X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-049-00039

Well Details

Well ID: 37-049-00039
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: Summit Township
Operator Name:
Well Pad ID:
Farm/Lease Name: SERIAL
License Status: Plugged and Abandoned
Spud Date: 1990-07-12
Permit Date:
Well Type: STORAGE WELL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 42.046917
Longitude: -80.041572

For data sources see[1][2][3]

Well History

Date Event
1990-07-12 Drilling Completion
1990-07-12 Performed Stimulation
2017-10-24 Begin Plugging
2017-11-01 Finished Plugging
2017-12-15 Reworked

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
1990-07-12 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2011 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2012 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2013 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2014 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2015 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2016 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0
2017 NATL FUEL GAS SUPPLY CORP 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 NATL FUEL GAS SUPPLY CORP Drilling Fluid Waste 191.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1082656 Primary Facility 2001-12-10 Routine/Complete Inspection No Violations Noted
1297894 Primary Facility 2003-12-15 Routine/Complete Inspection No Violations Noted
1839796 Primary Facility 2009-10-22 Routine/Complete Inspection No Violations Noted
1919595 Primary Facility 2010-10-13 Routine/Complete Inspection No Violations Noted
2014062 Primary Facility 2011-10-25 Routine/Complete Inspection No Violations Noted
2107825 Primary Facility 2012-10-09 Routine/Complete Inspection No Violations Noted
2213144 Primary Facility 2013-10-15 Routine/Complete Inspection No Violations Noted
2306340 Primary Facility 2014-09-22 Routine/Complete Inspection No Violations Noted
2421596 Primary Facility 2015-10-28 Routine/Partial Inspection No Violations Noted
2533577 Primary Facility 2016-11-02 Routine/Complete Inspection No Violations Noted
2651090 Primary Facility 2017-10-24 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, crew has finishing rigging up and is currently pumping on the well with 40 bbls of brine to kill well, crew will then vent of gas bubble then finish killing the well with remaining 20 bbls of brine.
2651627 Primary Facility 2017-10-24 Plugging(Includes Plugged/Mined Through) No Violations Noted
2651755 Primary Facility 2017-10-25 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, crew has finished killing the well, crew is now rigging up BOP so they can run in tubing and clean out well to prepare for cementing operations.
2652403 Primary Facility 2017-10-26 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, crew is currently running in with tubing to TD well, after well is TD'd and fill if any is cleaned out the bottom portion of well will then be cemented.
2652549 Primary Facility 2017-10-26 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, cement crew on location and were flushing out lines, pumped 10.7 bbl of cement, rig crew laying down 14 joints of tubing and the rest of pipe being stood up, wireline crew will be on location 10/27/17 to tag cement top and set CIBP and run bond log.
2653172 Primary Facility 2017-10-27 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, wireline on location, wireline set CIBP T 2110' now wireline crew hooking up bond tool to run bond log.
2655736 Primary Facility 2017-11-01 Routine/Partial Inspection No Violations Noted Well is plugged
2663344 Primary Facility 2017-11-21 Administrative/File Review No Violations Noted locational data entry
2803215 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted
361081 Primary Facility 1987-11-04 Routine/Complete Inspection No Violations Noted
361082 Primary Facility 1988-11-15 Routine/Complete Inspection No Violations Noted
361083 Primary Facility 1989-11-14 Routine/Complete Inspection No Violations Noted
367500 Primary Facility 1990-12-19 Routine/Complete Inspection No Violations Noted
369943 Primary Facility 1991-09-24 Routine/Complete Inspection No Violations Noted
372746 Primary Facility 1992-10-28 Routine/Complete Inspection No Violations Noted
375423 Primary Facility 1993-12-22 Routine/Complete Inspection No Violations Noted
377171 Primary Facility 1994-12-14 Routine/Complete Inspection No Violations Noted
379978 Primary Facility 1995-12-12 Routine/Complete Inspection No Violations Noted
383692 Primary Facility 1997-10-29 Routine/Complete Inspection No Violations Noted
386250 Primary Facility 1998-10-21 Routine/Complete Inspection No Violations Noted
893685 Primary Facility 1999-11-01 Routine/Complete Inspection No Violations Noted

For data sources see[8]

References