37-063-37136

Well Details

Well ID: 37-063-37136
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148497
Farm/Lease Name: HCPP A 4H
License Status:
Spud Date:
Permit Date: 2011-06-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.524589
Longitude: -79.198081

For data sources see[1][2][3]

Well History

Date Event
2011-06-23 New Permit Application
2011-08-02 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-03-05 2012-03-05 8,031 4,085,180

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Water 7732-18-5 100.00 86.91
Acid - 7.5 HCl Acid PPG Industries Acid Hydrochloric acid 7647-01-0 7.50 0.04
Other -(non hazardous) 92.50 0.43
Biocide - MC 8520 Multi-Chem Group Biocide 4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00
2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00
Sand Proppant Quartz 14808-60-7 100.00 12.54
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Other -(non hazardous) 70.00 0.03
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor Other -(non hazardous) 100.00 0.01
Biocide - MC 8650 Multi-Chem Group Biocide Glutaraldehyde 111-30-8 60.00 0.00
Other -(non hazardous) 40.00 0.00
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Diethylene glycol monobutyl ether 112-34-5 50.00 0.00
100.00
Other -(non hazardous) 50.00 0.00

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 768,564.00 251 0.00 0 0.00 0
2013 XTO ENERGY INC 520,183.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 224,617.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 193,944.00 359 0.00 0 0.00 0
2016 XTO ENERGY INC 143,796.00 338 0.00 0 0.00 0
2017 XTO ENERGY INC 97,330.00 342 0.00 0 0.00 0
2018 XTO ENERGY INC 177,229.18 357 0.00 0 0.00 0
2019 XTO ENERGY INC 136,542.31 356 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Produced Fluid 189.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 XTO ENERGY INC Fracing Fluid Waste 8,554.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 204.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2012 XTO ENERGY INC Produced Fluid 104.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 XTO ENERGY INC Produced Fluid 9,335.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012 XTO ENERGY INC Produced Fluid 296.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Fracing Fluid Waste 180.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 315.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 406.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 89.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 XTO ENERGY INC Produced Fluid 1,540.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 406.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 797.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 XTO ENERGY INC Produced Fluid 182.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 XTO ENERGY INC Produced Fluid 1,105.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 99.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 1,118.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 461.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 309.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 18.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 44.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 303.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 1,038.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 136.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 183.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 345.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 88.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994312 Primary Facility 2011-08-02 Drilling/Alteration No Violations Noted
1994336 Primary Facility 2011-08-05 Drilling/Alteration No Violations Noted
2005191 Primary Facility 2011-09-20 Routine/Complete Inspection No Violations Noted ID, ES, ESCGP-1, PPC PRESENT RIG SKID FROM 2H TO 4H; 4H SURFACE CASING SET BMPS INSTALLED FUNCTIONING. NO ACC ES NOTED. NO VIOLATIONS NOTED DURING INSPECTION, ACCOMPANIED BY OGI RICK HOOVER
2005603 Primary Facility 2011-09-20 Drilling/Alteration No Violations Noted
2007145 Primary Facility 2011-09-28 Drilling/Alteration No Violations Noted
2009451 Primary Facility 2011-10-05 Drilling/Alteration No Violations Noted
2011035 Primary Facility 2011-10-12 Drilling/Alteration No Violations Noted
2012938 Primary Facility 2011-10-19 Drilling/Alteration No Violations Noted
2016286 Primary Facility 2011-11-02 Routine/Complete Inspection No Violations Noted At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures) as documents located onsite are wet. Multi Well pad. Access road and pad adequately rocked. Well drilled not yet in production. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal. No IW or accelerated ES issues noted onsite. Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man informed department that area behind well pad is not related to drilling activities, but rather HCPP.
2040022 Primary Facility 2012-01-30 Routine/Complete Inspection No Violations Noted Inspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road.
2041945 Primary Facility 2012-02-02 Follow-up Inspection No Violations Noted Follow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer, and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO XTO agreeded to notifiy us at start of work
2045591 Primary Facility 2012-02-23 Follow-up Inspection No Violations Noted Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.
2045803 Primary Facility 2012-02-27 Follow-up Inspection No Violations Noted Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad. At the time of today’s inspection, it appears operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall. AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring the area and if any additional movement is noted a gabion wall will be installed. During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected.
2046711 Primary Facility 2012-02-27 Drilling/Alteration No Violations Noted
2088616 Primary Facility 2012-08-01 Routine/Complete Inspection No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.
2109580 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
2136124 Primary Facility 2013-01-31 Routine/Complete Inspection No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
2183587 Primary Facility 2013-06-13 Administrative/File Review In Compliance with Policy On-site meeting with XTO rep Dan Rice regarding site restoration. Mr. Rice requested meeting to discuss stabilization and express concerns pertaining to side slope on left side of pad when standing at pad entrance.
2247638 Primary Facility 2014-02-19 Routine/Partial Inspection No Violations Noted Site ID sign present, in compliance with Act 9 standards. ERP on-site. Permit numbers posted. Department recommends Operator remove posted permit numbers for any permits which are no longer valid.
2489595 Primary Facility 2016-05-25 Routine/Partial Inspection No Violations Noted Multi-well pad. At the time of this inspection, well 4H drilled and appears equipped for production. According to records, drilling occurred 8/02/2011-10/18/2011. Well tag present, legible.

Wells 2H, 3H, 8H drilled and appear equipped for production. Fence located around wells. Four on-site brine tanks appear sound, located within a lined, metal secondary containment unit. Access road stabilized. Site ID sign present, in compliance with Act 9 standards. ERP on-site. Inspection conducted with WQS Cindy Witham.

2502633 Primary Facility 2016-07-18 Routine/Complete Inspection No Violations Noted Multi-well Marcellus site. Well appears equipped for production.

At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed in relation to access road or well pad. Well tag present, legible and affixed in a permanent manner. Brine tank located in secondary containment appears structurally sound.

2519649 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted Multi-well Marcellus site.

At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site. No E&S issues observed on access road. Well pad rocked, no E&S issues observed. It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection.

2654778 Primary Facility 2017-10-26 Routine/Complete Inspection No Violations Noted Well appears equipped for production.

Well head surrounded by security fence. The NOT for this site was approved on 9-13-16.

2668718 Primary Facility 2017-12-08 Routine/Complete Inspection No Violations Noted
2761110 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by security fence and cement barriers. Four brine tanks located on site.

For data sources see[8]

References