X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25262

Well Details

Well ID: 37-059-25262
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Wayne Township
Operator Name: CONTURA PENNSYLVANIA LAND LLC
Well Pad ID:
Farm/Lease Name: TERRY & JANE COLE DD-11S
License Status:
Spud Date:
Permit Date: 2009-07-28
Well Type: COALBED METHANE
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 39.790084
Longitude: -80.267210

For data sources see[1][2][3]

Well History

Date Event
2009-07-28 New Permit Application
2009-07-31 Performed Spud Operation
2009-09-03 Drilling Completion
2010-01-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 COAL GAS RECOVERY LP 40346.00 101 0.00 0 0.00 0
2010 COAL GAS RECOVERY LP 118,722.00 360 0.00 0 0.00 0
2011 COAL GAS RECOVERY LLC 121,327.00 353 0.00 0 0.00 0
2012 COAL GAS RECOVERY LLC 99,562.00 363 0.00 0 395.92 363
2013 COAL GAS RECOVERY II LLC 100,040.00 365 0.00 0 0.00 0
2014 COAL GAS RECOVERY II LLC 99,480.00 362 0.00 0 0.00 0
2015 COAL GAS RECOVERY II LLC 93,790.00 365 0.00 0 0.00 0
2016 COAL GAS RECOVERY II LLC 24,280.00 236 0.00 0 0.00 0
2017 COAL GAS RECOVERY II LLC 0.00 0 0.00 0 0.00 0
2018 CONTURA PENNSYLVANIA LAND LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 COAL GAS RECOVERY LP Brine 9,684.00 Bbl Brine or Industrial Waste Treatment Plt 30753712
2009 COAL GAS RECOVERY LP Brine 2,672.00 Bbl Brine or Industrial Waste Treatment Plt PBR-A2392008
2010 COAL GAS RECOVERY LP Produced Fluid 9,979.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA-2392008
2011 COAL GAS RECOVERY LLC Produced Fluid 1,226.00 Bbl INJECTION DISPOSAL WELL 2D0550319
2011 COAL GAS RECOVERY LLC Produced Fluid 1,684.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026913
2011 COAL GAS RECOVERY LLC Produced Fluid 3,306.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA-2392008
2012 COAL GAS RECOVERY LLC Produced Fluid 728.75 Bbl INJECTION DISPOSAL WELL 2D0550319
2013 COAL GAS RECOVERY II LLC Produced Fluid 3,182.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR132
2014 COAL GAS RECOVERY II LLC Produced Fluid 2,747.98 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR132
2015 COAL GAS RECOVERY II LLC Produced Fluid 534.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR132
2017 COAL GAS RECOVERY II LLC Produced Fluid 95.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[6]

References