37-049-25391

Well Details

Well ID: 37-049-25391
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: Elk Creek Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: ARTELLO 2
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 2011-12-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.866306
Longitude: -80.278778

For data sources see[1][2][3]

Well History

Date Event
2011-12-09 New Permit Application
2012-01-02 Performed Spud Operation
2012-01-20 Drilling Completion
2012-03-21 Drilling Completion
2012-05-17 FULLY PLUGGED
2012-06-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ENERVEST OPR LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2030745 Primary Facility 2011-12-29 Routine/Complete Inspection No Violations Noted Upon inspection I found this new well pad completed and ready for the rig to operate. The permit and E&S Plan are posted. The BMPs are in place. The access road has been stoned and is in good conditon. Pits are dug and lined with required liner. Rig is sitting on the well pad ready to spud. No Violations.
2031266 Primary Facility 2012-01-04 Drilling/Alteration No Violations Noted
2032574 Primary Facility 2012-01-09 Drilling/Alteration No Violations Noted
2033291 Primary Facility 2012-01-11 Drilling/Alteration No Violations Noted
2034458 Primary Facility 2012-01-10 Routine/Complete Inspection No Violations Noted Upon inspection I found the rig on site and drilling. The Permit and E&S Plan where posted. The E&S Plan was implemented. The access road was in good shape. Both pits had over 4 ft of freeboard. Well pad had small amount of runoff running through the slit fence, with all sediment contained in fence.
2035214 Primary Facility 2012-01-13 Drilling/Alteration No Violations Noted
2038628 Primary Facility 2012-01-30 Follow-up Inspection No Violations Noted Follow-up inspection to determine if the BMPs have been repaired and maintained over the past 3 weeks since the well pad was installed and the well drilled. The rig remains on-site. The site BMPs are in place. The pits are open with over 2 ft of freeboard. The access road is in good condition.
2041624 Primary Facility 2012-02-09 Routine/Complete Inspection No Violations Noted
2091150 Primary Facility 2012-08-02 Site Restoration No Violations Noted