X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-047-25047

Well Details

Well ID: 37-047-25047
Loading map...
Country: United States
State: Pennsylvania
County: Elk
Municipality: Jones Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 152587
Farm/Lease Name: COP WT 2604 294H 53071
License Status:
Spud Date:
Permit Date: 2018-07-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.559989
Longitude: -78.517608

For data sources see[1][2][3]

Well History

Date Event
2018-07-30 New Permit Application
2018-09-26 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-05 2019-02-23 6,173 10,500,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KFR-47 Keane Friction Reducer alcohols, C11-14-iso-, C13 rich, ethoxlated 78330-21-9 5 0.00400034 3973.55
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.024002 23841.3
Sand (Proppant) (lbs) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.1657 11,091,000.0
KFEAC-30 Keane Iron Control Acetic acid 64-19-7 60 0.000873582 867.733
Citric acid 77-92-9 40 0.000582388 578.489
KAI-12 Keane Acid Inhibitor fatty imidazoline 61790-69-0 5 0.00008595 85.374
methanol 67-56-1 90 0.0015471 1536.74
prop-2-yn-1-0l 107-19-7 5 0.00008595 85.374
propan-2-ol 67-63-0 5 0.00008595 85.374
ethylbenzene 100-41-4 1 0.00001719 17.075
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.00008595 85.374
xylne 1330-20-7 5 0.00008595 85.374
KSI-19 Keane Scale Inhibitor alcohols, C11-14-iso-, C13 rich, ethoxlated 78330-21-9 5 0.000491788 488.495
Ethylene Glycol 107-21-1 40 0.00393431 3907.96
7.5% Acid Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0502117 49875.5
Water 7732-18-5 92.5 0.619278 615131
MBC-516W Keane Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000745928 740.933
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000496973 493.646
gluteral 111-30-8 26.7 0.00249891 2482.17
ethanol 64-17-5 2.8 0.000262058 260.303
Other components below reportable levels Proprietary 56.7 0.00530854 5272.99
Water (Clean - Acid - Chems) Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 88.0624 87,472,800.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SENECA RESOURCES CO LLC 1,123,288.94 246 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.21 Tons LANDFILL 100361
2018 SENECA RESOURCES CO LLC Drill Cuttings 820.11 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Soil Contaminated by Oil 6.25 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 50.45 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 71,556.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 18.33 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Drill Cuttings 490.97 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 20.00 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SENECA RESOURCES CO LLC Soil Contaminated by Oil & Gas Related Spills 6.25 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 170.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2759208 Primary Facility 2018-08-02 Administrative/File Review No Violations Noted
2781943 Primary Facility 2018-10-01 Drilling/Alteration No Violations Noted They are setting the conductor pipe now with an auger rig. They started to get damp at about 54' deep so they pulled up and are setting 50' of 20" pipe in the well. Plants and Goodwin are cementing the wells.
2818986 Primary Facility 2018-12-26 Drilling/Alteration No Violations Noted 16200' is the anticipated TD. The location is matted and all drill cuttings are going into rolloff containers.

They just finished cementing the intermediate casing and they got 29 bbl. of cement returned to surface. They are currently waiting on cement to set.

For data sources see[8]

References