{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.576789,"lon":-79.246958,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Center Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 145085 | |
Farm/Lease Name: ADAMS UNIT | |
License Status: INACTIVE | |
Spud Date: 2013-07-12 | |
Permit Date: 2013-03-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.576789 | |
Longitude: -79.246958 |
Date | Event |
---|---|
2013-03-18 | New Permit Application |
2013-07-12 | Performed Spud Operation |
2013-08-11 | Drilling Completion |
2013-09-16 | Perforation |
2013-10-14 | Performed Stage 1 of Stimulation |
2013-10-14 | Performed Stage 2 of Stimulation |
2013-10-15 | Performed Stage 3 of Stimulation |
2013-10-15 | Performed Stage 4 of Stimulation |
2013-10-16 | Performed Stage 5 of Stimulation |
2013-10-16 | Performed Stage 6 of Stimulation |
2013-10-17 | Performed Stage 7 of Stimulation |
2013-10-17 | Performed Stage 8 of Stimulation |
2013-10-18 | Performed Stage 10 of Stimulation |
2013-10-18 | Performed Stage 9 of Stimulation |
2013-10-21 | Performed Stage 11 of Stimulation |
2013-10-21 | Performed Stage 12 of Stimulation |
2013-10-22 | Performed Stage 13 of Stimulation |
2013-10-22 | Performed Stage 14 of Stimulation |
2013-10-23 | Performed Stage 15 of Stimulation |
2013-10-23 | Performed Stage 16 of Stimulation |
2013-10-24 | Performed Stage 17 of Stimulation |
2014-10-01 | Inactive Well Request Granted |
2014-11-07 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-14 | 2013-10-30 | 7,962 | 6,275,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Ethoxylated alcohol | NA | 35 | 0.000113852 | 67.725 |
Short Chained Glycol Ether | 112-34-5 | 50 | 0.000162646 | 96.75 | ||||
Proprietary Blend Surfactants | NA | 35 | 0.000113852 | 67.725 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00319526 | 1900.7 | |
Other - (non-hazardous) | NA | 70 | 0.0074556 | 4434.97 | ||||
Biocide, EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00929053 | 5526.48 | |
Other - (non-hazardous) | NA | 5 | 0.00077421 | 460.54 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00077421 | 460.54 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00464526 | 2763.24 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0454402 | 27030.1 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0194744 | 11584.3 | ||||
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Other - (non-hazardous) | NA | 85 | 0.000953 | 566.893 | |
Water | 7732-18-5 | 15 | 0.000168176 | 100.04 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0572638 | 34063.4 | |
Other - (non-hazardous) | NA | 92.5 | 0.706254 | 420116 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.04 | 52,370,700.0 | |
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 11.104 | 6,605,200.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-10-14 | 1 | Sand | 0 | 8,148 | 6,732 |
2013-10-14 | 2 | Sand | 0 | 8,051 | 6,347 |
2013-10-15 | 3 | Sand | 0 | 8,094 | 6,328 |
2013-10-15 | 4 | Sand | 0 | 7,963 | 6,263 |
2013-10-16 | 5 | Sand | 0 | 8,060 | 6,570 |
2013-10-16 | 6 | Sand | 0 | 8,289 | 6,042 |
2013-10-17 | 7 | Sand | 0 | 8,273 | 7,047 |
2013-10-17 | 8 | Sand | 0 | 8,253 | 6,081 |
2013-10-18 | 9 | Sand | 0 | 8,355 | 6,645 |
2013-10-18 | 10 | Sand | 0 | 8,232 | 6,324 |
2013-10-21 | 11 | Sand | 0 | 8,191 | 6,369 |
2013-10-21 | 12 | Sand | 0 | 7,931 | 6,098 |
2013-10-22 | 13 | Sand | 0 | 8,237 | 5,852 |
2013-10-22 | 14 | Sand | 0 | 8,156 | 6,066 |
2013-10-23 | 15 | Sand | 0 | 8,063 | 6,051 |
2013-10-23 | 16 | Sand | 0 | 8,025 | 7,094 |
2013-10-24 | 17 | Sand | 0 | 8,147 | 6,697 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 1,469.00 Tons | LANDFILL | 100434 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2184969 | Primary Facility | 2013-07-02 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well site currently being constructed. Access road nearly completed, in good condition. Well pad not yet constructed. |
2185111 | Primary Facility | 2013-07-16 | Drilling/Alteration | No Violations Noted | |
2185114 | Primary Facility | 2013-07-18 | Drilling/Alteration | No Violations Noted | |
2186901 | Primary Facility | 2013-07-26 | Drilling/Alteration | No Violations Noted | |
2186978 | Primary Facility | 2013-07-12 | Routine/Complete Inspection | No Violations Noted | Pre-operational inspt. At time of inspection, drilling not yet commenced. |
2189171 | Primary Facility | 2013-07-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection, in process of cementing. Well spudded on 7/12/2013. |
2195139 | Primary Facility | 2013-08-09 | Drilling/Alteration | No Violations Noted | Tripping out of hole ; Current TD 11,989' |
2195434 | Primary Facility | 2013-07-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection, rig on-site, inactive. Well spudded on 7/12/2013. |
2204787 | Primary Facility | 2013-09-04 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled, not yet frac'd. Well spudded on 7/12/2013. |
