X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24589

Well Details

Well ID: 37-051-24589
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 144950
Farm/Lease Name: RITTER UNIT 6H
License Status:
Spud Date:
Permit Date: 2013-12-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.989128
Longitude: -79.8163

For data sources see[1][2][3]

Well History

Date Event
2013-12-17 New Permit Application
2014-01-03 Performed Spud Operation
2014-06-10 Drilling Completion
2014-12-08 Perforation
2014-12-08 Performed Stimulation
2016-02-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-08 2014-12-31 8,292 8,098,160

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.0011577 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 10.4871 0
EC6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00072935 0
Polyethylene Glycol 25322-68-3 60 0.0014587 0
Dibromoacetonitrile 3252-43-5 5 0.00012156 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00075357 0
J580 Schlumberger Gelling Agent, Water Carbohydrate Polymer Proprietary 100 0.0224603 0
A264 Schlumberger Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 10 0.00001110 0
Methanol 67-56-1 40 0.00004439 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00003329 0
Aliphatic acids Proprietary 30 0.00003329 0
15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.00929716 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00033385 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00079845 0
B466 Schlumberger Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00336213 0
Alcohol Ethoxylates Proprietary 5 0.00056035 0
Ammonium Acetate 631-61-8 6 0.00067243 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 89.3528 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-12-08 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 1,030,314.00 224 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 1,026,017.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 738,393.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 578,873.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 471,156.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 637.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drill Cuttings 504.16 Tons LANDFILL 100419
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1.88 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 43.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drill Cuttings 72.53 Tons LANDFILL 100592
2014 CHEVRON APPALACHIA LLC Drill Cuttings 353.88 Tons LANDFILL 100172
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 7.28 Tons LANDFILL 100277
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,980.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 34.59 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,121.89 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 6,963.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 3.24 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,349.94 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 2,537.64 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 5,411.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 205.40 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 602.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 99.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 13.75 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 151.88 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 280.14 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 56.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 606.28 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 68.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 0.35 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CHEVRON APPALACHIA LLC Produced Fluid 32.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Produced Fluid 694.75 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2246244 Primary Facility 2014-02-11 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, KEANE DRILLING ON AIR @ 759' (TD). RUNNING COAL PROTECTION CASING AND CEMENTING ( 2/11/2014). GROUTING BACKSIDE TOOK 175 BLLS OF CEMENT WHICH NORMALLY DONE IN 60 BBLS.THE OPERATOR SHOULD CONSIDER A (CBL) TO VERIFY PROPER CEMENT BOND AND QUANITY OF CEMENT.
2246246 Primary Facility 2014-02-10 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, KEANE DRILLING ON AIR @ 622' (TD). RUNNING WATER PROTECTION CASING AND CEMENTING TODAY (2/9/2014).
2249563 Primary Facility 2014-02-28 Routine/Complete Inspection No Violations Noted On 2/28/2014, the Department conducted a inspection of Chevron Appalachia’s Ritter 1,2,4,5, 6, 7, 8 H well site in Redstone Twp., Fayette County.
2260351 Primary Facility 2014-03-13 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, PREPAIRING LOCATION FOR PATTERSON # 339 IN ABOUT 1- WEEK..
2274128 Primary Facility 2014-05-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS,MOVING ON TO RITTER # 6-- H TODAY (5/26/2014). TESTING (BOP) AND FINISH RIGGING -UP.
2276384 Primary Facility 2014-05-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, MOVING ON TO RITTER # 6 - H STARTING (5/26/2014). RIGGING -UP AND TESTING (BOP).
2276387 Primary Facility 2014-05-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON 8.2 # OIL BASE MUD @ 2340' (TD ). RUNNING INTERMEDIATE CASING AND CEMENTING TODAY.
2276395 Primary Facility 2014-06-02 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON 8.2 # OIL BASE MUD @ 7245' (KOP) TODAY.
2276413 Primary Facility 2014-06-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON 12.4 # OIL BASE MUD @ 10,741' TODAY . ALL LOOKS GOOD.
2277584 Primary Facility 2014-06-10 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, DRILLING ON 12.4 # OIL BASE MUD @ 15190 ' TODAY . RUNNING 51/2" PROD. CASIND AND CEMENTING TODAY.(6/9/2014).CEMENNT TOP IS DETERMINE TO BE AT 1500' FROM SURFACE.A (CBL) IS RECOMMENDED PRIOR TO PRESSURE TESTING TO DETERMINE CEMENT TOP MEETS (DEP) REGS.
2353455 Primary Facility 2015-03-19 Routine/Complete Inspection No Violations Noted Well development activities were ongoing at the time of the inspection. Three constructed AST's were located onsite within secondary containment. Baker tanks and sealed roll-off boxes were also located onsite on secondary containment. No evidence of any spills or discharges to the containment or ground was observed during the site inspection. There was no observed accelerated erosion or sedimentation in relation to the site or access road and all erosion controls appeared to have been properly maintained.
2362456 Primary Facility 2015-04-13 Routine/Complete Inspection No Violations Noted
2430107 Primary Facility 2015-12-04 Routine/Complete Inspection No Violations Noted Routine complete inspection for ESCGP-2, no violations.
2463115 Primary Facility 2016-03-09 Routine/Complete Inspection No Violations Noted

On 03/09/16 at approximately 0900 hours I conducted a routine complete inspection of the Ritter Unit. The Act 9 sign was in place and all required documents were present at the mail box.

The site had recently been partially restored and hydroseeded (see photographs). There were no E&S issues noted at the time of inspection.

2479017 Primary Facility 2016-04-25 Routine/Complete Inspection No Violations Noted

On 04/25/16 at approximately 1000 hours I conducted a routine complete inspection of the site. The Act 9 sign was in place and all required documents were present in the mail box. The site had recently been partially restored. The site exhibited good vegetative growth (See photograph). There were no violations observed at the time of inspection.

2488193 Primary Facility 2016-05-05 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS, Routine Inspection all looks good.
2524249 Primary Facility 2016-09-06 Routine/Complete Inspection No Violations Noted On 09/06/16 at approximately 0700 hours I conducted a routine complete inspection of the Ritter Unit. The Act 9 sign was in place and all required documents were present at the site. The site had been restored this spring and was very well vegetated. There were no signs of erosion at the time of inspection. There were no violations observed at the time of inspection.
2549568 Primary Facility 2016-12-07 Routine/Complete Inspection No Violations Noted

On 12/07/16 at approximately 0800 hours I conducted a routine complete inspection of the Ritter Unit. The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated, but a location near the gate to the well pad appeared to have been driven on by equipment and is recommended to be seeded in spring. A modification had been submitted and approved to address differences between as built and permitted pad areas. There were no signs of erosion at the time of inspection. There were no violations observed at the time of inspection.

2574627 Primary Facility 2017-03-23 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. A location that previously had ruts had been repaired and mulched. The production equipment appeared to be in good condition. There were no violations observed.
2620240 Primary Facility 2017-07-10 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal by Chevron. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. The site meets the requirements for permit termination. The NOT is approved.
2674131 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the time of inspection. The site was well vegetated and there were no signs of erosion observed at the time of inspection. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2683933 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted Well appears to be producing.
2715188 Primary Facility 2018-04-06 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. There were no violations observed at the time of inspection.
2759630 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2785859 Primary Facility 2018-10-09 Routine/Complete Inspection No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2855801 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted On 03/14/19 at approximately 1020 hours I conducted a routine complete inspection. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.

For data sources see[9]

References