X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-049-24504

Well Details

Well ID: 37-049-24504
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: Venango Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: L THOMPSON UNIT 4
License Status: ACTIVE
Spud Date:
Permit Date: 1985-05-06
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 42.046290
Longitude: -79.900711

For data sources see[1][2][3]

Well History

Date Event
1985-05-06 New Permit Application
1985-11-08 Performed Spud Operation
1985-11-12 Drilling Completion
1986-01-09 Perforation
1986-01-09 Performed Stimulation
1986-04-28 NEWLY DRILLED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
1986-01-09 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 CABOT OIL & GAS CORP 15,186.00 161 0.00 0 0.00 0
1987 CABOT OIL & GAS CORP 14,197.00 304 0.00 0 0.00 0
1988 CABOT OIL & GAS CORP 9,470.00 326 0.00 0 0.00 0
1989 CABOT OIL & GAS CORP 6,132.00 350 0.00 0 0.00 0
1990 CABOT OIL & GAS CORP 6349.00 295 0.00 0 0.00 0
1991 CABOT OIL & GAS CORP 4138.00 323 0.00 0 0.00 0
1996 DANNIC ENERGY CORP 1769 365 0.00 0 0.00 0
1997 DANNIC ENERGY CORP 2363 365 0.00 0 0.00 0
1998 DANNIC ENERGY CORP 1903 365 0.00 0 0.00 0
1999 DANNIC ENERGY CORP 1758 365 0.00 0 0.00 0
2000 DANNIC ENERGY CORP 1408 365 0.00 0 0.00 0
2001 DANNIC ENERGY CORP 459 115 0.00 0 0.00 0
2003 DANNIC ENERGY CORP 1819 365 0.00 0 0.00 0
2004 DANNIC ENERGY CORP 1,320.00 366 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 1,279.00 332 0.00 0 0.00 0
2006 DANNIC ENERGY CORP 1058.00 334 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 904.04 334 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 1,404.09 365 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 1,091.55 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 1,479.20 355 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 1,083.67 273 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 1,595.44 273 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 747.00 273 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 757.75 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 352.00 182 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 292.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 106.19 121 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1991 CABOT OIL & GAS CORP Brine 26.00 Bbl
1997 DANNIC ENERGY CORP Brine 45.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
1998 DANNIC ENERGY CORP Brine 130.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
1999 DANNIC ENERGY CORP Brine 50.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2004 DANNIC ENERGY CORP Brine 14.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2012 DANNIC ENERGY CORP Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1737091 Primary Facility 2008-09-16 Routine/Complete Inspection No Violations Noted
2012870 Primary Facility 2011-10-20 Routine/Complete Inspection No Violations Noted
377568 Primary Facility 1995-01-31 Routine/Complete Inspection No Violations Noted

For data sources see[8]

References