If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.461038,"lon":-79.036442,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: East Wheatfield Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: GLEN MACK 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-07-28 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.461038 | |
Longitude: -79.036442 |
Date | Event |
---|---|
2008-07-28 | New Permit Application |
2008-11-04 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PETRO DEV CORP | 8,424.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PETRO DEV CORP | 4,095.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PDC MOUNTAINEER LLC | 19,973.35 | 365 | 0.01 | 365 | 0.00 | 0 |
2012 | PDC MOUNTAINEER LLC | 4,279.63 | 365 | 0.01 | 366 | 0.00 | 0 |
2013 | PDC MOUNTAINEER LLC | 2,631.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | ALLIANCE PETRO CO LLC | 3,410.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ALLIANCE PETRO CO LLC | 3,241.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ALLIANCE PETRO CO LLC | 2,812.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 126.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 100.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 2,701.00 | 275 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PDC MOUNTAINEER LLC | Produced Fluid | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2014 | ALLIANCE PETRO CO LLC | Produced Fluid | 80 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | ALLIANCE PETRO CO LLC | Produced Fluid | 80.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2015 | ALLIANCE PETRO CO LLC | Produced Fluid | 80 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | ALLIANCE PETRO CO LLC | Produced Fluid | 80.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | ALLIANCE PETRO CO LLC | Produced Fluid | 78.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | ALLIANCE PETRO CO LLC | Produced Fluid | 78 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 85.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1873427 | Primary Facility | 2010-03-26 | Routine/Complete Inspection | No Violations Noted | According to records, permit was granted 7/28/09 and no record of WRAC submitted and approved at the DEP. Well completed with 8¿ pipe reduced to 4¿ pipe reduced 2¿ production pipe with shut off valves. Total gas volume meter showed a reading of 593 x 100 cubic ft. Data logger showed 125/ 0 psi. Production equipment contained 100 bbl unit with 50 bbl fluid and separator (100 psi). Based on site conditions, no indication of IW or E&S issues at the site. Well tag present. No gas leaks around well head and production equipment |
2306736 | Primary Facility | 2014-09-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was in production |
2396524 | Primary Facility | 2015-08-07 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well tag present and legible. Brine tank appears structurally sound. Site appears permanently stabilized. Well equipped for production. Inspected with WQS S. Foulk. |
2486160 | Primary Facility | 2016-05-18 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2511800 | Primary Facility | 2016-08-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
For data sources see[7]