X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-039-23747

Well Details

Well ID: 37-039-23747
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Oil Creek Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: GOODWILL 2
License Status: ACTIVE
Spud Date:
Permit Date: 2001-03-15
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.668874
Longitude: -79.657033

For data sources see[1][2][3]

Well History

Date Event
2001-03-15 New Permit Application
2001-04-23 Performed Spud Operation
2001-04-29 Drilling Completion
2001-05-09 Perforation
2001-06-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 BELDEN & BLAKE CORP 29534 365 0.00 0 0.00 0
2002 BELDEN & BLAKE CORP 26688 365 0 0 0.00 0
2003 BELDEN & BLAKE CORP 15081 365 0.00 0 0.00 0
2004 BELDEN & BLAKE CORP 10221 366 0.00 0 0.00 0
2005 BELDEN & BLAKE CORP 8475 365 0 365 0.00 0
2006 BELDEN & BLAKE CORP 7951.00 365 0.00 0 0.00 0
2007 BELDEN & BLAKE CORP 6,202.00 365 0.00 0 0.00 0
2008 BELDEN & BLAKE CORP 5378.00 366 0.00 0 0.00 0
2009 BELDEN & BLAKE CORP 4,582.00 365 0.00 0 0.00 0
2010 BELDEN & BLAKE CORP 2,951.00 365 0.00 0 0.00 0
2011 BELDEN & BLAKE CORP 3,815.00 365 0.00 0 0.00 0
2012 ENERVEST OPR LLC 5,047.00 365 0.00 0 0.00 0
2013 ENERVEST OPR LLC 4,239.00 365 0.00 0 0.00 0
2014 ENERVEST OPR LLC 3,583.44 365 0.00 0 0.00 0
2015 ENERVEST OPR LLC 3,477.00 365 0.00 0 0.00 0
2016 ENERVEST OPR LLC 2,827.00 366 0.00 0 0.00 0
2017 ENERVEST OPR LLC 3,167.00 365 0.00 0 0.00 0
2018 ENERVEST OPR LLC 2,617.00 365 0.00 0 0.00 0
2019 ENERVEST OPR LLC 2,741.00 360 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2001 BELDEN & BLAKE CORP Brine 62.00 Bbl Brine or Industrial Waste Treatment Plt
2003 BELDEN & BLAKE CORP Brine 238.00 Bbl Road Spreading
2004 BELDEN & BLAKE CORP Brine 47.00 Bbl Road Spreading
2005 BELDEN & BLAKE CORP Brine 118.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2006 BELDEN & BLAKE CORP Brine 77.00 Bbl Other
2006 BELDEN & BLAKE CORP Brine 77.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2007 BELDEN & BLAKE CORP Produced Fluid 93.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2008 BELDEN & BLAKE CORP Brine 80.00 Bbl Other NOT SPEC
2011 BELDEN & BLAKE CORP Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2014 ENERVEST OPR LLC Produced Fluid 75.01 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 ENERVEST OPR LLC Produced Fluid 75.01 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 ENERVEST OPR LLC Produced Fluid 79.17 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 ENERVEST OPR LLC Produced Fluid 87.51 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1023272 Primary Facility 2001-04-19 Routine/Complete Inspection No Violations Noted
1030038 Primary Facility 2001-04-23 Drilling/Alteration No Violations Noted
1030040 Primary Facility 2001-05-02 Drilling/Alteration Viol(s) Noted & Immediately Corrected
1030058 Primary Facility 2001-05-10 Drilling/Alteration No Violations Noted
2540876 Primary Facility 2016-12-02 Administrative/File Review No Violations Noted production review

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1030040 274421 05/02/2001 2001-05-02 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative A tear in the pit liner was found above the water line. The operator was called and sent water trucks at once, to remove fluids to assure the 2 foot of freeboard. The liner was subsiquently repaired and the pit used during the frack flow back phase of th

For data sources see[7]

References