X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26522

Well Details

Well ID: 37-059-26522
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Richhill Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 151210
Farm/Lease Name: WHIPKEY
License Status:
Spud Date: 2014-07-12
Permit Date: 2014-05-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.878886
Longitude: -80.381972

For data sources see[1][2][3]

Well History

Date Event
2014-05-22 New Permit Application
2014-07-08 Performed Spud Operation
2014-11-06 Drilling Completion
2015-03-14 Drilling Completion
2016-01-19 Perforation
2016-01-20 Performed Stage 1 of Stimulation
2016-01-21 Performed Stage 2 of Stimulation
2016-01-21 Performed Stage 3 of Stimulation
2016-01-22 Performed Stage 4 of Stimulation
2016-01-22 Performed Stage 5 of Stimulation
2016-01-22 Performed Stage 6 of Stimulation
2016-01-24 Performed Stage 7 of Stimulation
2016-01-24 Performed Stage 8 of Stimulation
2016-01-25 Performed Stage 10 of Stimulation
2016-01-25 Performed Stage 11 of Stimulation
2016-01-25 Performed Stage 9 of Stimulation
2016-01-26 Performed Stage 12 of Stimulation
2016-01-26 Performed Stage 13 of Stimulation
2016-07-28 Deviated
2016-07-28 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-20 2016-01-26 7,912 5,024,380 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Sand (Proppant), Ne-100, CI-150,
FE-100L, Hydrochloric Acid (5%)
FTS Proppant, Non Emulsifier, Corrosion Inhibitor, Iron Control, Acidizing Isopropanol 67-63-0 30 0.000546011 228.019
Organic amine resin salt Proprietary 30 0.000546011 228.019
Ethylene Glycol 107-21-1 30 0.000546011 228.019
2-Propanol 67-63-0 10 0.00007913 33.046
2-butoxyethanol 111-76-2 10 0.00007913 33.046
Polyalkylene glycol Proprietary 10 0.000182004 76.006
Aromatic aldehyde Proprietary 30 0.000546011 228.019
Citric acid 77-92-9 75 0.00224807 938.813
Dodecylbenzenesulfonic acid 27176-87-0 5 0.00003957 16.523
Quaternary ammonium compound Proprietary 10 0.000182004 76.006
Silica 14808-60-7 99.9 15.2346 6,362,090.0
Dimethylformamide 68-12-2 10 0.000182004 76.006
Hydrogen Chloride 7647-01-0 5 0.0444717 18571.8
SC-30, Cl02, SFR-430, SC-82 X-Chem Scale Inhibitor, Biocide, Friction Reducer, Scale Inhibitor Alcohols, C12-14, ethoxylated 68439-50-9 3.5 0.00473566 1977.65
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0405914 16951.3
Alcohols, C12-16, ethoxylated 68551-12-2 3.5 0.00473566 1977.65
Citric acid, monohydrate 5949-29-1 2 0.00270609 1130.09
Chlorine Dioxide 10049-04-4 0.4 0.000119078 49.728
Hydrochloric Acid 7647-01-0 3 0.00002091 8.732
Inerts NA 99.9 0.0297397 12419.5
Methanol 67-56-1 1 0.00000697 2.911
Alcohols, C10-16, ethoxylated 68002-97-1 3.5 0.00473566 1977.65
Sodium Hydroxide 1310-73-2 1.5 0.000223476 93.325
Water Consol Carrier/Base Fluid Water 7732-18-5 100 83.6745 34,943,200.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-01-20 1 Ottowa Sand 0 8,741 9,092
2016-01-21 2 Ottowa Sand 0 8,617 9,222
2016-01-21 3 Ottowa Sand 0 8,493 8,739
2016-01-22 4 Ottowa Sand 0 8,614 9,063
2016-01-22 5 Ottowa Sand 0 8,586 9,142
2016-01-22 6 Ottowa Sand 0 8,520 9,263
2016-01-24 7 Ottowa Sand 0 8,746 9,276
2016-01-24 8 Ottowa Sand 0 8,709 9,084
2016-01-25 9 Ottowa Sand 0 8,580 9,172
2016-01-25 10 Ottowa Sand 0 8,787 9,088
2016-01-25 11 Ottowa Sand 0 8,805 9,222
2016-01-26 12 Ottowa Sand 0 8,700 9,139
2016-01-26 13 Ottowa Sand 0 8,697 9,126

