37-063-37134

Well Details

Well ID: 37-063-37134
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148497
Farm/Lease Name: HCPP A 2H
License Status:
Spud Date: 2011-07-22
Permit Date: 2011-06-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.524644
Longitude: -79.198075

For data sources see[1][2][3]

Well History

Date Event
2011-06-17 New Permit Application
2011-07-21 Performed Spud Operation
2011-12-27 Drilling Completion
2012-02-11 Perforation
2012-10-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-03-19 2012-03-19 7,993 5,196,798

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Water 7732-18-5 100.00 86.89
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Other -(non hazardous) 70.00 0.02
Biocide - MC 8520 Multi-Chem Group Biocide 2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00006000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00055000
Sand Proppant Quartz 14808-60-7 100.00 12.55
Biocide - MC 8650 Multi-Chem Group Biocide
Other -(non hazardous) 40.00 0.00206000
Glutaraldehyde 111-30-8 60.00 0.00309000
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor
Other -(non hazardous) 50.00 0.00019000
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00019000
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor Other -(non hazardous) 100.00 0.00991000
Acid - 7.5 HCl Acid PPG Industries Acid Hydrochloric acid 7647-01-0 7.50 0.03
Other -(non hazardous) 92.50 0.45

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 964,135.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 434,530.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 354,986.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 265,091.00 338 0.00 0 0.00 0
2017 XTO ENERGY INC 239,912.00 342 0.00 0 0.00 0
2018 XTO ENERGY INC 266,211.51 356 0.00 0 0.00 0
2019 XTO ENERGY INC 238,619.49 352 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Produced Fluid 1,404.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 3,235.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Fracing Fluid Waste 72.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 XTO ENERGY INC Produced Fluid 15.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 XTO ENERGY INC Fracing Fluid Waste 2,556.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 1,404.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 2,792.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 XTO ENERGY INC Produced Fluid 104.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 XTO ENERGY INC Produced Fluid 3,072.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 215.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 215.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 898.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 638.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 3,460.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,794.46 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,391.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 222.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 319.45 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 109.96 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 2,338.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 87.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 156.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 82.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 2,872.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 185.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 187.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 1,133.51 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 196.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 1,495.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1989825 Primary Facility 2011-07-21 Drilling/Alteration No Violations Noted
1989827 Primary Facility 2011-07-20 Drilling/Alteration No Violations Noted
1991784 Primary Facility 2011-07-26 Drilling/Alteration No Violations Noted
1997745 Primary Facility 2011-08-19 Drilling/Alteration No Violations Noted
1997751 Primary Facility 2011-08-15 Drilling/Alteration No Violations Noted
1999118 Primary Facility 2011-08-24 Drilling/Alteration No Violations Noted
2001042 Primary Facility 2011-08-30 Drilling/Alteration No Violations Noted
2003401 Primary Facility 2011-09-14 Drilling/Alteration No Violations Noted
2005181 Primary Facility 2011-09-20 Routine/Complete Inspection No Violations Noted At the time of inspection, well ID sign, ES plan, ESCGP-1, and PPC plan present. Access road and pad adequately rocked. Secondary containment located pad beneath rig. Rig currently skidding from 2H to 4H; 2H not yet completed¿according to company man Eldon Adams. Noted minor changes to ES plan made 7-21-11 ---additional BMPs (rock lined ditches and compost sox¿s) added due to steep nature of fill slope side of well pad. Compost sox installed below gradient of pad and functioning properly. Noted minor ES concerns along slope facing Power Plant Road, but no accelerated erosion or sedimentation concerns observed off site. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Recommend operator seed/mulch or otherwise stabilize disturbed area located behind well site. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. No violations noted during this inspection.
2005604 Primary Facility 2011-09-20 Drilling/Alteration No Violations Noted
2011023 Primary Facility 2011-10-12 Drilling/Alteration No Violations Noted
2016284 Primary Facility 2011-11-02 Routine/Complete Inspection No Violations Noted At the time of inspection, Site ID sign, ESCGP-1, ES Plan, and PPC plan present, but recommend operator replace all and place in ziploc bag(or another waterproof measures) as documents located onsite are wet. Multi Well pad. Access road and pad adequately rocked. Well drilled not yet in production. Secondary containment located on pad beneath rig. UDI 61 Rig currently drilling 8H. No pits onsite, tanks utilized for drilling operations. Closed loop system being utilized, operator plans to remove all wastes (including cuttings) from site and transport to approved facility. Wood chips are being mixed with cuttings prior to final disposal. No IW or accelerated ES issues noted onsite. Bmp's installed and functioning properly. Operator should continue to monitor and maintain all BMPS until final restoration achieved. Company man informed department that area behind well pad is not related to drilling activities, but rather HCPP.
2025565 Primary Facility 2011-12-06 Drilling/Alteration No Violations Noted
2027672 Primary Facility 2011-12-14 Drilling/Alteration No Violations Noted
2029397 Primary Facility 2011-12-23 Drilling/Alteration No Violations Noted
2040015 Primary Facility 2012-01-30 Routine/Complete Inspection No Violations Noted nspection result of notification from Stephen Smith of Xto at 930 of possible ES concerns with hillside stability along power plant road. During inspection well drilled, rig off site. Sign ES plan, Escp-1 and PPC plan onsite. Three tanks onsite surrounded by temporary containment. Pad lined with temp containment, actively being disposed of. Production equipment actively being installed. The fill slope at the northern end of pad along power plant road appears to be sliding. AT the time of this inspection it does not appear that erosion has occurred outside LOD. Operator has contacted engineer and preliminary plans are to either install rock gabions and/or additional bmp's in order to aid in stabilization of slope. Vegetative matting previously installed also appears to have slid with material along fill slope. Road side ditches and culverts are going to be protected by bmp's in order to prevent a possible pollution event. Department cautioned operator on earth disturbance during warm, wet days due to instability of fill material.
2040104 Primary Facility 2012-02-01 Routine/Complete Inspection No Violations Noted
2041937 Primary Facility 2011-02-02 Follow-up Inspection No Violations Noted ollow up Inspection result of notification from Stephen Smith of XTO ON 1/30/12 (and inspection) of possible ES concerns with slope stability along power plant road. Field meeting conducted to review written response addressing the slope instability with myself, WQS Marc Maestra, Rick Palmer, and XTO reps Stephen Smith, Dan Rice, as well as XTO's engineer. During this meeting department noted that slope has moved slightly from 1/30/12 inspection. Although it appears that fill material is sliding down northern slope of pad near power plant RD, there again does not appear to be evidence of accelerated erosion and/or sedimentation issues outside of LOD at this time. Location of hillside failure is located near well heads and there is some distance (exacts not avaliable. ~100ft +) btw production equipment and location. Therefore, at this time XTO nor department feel that production equipment will be impacted by the slide and/or remediation efforts. A minor modification to ESCGP-1 shall be submitted to SWRO.
2045582 Primary Facility 2012-02-23 Follow-up Inspection No Violations Noted Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.
2045787 Primary Facility 2012-02-27 Follow-up Inspection No Violations Noted Follow up Inspection to examine remediation measures ongoing to address pad slope failure at multi well pad.At the time of today’s inspection, it appears operator has completed earth disturbance work related to the remediation of slope failure. The slope appears to have been re-grade and tapered to a 2:1 and 3:1 slope. In addition to a rocked lined ditch, swale, diversion pipe, and compos sox; operator installed erosion control mats over slope. Operator plans to seed/mulch areas this week. According to XTO rep Stephen Smith, the construction sequence outlined on January 30, 2012 was followed, except for the installation of a gabion wall. AT this time the operator feels that a gabion wall is not necessary, but operator will continue to closely monitoring the area and if any additional movement is noted a gabion wall will be installed.During inspection, no accelerated ES issues were noted on pad or access road. Department will conduct a follow up inspection to ensure slope failure has been successfully controlled/corrected.
2046717 Primary Facility 2012-02-27 Drilling/Alteration No Violations Noted
2088609 Primary Facility 2012-08-01 Routine/Complete Inspection No Violations Noted Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.
2109588 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted multi-well pad site ID signs, ES plan, and ESCGP-1 present.
2183589 Primary Facility 2013-06-13 Administrative/File Review In Compliance with Policy On-site meeting with XTO rep Dan Rice regarding site restoration. Mr. Rice requested meeting to discuss stabilization and express concerns pertaining to side slope on left side of pad when standing at pad entrance.
2247632 Primary Facility 2014-02-19 Routine/Partial Inspection No Violations Noted Site ID sign present, in compliance with Act 9 standards. ERP on-site. Permit numbers posted. Department recommends Operator remove posted permit numbers for any permits which are no longer valid.
2489584 Primary Facility 2016-05-25 Routine/Partial Inspection No Violations Noted Multi-well pad. At the time of this inspection, well 2H drilled and appears equipped for production. According to records, drilling occurred 7/22/2011-12/27/2011. Well tag present, legible.

