Well Details

Well ID: 37-049-25368
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: North East Township
Operator Name: LAKE ERIE ENERGY PART LLC
Well Pad ID:
Farm/Lease Name: RAHAL 4
License Status:
Spud Date:
Permit Date: 2010-09-22
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 42.228183
Longitude: -79.790397

For data sources see[1][2][3]

Well History

Date Event
2010-09-22 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 LAKE ERIE ENERGY PART LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1933757 Primary Facility 2010-12-13 Routine/Complete Inspection No Violations Noted
1946844 Primary Facility 2011-01-31 Routine/Complete Inspection Violation(s) Noted Today Scott Lux and I stopped at this new well site to determine if the 200' setback requirerments found in Section 601.205 (a) on Act 223 have been met. Upon arrving at the site we found recent earth moving had been done to begin construction of the well pad. The access road appeared to be an exsisitng driveway. The E&S Plan, and Well Site ID where in place. We also found slit fence installed as outlined in the E&S Plan. We measured the distance from the Well marker stake to a building that housed a business known as "Cost Effective Coatings", and found the distacne to be 123'. If the Well is located at this marker stake, a violation of Section 601.205 will take place. We also noted that the well pad is very close to a active railroad, and that the rig tiedown straps maybe in the railraod right of way.
1958560 Primary Facility 2011-03-17 Complaint Inspection No Violations Noted This inspection was the result of complaint # 277882. Upon invesitgating I found no evidence of E&S violations. I did met both the complainant and dirt contractor, Charlie Rahal on-site at different times to discuss the complaint. I explained to the complainant that DEP had no jurisdiction over the matter of access road use, and that this was a civil matter. I also explained DEP would complete a site inspection and let him know what we found.
2004655 Primary Facility 2011-09-22 Site Restoration No Violations Noted This well was never drilled however the site was partially constructed. Upon inspection i found the site under the reclaim process with heavy equipment on-site. I will return at a latter date to reinspect.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1946844 603877 01/31/2011 2011-01-31 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
603877 267951 NOV - Notice of Violation Comply/Closed 2011-06-28
603877 273014 NOV - Notice of Violation Comply/Closed 2011-06-28
603877 273015 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-06-28 2011-06-28 $5,000.00 $5,000.00