2207381 | Primary Facility | 2013-09-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled, not yet frac'd. Well spudded on 7/12/2013.Site ID sign in place at entrance, in compliance with Act 9 standards. Drilling permit, PCSM plan, E&S plan, PPC Plan all on-site.Manned security booth at pad entrance. Trucks currently on-site filling tanks with water in preparation for frac'ing operations. Containment for underneath rig in process of being installed.Tanks labeled for holding freshwater not on containment. Tanks labeled for holding residual wastes within secondary containment units, appear sound. Water accumulation noted with containment units; Department recommends Operator remove and properly dispose of accumulation.Access road adequately rocked, in good condition. Moderate vegetative growth observed alongside access road perimeter, stabilized. Potential E&S concerns (inspection record 2204787) have been addressed. Department recommends Operator continue to monitor and maintain BMPs and re-seed/mulch areas between pad and infiltration basins to ensure temporary stabilization is maintained. |
2212434 | Primary Facility | 2013-10-09 | Routine/Complete Inspection | No Violations Noted | |
2215472 | Primary Facility | 2013-09-04 | Administrative/File Review | In Compliance with Policy | |
2226207 | Primary Facility | 2013-11-26 | Routine/Complete Inspection | No Violations Noted | |
2226479 | Primary Facility | 2013-11-26 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | At time of inspt, well appears frac'd, not yet equipped for production.Prior to this inspection, no documented notification for well stimulation was provided to Dept by Opr.As per current regulation, Opr shall provide Dept with 24 hours' notice prior to stimulation of an unconventional well. |
2232574 | Primary Facility | 2013-12-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well frac'd, not yet equipped for production. Drilling occurred 7/12/2013-8/11/2013. |
2244661 | Primary Facility | 2014-02-06 | Routine/Partial Inspection | No Violations Noted | RTPT inspt. |
2300114 | Primary Facility | 2014-08-28 | Routine/Complete Inspection | No Violations Noted | |
2300162 | Primary Facility | 2014-08-27 | Routine/Complete Inspection | No Violations Noted | Marcellus. At time of inspection, well drilled and equipped for production. According to records, drilling occurred 7/12/2013-8/11/2013. |
2315013 | Primary Facility | 2014-10-22 | Routine/Complete Inspection | No Violations Noted | Marcellus. At time of inspection, well drilled and equipped for production. According to records, drilling occurred 7/12/2013-8/11/2013. Regulatory inactive status granted 10/02/2014. |
2337982 | Primary Facility | 2015-01-21 | Routine/Complete Inspection | No Violations Noted | Marcellus. At time of inspection, well drilled and equipped for production. According to records, drilling occurred 7/12/2013-8/11/2013. Regulatory inactive status granted 10/02/2014. |
2377651 | Primary Facility | 2015-06-02 | Routine/Complete Inspection | No Violations Noted | Marcellus. At time of inspection, well drilled and appears equipped for production. According to records, drilling occurred 7/12/2013-8/11/2013. Regulatory inactive status granted 10/02/2014.Site ID sign present, in compliance with Act 9 standards. Permit number posted. Drill permit, E&S/PCSM plan, ERP, ESCGP-1, PPC plan all present at access road entrance.Well tag present, legible. Wellhead surrounded by gate, cement barriers. Two brine tanks, production equipment located within lined, metal secondary containment unit, all appear sound. Accumulation noted within containment unit. Dept recommends Opr continue to monitor and empty containment as per current regulations.Access road stabilized, gated. Pad rocked. Pad slopes uniformly and adequately vegetated with >70% vegetative growth. Dept recommends Opr re-seed/mulch areas surrounding sed basins as necessary and continue to monitor and maintain all E&S BMPs as needed in order to prevent any potential pollution events from occurring.Dept previously granted well site restoration until May 11, 2016. |
2425011 | Primary Facility | 2015-11-12 | Routine/Complete Inspection | No Violations Noted | Marcellus. At time of inspection, well drilled and under regulatory inactive status (granted 10/02/2014). According to records, drilling occurred 7/12/2013-8/11/2013. Frac’g completed 10/30/2013.Site ID sign present, in compliance with Act 9 standards. Drill permit, E&S/PCSM plan, ERP, ESCGP-1, PPC plan, monitoring reports all present at access road entrance.Well tag present, legible. Wellhead surrounded by gate, cement barriers. Two brine tanks, production equipment located within lined, metal secondary containment unit, all appear sound.Access road stabilized, gated. Pad rocked. Pad slopes uniformly and adequately vegetated with >70% vegetative growth. Department recommends Operator re-seed/mulch areas surrounding sed basins as necessary and continue to monitor and maintain all E&S BMPs as needed in order to prevent any potential pollution events from occurring.Department previously granted a well site restoration extension until May 11, 2016.No violations noted at this time. |
2606905 | Primary Facility | 2017-06-22 | Site Restoration | No Violations Noted | At time of inspection, well drilled. Regulatory inactive status granted 10/2/2014. According to records, drilling completed 8/11/2013 and stimulation completed on 10/30/2013.
Well tag present, legible. Well surrounded by chain-link fence and cement barriers. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2226479 | 684563 | 11/26/2013 | 2013-11-26 | OGA3211(F2) - WELL PERMITS - DRILLING - Failure to notify DEP 24 hours prior to cementing casing strings, pressure testing of production casing, stimulation of well or plugging of an unconventional well. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
684563 | 305337 | NOV - Notice of Violation | Comply/Closed | 2013-12-16 |