If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-27718 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.974924,"lon":-80.36833,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Morris Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 155389 | |
Farm/Lease Name: CONSOL MOR10KHSU | |
License Status: Active | |
Spud Date: 2018-09-23 | |
Permit Date: 2018-08-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.974924 | |
Longitude: -80.368330 |
Date | Event |
---|---|
2018-08-02 | New Permit Application |
2018-08-26 | Performed Spud Operation |
2019-04-15 | Drilling Completion |
2020-01-24 | Deviated |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CNX GAS CO LLC | 1,836,882.14 | 132 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CNX GAS CO LLC | Drill Cuttings | 957.01 Tons | LANDFILL | 100172 |
2018 | CNX GAS CO LLC | Drilling Fluid Waste | 57.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | CNX GAS CO LLC | Drilling Fluid Waste | 168.50 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Drill Cuttings | 94.12 Tons | LANDFILL | 06-08438 |
2018 | CNX GAS CO LLC | Produced Fluid | 55.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018 | CNX GAS CO LLC | Produced Fluid | 652.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 31.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 56.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | CNX GAS CO LLC | Produced Fluid | 218.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018 | CNX GAS CO LLC | Synthetic Liner Materials | 0.15 Tons | LANDFILL | 100663 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 285.30 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Produced Fluid | 51.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | CNX GAS CO LLC | Drill Cuttings | 18.02 Tons | LANDFILL | 100663 |
2018 | CNX GAS CO LLC | Produced Fluid | 125.70 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CNX GAS CO LLC | Drilling Fluid Waste | 177.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 34.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2018 | CNX GAS CO LLC | Drilling Fluid Waste | 49.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2018 | CNX GAS CO LLC | Drilling Fluid Waste | 4.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-184 |
2018 | CNX GAS CO LLC | Synthetic Liner Materials | 1.93 Tons | LANDFILL | 100277 |
2019 | CNX GAS CO LLC | Soil Contaminated by Oil | 0.10 Tons | LANDFILL | CID # 28726 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 8.50 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 140.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Produced Fluid | 421.70 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 9.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-184 |
2019 | CNX GAS CO LLC | Drill Cuttings | 311.83 Tons | LANDFILL | 06-08438 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 137.90 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Soil Contaminated by Oil & Gas Related Spills | 0.10 Tons | LANDFILL | CID # 28726 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 417.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | CNX GAS CO LLC | Produced Fluid | 11.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 15.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 2014-184 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 56.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2019 | CNX GAS CO LLC | Waste Water Treatment Sludge | 4.33 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CNX GAS CO LLC | Produced Fluid | 10.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2019 | CNX GAS CO LLC | Drill Cuttings | 1,487.28 Tons | LANDFILL | 100172 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 5.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 20.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 276.40 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Produced Fluid | 11.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 7.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CNX GAS CO LLC | Synthetic Liner Materials | 3.42 Tons | LANDFILL | 100172 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2019 | CNX GAS CO LLC | Produced Fluid | 36.12 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CNX GAS CO LLC | Produced Fluid | 26.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 112.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 36.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | CNX GAS CO LLC | Produced Fluid | 6.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | CNX GAS CO LLC | Produced Fluid | 327.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 1,187.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 36.40 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Produced Fluid | 5,996.70 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 88.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 8.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 102.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2019 | CNX GAS CO LLC | Drilling Fluid Waste | 74.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2767706 | Primary Facility | 2018-08-27 | Drilling/Alteration | No Violations Noted | The well was spud on 8/25/18. The operator drilled a 36" hole to 100'. A 30" diameter conductor pipe has been installed at 100' and cemented to the surface. A well cellar has also been installed. |
2786671 | Primary Facility | 2018-10-10 | Drilling/Alteration | No Violations Noted | Surface, coal protective, and intermediate casings have been set and cemented to the surface. Top hole portion of the well has been completed. Rig off well. |
2854514 | Primary Facility | 2019-03-12 | Drilling/Alteration | No Violations Noted | Surface, coal, intermediate #1, and intermediate #2 casings have been set and cemented. Rig off well. |
For data sources see[7]