If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-049-24324 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.04361,"lon":-79.788774,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Erie | |
| Municipality: Venango Township | |
| Operator Name: DANNIC ENERGY CORP | |
| Well Pad ID: | |
| Farm/Lease Name: G PROCTOR UNIT 4 | |
| License Status: ACTIVE | |
| Spud Date: | |
| Permit Date: 1984-12-03 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: Yes | |
| Latitude: 42.043610 | |
| Longitude: -79.788774 |
| Date | Event |
|---|---|
| 1984-12-03 | New Permit Application |
| 1985-01-23 | Performed Spud Operation |
| 1985-01-27 | Drilling Completion |
| 1985-02-06 | Perforation |
| 1985-02-06 | Performed Stimulation |
| 1985-04-30 | NEWLY DRILLED |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 1985-02-06 | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 1986 | CABOT OIL & GAS CORP | 10,707.00 | 176 | 0.00 | 0 | 0.00 | 0 |
| 1987 | CABOT OIL & GAS CORP | 74,094.00 | 340 | 0.00 | 0 | 0.00 | 0 |
| 1988 | CABOT OIL & GAS CORP | 42,742.00 | 361 | 0.00 | 0 | 0.00 | 0 |
| 1989 | CABOT OIL & GAS CORP | 24,987.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1990 | CABOT OIL & GAS CORP | 16436.00 | 336 | 0.00 | 0 | 0.00 | 0 |
| 1991 | CABOT OIL & GAS CORP | 9372.00 | 345 | 0.00 | 0 | 0.00 | 0 |
| 1996 | DANNIC ENERGY CORP | 2004 | 366 | 0.00 | 0 | 0.00 | 0 |
| 1997 | DANNIC ENERGY CORP | 3135 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1998 | DANNIC ENERGY CORP | 2606 | 365 | 0.00 | 0 | 0.00 | 0 |
| 1999 | DANNIC ENERGY CORP | 3554 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2000 | DANNIC ENERGY CORP | 2829 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2001 | DANNIC ENERGY CORP | 175 | 310 | 0.00 | 0 | 0.00 | 0 |
| 2003 | DANNIC ENERGY CORP | 1259 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2004 | DANNIC ENERGY CORP | 2,202.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2005 | DANNIC ENERGY CORP | 2,867.00 | 363 | 0.00 | 0 | 0.00 | 0 |
| 2006 | DANNIC ENERGY CORP | 1739.00 | 274 | 0.00 | 0 | 0.00 | 0 |
| 2007 | DANNIC ENERGY CORP | 1014 | 306 | 0.00 | 0 | 0.00 | 0 |
| 2008 | DANNIC ENERGY CORP | 526.43 | 184 | 0.00 | 0 | 0.00 | 0 |
| 2009 | DANNIC ENERGY CORP | 398.99 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2010 | DANNIC ENERGY CORP | 617.24 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | DANNIC ENERGY CORP | 140.12 | 273 | 0.00 | 0 | 0.00 | 0 |
| 2012 | DANNIC ENERGY CORP | 160.73 | 274 | 0.00 | 0 | 0.00 | 0 |
| 2013 | DANNIC ENERGY CORP | 50.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | DANNIC ENERGY CORP | 41.00 | 273 | 0.00 | 0 | 0.00 | 0 |
| 2015 | DANNIC ENERGY CORP | 53.64 | 61 | 0.00 | 0 | 0.00 | 0 |
| 2016 | DANNIC ENERGY CORP | 29.00 | 30 | 0.00 | 0 | 0.00 | 0 |
| 2017 | DANNIC ENERGY CORP | 22.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | DANNIC ENERGY CORP | 40.00 | 100 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 1991 | CABOT OIL & GAS CORP | Brine | 27.00 Bbl | ||
| 1996 | DANNIC ENERGY CORP | Brine | 105.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 1997 | DANNIC ENERGY CORP | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 1998 | DANNIC ENERGY CORP | Brine | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 1999 | DANNIC ENERGY CORP | Brine | 85.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2001 | DANNIC ENERGY CORP | Brine | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
| 2003 | DANNIC ENERGY CORP | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2004 | DANNIC ENERGY CORP | Brine | 105.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2005 | DANNIC ENERGY CORP | Brine | 48.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
| 2012 | DANNIC ENERGY CORP | Produced Fluid | 44.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2032274 | Primary Facility | 2012-01-05 | Routine/Complete Inspection | No Violations Noted | |
| 362771 | Primary Facility | 1988-04-12 | Routine/Complete Inspection | No Violations Noted | |
| 362772 | Primary Facility | 1989-12-20 | Routine/Complete Inspection | No Violations Noted | |
| 369730 | Primary Facility | 1991-12-23 | Routine/Complete Inspection | No Violations Noted | |
| 380669 | Primary Facility | 1996-06-27 | Routine/Complete Inspection | No Violations Noted | |
| 966633 | Primary Facility | 2000-09-15 | Routine/Complete Inspection | No Violations Noted |
For data sources see[8]