Wells 3H, 4H, 8H drilled and appear equipped for production. Fence located around wells. Four on-site brine tanks appear sound, located within a lined, metal secondary containment unit. Access road stabilized. Site ID sign present, in compliance with Act 9 standards. ERP on-site. Inspection conducted with WQS Cindy Witham.

2502634 Primary Facility 2016-07-18 Routine/Complete Inspection No Violations Noted Multi-well Marcellus site. Well appears equipped for production.

At time of inspection site ID sign, well permit, E&S plan, ESCGP, and PPC plan all on site. No E&S issues observed in relation to the access road or the well pad. Well tag present and legible. Brine tank located in secondary containment appears structurally sound.

2519643 Primary Facility 2016-09-13 Routine/Complete Inspection No Violations Noted Multi-well Marcellus site.

At time of inspection Site ID sign, PPC plan, E&S plan, Well permit, and ESCGP on site. No E&S issues observed on access road. Well pad rocked, no E&S issues observed. It appears well is equipped for production. Well head surrounded by fence. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. The NOT for the ESCGP-1 associated with this well site (ESX09-063-0005) has been approved at the time of this inspection.

2654208 Primary Facility 2017-10-26 Routine/Complete Inspection No Violations Noted Well appears equipped for production.

Well head surrounded by security fence.

2668724 Primary Facility 2017-12-08 Routine/Complete Inspection No Violations Noted
2761106 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by security fence and cement barriers. Four brine tanks located on site.

For data sources see[8]

References