If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-039-25751 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.799389,"lon":-80.349639,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Crawford | |
Municipality: Spring Township | |
Operator Name: ENERVEST OPR LLC | |
Well Pad ID: | |
Farm/Lease Name: CHUPP 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-11-02 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: Yes | |
Latitude: 41.799389 | |
Longitude: -80.349639 |
Date | Event |
---|---|
2011-11-02 | New Permit Application |
2011-11-11 | Performed Spud Operation |
2011-11-27 | Drilling Completion |
2011-12-09 | Perforation |
2012-07-23 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | ENERVEST OPR LLC | 5,803.00 | 10 | 0.00 | 0 | 0.00 | 0 |
2012 | ENERVEST OPR LLC | 65,198.00 | 365 | 388.22 | 365 | 0.00 | 0 |
2013 | ENERVEST OPR LLC | 13,196.00 | 365 | 88.81 | 365 | 0.00 | 0 |
2014 | ENERVEST OPR LLC | 7,531.29 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ENERVEST OPR LLC | 4,647.00 | 365 | 62.00 | 365 | 0.00 | 0 |
2016 | ENERVEST OPR LLC | 3,449.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERVEST OPR LLC | 2,050.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ENERVEST OPR LLC | 2,053.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ENERVEST OPR LLC | 379.00 | 320 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | ENERVEST OPR LLC | Produced Fluid | 18.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24523 |
2012 | ENERVEST OPR LLC | Produced Fluid | 31.00 Bbl | ROAD SPREADING | |
2014 | ENERVEST OPR LLC | Produced Fluid | 3.40 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | ENERVEST OPR LLC | Produced Fluid | 19.99 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2018779 | Primary Facility | 2011-11-14 | Drilling/Alteration | No Violations Noted | |
2020561 | Primary Facility | 2010-11-18 | Routine/Complete Inspection | No Violations Noted | This is a new well pad with the rig currently on-site and drilling. The permit and E&S Plan are posted. The E&S plan is implemented with BMPs in place. The pits both have the mimium of 2' of freeboard. The acces road is in good condition. |
2021850 | Primary Facility | 2011-11-18 | Drilling/Alteration | No Violations Noted | |
2022111 | Primary Facility | 2011-11-21 | Drilling/Alteration | No Violations Noted | |
2027877 | Primary Facility | 2011-12-08 | Follow-up Inspection | No Violations Noted | Upon inspection I found the new wellhead in place, however the production equipment has not yet been installed. The well pad has been rough graded and is currently very muddy, but stabile. The slit fence remains in place. The pits where in the process of being pumped while I was on-site. The pits have over 2' of freeboard. Final reclaim will be in summer of 2012. |
2052630 | Primary Facility | 2012-03-21 | Routine/Complete Inspection | No Violations Noted | |
2070069 | Primary Facility | 2012-05-21 | Routine/Complete Inspection | No Violations Noted | |
2084372 | Primary Facility | 2012-07-12 | Site Restoration | No Violations Noted | |
2252229 | Primary Facility | 2014-03-10 | Routine/Complete Inspection | No Violations Noted | |
2452171 | Primary Facility | 2016-02-18 | Routine/Complete Inspection | No Violations Noted | |
2540935 | Primary Facility | 2016-12-02 | Administrative/File Review | No Violations Noted | production review |
For data sources see[7]