X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-053-28075

Well Details

Well ID: 37-053-28075
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: BULL RUN RESOURCES LLC
Well Pad ID:
Farm/Lease Name: MADISON 27
License Status: ACTIVE
Spud Date:
Permit Date: 2005-11-21
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.583229
Longitude: -79.018368

For data sources see[1][2][3]

Well History

Date Event
2005-11-21 New Permit Application
2006-03-31 Performed Spud Operation
2006-04-04 Drilling Completion
2006-05-26 Perforation
2007-01-26 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 SYND ENTERPRISES INC 729.10 180 195.30 180 0.00 0
2007 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2008 CATALYST ENERGY INC 363.86 365 104.76 365 0.00 0
2009 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 963.2 365 101.05 365 0.00 0
2011 CATALYST ENERGY INC 274.75 365 179.40 365 0.00 0
2012 CATALYST ENERGY INC 705.00 366 164.10 366 17 366
2014 CATALYST ENERGY INC 185.4 180 15.25 180 7.52 180
2015 CATALYST ENERGY INC 220.65 243 53.09 243 3.05 243
2016 CATALYST ENERGY INC 293.55 335 68.04 335 0.93 335
2017 CATALYST ENERGY INC 455.55 365 106.71 365 0.00 0
2018 BULL RUN RESOURCES LLC 396.05 365 89.50 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 16.45 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CATALYST ENERGY INC Produced Fluid 39.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CATALYST ENERGY INC Produced Fluid 17.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 8.52 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 8.52 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 12.48 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 4.50 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2016 CATALYST ENERGY INC Produced Fluid 4.40 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 4.75 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 CATALYST ENERGY INC Produced Fluid 7.50 Bbl ROAD SPREADING
2016 CATALYST ENERGY INC Produced Fluid 4.75 Bbl CENT WASTE TRT FAC NPDES PA0102784
2017 CATALYST ENERGY INC Produced Fluid 10.24 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 5.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 8.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 BULL RUN RESOURCES LLC Produced Fluid 12.50 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 BULL RUN RESOURCES LLC Produced Fluid 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 BULL RUN RESOURCES LLC Produced Fluid 12.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 BULL RUN RESOURCES LLC Produced Fluid 8.50 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1527357 Primary Facility 2006-04-05 Drilling/Alteration No Violations Noted
1582194 Primary Facility 2006-11-22 Routine/Complete Inspection Violation(s) Noted
1587247 Primary Facility 2006-12-14 Routine/Complete Inspection No Violations Noted 3 1/2" frac pipe remains in well
1595706 Primary Facility 2007-01-25 Routine/Complete Inspection No Violations Noted
1597852 Primary Facility 2007-01-25 Routine/Complete Inspection No Violations Noted
1599247 Primary Facility 2007-02-01 Routine/Complete Inspection No Violations Noted
2416215 Primary Facility 2015-10-15 Routine/Complete Inspection No Violations Noted
2770747 Primary Facility 2018-08-30 Routine/Complete Inspection No Violations Noted Routine inspection. Telephoned Sam Harvey about the pipe left on location. He said he would have it removed.
2785667 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Follow up to inspection of 8/30/18. Pipe still on location. Will telephone Sam Harvey.
2790056 Primary Facility 2018-10-15 Routine/Complete Inspection No Violations Noted Follow up to inspections of 8/30/18 and 10/3/18. Pipe has been removed from the well location, as discussed.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1582194 503151 11/22/2006 2006-11-22 78.73B - Excessive casing seat pressure Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
503151 217581 ADORD - Administrative Order Comply/Closed 2007-06-22
503151 223260 CDEC - Consent Decree $400,000.00 $375,000.00

For data sources see[7]

References