If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-35265 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.434275,"lon":-78.989231,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: East Wheatfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: KEILMAN 8189 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2007-03-23 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.434275 | |
Longitude: -78.989231 |
Date | Event |
---|---|
2007-03-23 | New Permit Application |
2007-10-19 | Performed Spud Operation |
2007-11-01 | Drilling Completion |
2008-03-14 | NEWLY DRILLED |
2014-08-29 | Drilling Completion |
2016-06-28 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | LINN OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | LINN OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | XTO ENERGY INC | Drilling | 160.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2014 | XTO ENERGY INC | Servicing Fluid | 470.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1800671 | Primary Facility | 2009-05-13 | Routine/Complete Inspection | No Violations Noted | inactive status requested/0 psi surface casing annulus/tag ok |
2285373 | Primary Facility | 2014-07-07 | Administrative/File Review | In Compliance with Policy | On-site pre-construction meeting as requested by Operator representative Dan Rice to review E&S plan prior to commencement of plugging operations. Present parties include WQS Samantha Foulk, Operator representatives Dan Rice and Jason Canose, Mary Kimmel, Phil Morris, and Enterprise representative Phil H. |
2312152 | Primary Facility | 2014-10-09 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well plugged.Plugging completed in August 2014.Aboveground monument installed with permit number affixed. Well spudded 10/19/07, never completed.Regulatory inactive status granted 5/22/09.Prior agreement existed between Opr and Dept regarding timeline of plugging operations.Located adjacent to tree nursery.Pad stable at this time.BMPs functioning properly.Shared AR rocked, in good condition.No accel E&S issues observed.One tank remains on-site.Per current regulations, within 9 months after plugging a well, Opr shall remove all production or storage facilities, supplies and equipment and restore the well site.Hence, Opr has until May 2015 to achieve permanent stabilization and restoration of the well site and remove all associated equipment.Opr shall then submit a well site restoration report to Dept within 60 days after the date of restoration per current regulations.Department recommends Operator continue to monitor and maintain well site in order to ensure final restoration is achieved. |
For data sources see[7]