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2016 CNX GAS CO LLC 1,046,595.55 242 0.00 0 0.00 0
2017 CNX GAS CO LLC 907,759.61 364 0.00 0 0.00 0
2018 CNX GAS CO LLC 558,288.24 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 430,714.73 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CNX GAS CO LLC Drill Cuttings 764.69 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 290.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Drilling Fluid Waste 1,177.08 Bbl LANDFILL 301071
2014 CNX GAS CO LLC Drilling Fluid Waste 383.72 Bbl LANDFILL PAD059087072
2015 CNX GAS CO LLC Drill Cuttings 228.50 Tons LANDFILL PAD059087072
2015 CNX GAS CO LLC Drilling Fluid Waste 52.32 Bbl LANDFILL PAD059087072
2015 CNX GAS CO LLC Drill Cuttings 74.06 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Drilling Fluid Waste 84.55 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2016 CNX GAS CO LLC Produced Fluid 7,105.72 Bbl INJECTION DISPOSAL WELL 34-157-25511
2016 CNX GAS CO LLC Produced Fluid 1,370.61 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Fracturing Fluid Waste 51.10 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 628.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 3,427.90 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 7.02 Bbl INJECTION DISPOSAL WELL 34-059-24202
2016 CNX GAS CO LLC Produced Fluid 42,411.73 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC Produced Fluid 504.20 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Other Oil & Gas Wastes 58.22 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 27.22 Bbl INJECTION DISPOSAL WELL 34-119-28780
2017 CNX GAS CO LLC Produced Fluid 4,877.99 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 1,138.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 36.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017 CNX GAS CO LLC Produced Fluid 658.74 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 2,604.32 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 671.19 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 1,392.83 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 1,310.15 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 18.33 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Other Oil & Gas Wastes 5.78 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 408.44 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 90.88 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 976.03 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 92.22 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 CNX GAS CO LLC Produced Fluid 2.07 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Produced Fluid 81.07 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Produced Fluid 611.02 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 13.33 Bbl INJECTION DISPOSAL WELL 34-013-20609
2018 CNX GAS CO LLC Produced Fluid 4,909.46 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 9.44 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 67.06 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Produced Fluid 191.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 0.56 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Produced Fluid 2,014.42 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Other Oil & Gas Wastes 12.22 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 268.88 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 293.62 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 132.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 286.43 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 1,953.36 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 12.22 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2292028 Primary Facility 2014-07-17 Drilling/Alteration No Violations Noted CONDUCTOR SET 80' OF 30". YOST RIG 6 ON SITE DRILLING TOP HOLE SETS.
2364421 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Well is drilled to TD. Well waiting for fracking activitiies to start.
2406814 Primary Facility 2015-05-07 Routine/Complete Inspection No Violations Noted Well drilled to TD. Well waiting for hydraulic fracturing operations to begin.
2450508 Primary Facility 2016-02-16 Administrative/File Review In Compliance with Policy An accidental release of approximately 6.7 barrels of brine occurred on Saturday, February 13, 2016 at the GH53HS Well Pad located in Richhill Township, Greene County. The release occurred around 11:20 a.m. and resulted from a stressed hose connection that failed thereby releasing brine from a manifold and onto containment. The spill was completely contained and no environmental impacts had occurred. All released material was then cleaned from containment with a vacuum truck. This incident is considered to be In Compliance with Policy (ICP), given that the operator completely contained the release and properly reported the incident in accordance with the current spill policy guidance. No violations are being cited at this time.
2480047 Primary Facility 2016-03-30 Routine/Complete Inspection No Violations Noted Well drilled to completion and currently in flow back operations.
2493139 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted Well drilled to TD. Well currently in flowback operations.
2510130 Primary Facility 2016-07-26 Routine/Complete Inspection No Violations Noted Well drilled to completion and capable of production.
2720451 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted The well is properly identified, equipped for production, and is producing.

For data sources see[9]

References