If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26252 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.896717,"lon":-79.995867,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Cumberland Township | |
Operator Name: GREYLOCK PROD LLC | |
Well Pad ID: 145203 | |
Farm/Lease Name: BARTHOLOMEW B 4MH | |
License Status: | |
Spud Date: | |
Permit Date: 2013-08-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.896717 | |
Longitude: -79.995867 |
Date | Event |
---|---|
2013-08-08 | New Permit Application |
2013-08-23 | Performed Spud Operation |
2013-11-27 | Drilling Completion |
2014-01-30 | Perforation |
2014-01-30 | Performed Stimulation |
2016-03-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-01-30 | 2014-02-03 | 8,000 | 5,616,030 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Hib A | Universal Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00854 | 4475.01 |
Proppant-40/70 | Universal Well Services | Proppant | crystalline silica quartz | 14808-60-7 | 100 | 7.4305 | 3,895,900.0 | |
Unihib G | Universal Well Services | Corrosion Inhibitor for Acid | Short chained glycol ether | N/A | 25 | 0.00014 | 71.272 | |
2-Ethyl Hexanol | 104-76-7 | 75 | 0.00041 | 213.815 | ||||
Water | ECA | Base Fluid | Water | N/A | 100 | 89.2246 | 46,781,500.0 | |
WGA-3, CMHPG | Universal Well Services | Dry Gellant | Guar Gum | 9000-30-0 | 100 | 0.00181 | 950 | |
15% Hydrochloric Acid (UWS) | Universal Well Services | Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.09416 | 49370 | |
Proppant-100 Mesh | Universal Well Services | Proppant | crystalline silica quartz | 14808-60-7 | 100 | 2.58358 | 1,354,600.0 | |
Unislick ST-50 | Universal Well Services | Friction Reducer | Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.02235 | 11716.3 | |
LEB 10X | Universal Well Services | Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00035 | 184.451 | |
EC6116A | Universal Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.0083 | 4350.01 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.01659 | 8700.02 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00138 | 725.002 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-01-30 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | ENERGY CORP OF AMER | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ENERGY CORP OF AMER | 575,103.00 | 324 | 0.00 | 0 | 0.00 | 0 |
2015 | ENERGY CORP OF AMER | 541,573.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | ENERGY CORP OF AMER | 385,884.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERGY CORP OF AMER | 294,733.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | GREYLOCK PROD LLC | 252,759.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | GREYLOCK PROD LLC | 216,407.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | ENERGY CORP OF AMER | Drilling Fluid Waste | 1,300.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | ENERGY CORP OF AMER | Drill Cuttings | 828.80 Tons | LANDFILL | 100419 |
2014 | ENERGY CORP OF AMER | Produced Fluid | 5,753.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ENERGY CORP OF AMER | Fracing Fluid Waste | 12,840.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ENERGY CORP OF AMER | Produced Fluid | 360.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | ENERGY CORP OF AMER | Produced Fluid | 270.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | ENERGY CORP OF AMER | Produced Fluid | 1,625.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ENERGY CORP OF AMER | Produced Fluid | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 509.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 192.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016 | ENERGY CORP OF AMER | Produced Fluid | 965.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | ENERGY CORP OF AMER | Produced Fluid | 85.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | ENERGY CORP OF AMER | Produced Fluid | 1,040.00 Bbl | REUSE (AT WELL PAD) | |
2018 | GREYLOCK PROD LLC | Produced Fluid | 545.25 Bbl | REUSE (AT WELL PAD) | |
2018 | GREYLOCK PROD LLC | Produced Fluid | 61.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | GREYLOCK PROD LLC | Produced Fluid | 142.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | GREYLOCK PROD LLC | Produced Fluid | 35.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 9.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 12.98 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 14.25 Bbl | REUSE (AT WELL PAD) | |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 28.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 342.00 Bbl | REUSE (AT WELL PAD) | |
2019 | GREYLOCK PROD LLC | Other Oil & Gas Wastes | 25.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW031 |
2019 | GREYLOCK PROD LLC | Produced Fluid | 295.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2206229 | Primary Facility | 2013-09-18 | Drilling/Alteration | No Violations Noted | VERTICAL SECTION DRILLED TO COMPLETION. WELL COMPLIANT AT TIME OF INSPECTION. |
2234643 | Primary Facility | 2013-12-20 | Drilling/Alteration | No Violations Noted | WELL DRILLED TO COMPLETION. CREWS ON SIGHT SETTING UP FOR STIMULATION PROCESS. |
2444546 | Primary Facility | 2016-01-07 | Administrative/File Review | No Violations Noted |
On 01/07/16 at approximately 0830 hours I conducted an administrative inspection in response to a request for restoration extension submitted by ECA. Drilling activities for the last well (#2) were completed on 12/10/13 according to Department records. The 9 month date for restoration was 09/10/2014. The request for restoration extension was received on 10/09/2015. A violation of Section 3216(c) of Chapter 32 of Act 13 has occurred for failure to restore the site within 9 months of completion of drilling a well. The extension request is being denied. |
2688259 | Primary Facility | 2018-01-04 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place. The site was snow covered and vegetative cover could not be inspected. Multiple brine tank valves appeared to be leaking. It is recommended the brine tanks be inspected to insure a release is not occurring. |
For data sources see[9]