018-10-11 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, no activity was taking place. Pea gravel has been added to surface. Marker has not been placed yet. Equipment remains onsite. The pit has been back filled. |
2801630 | Primary Facility | 2018-11-13 | Administrative/File Review | No Violations Noted |
For data sources see[7]