If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21284 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.409753,"lon":-77.621125,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148997 | |
Farm/Lease Name: PA TRACT E 6H | |
License Status: | |
Spud Date: 2012-05-26 | |
Permit Date: 2012-03-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.409753 | |
Longitude: -77.621125 |
Date | Event |
---|---|
2012-03-13 | New Permit Application |
2012-05-26 | Performed Spud Operation |
2012-06-15 | Drilling Completion |
2013-04-11 | Perforation |
2014-01-29 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-29 | 2013-07-02 | 8,200 | 4,177,660 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Nabors | Proppant | Silica Substrate | NA | 100 | 12.0679 | 4,825,100.0 |
Biocide KR-153SL | Nabors | Biocide | Polyethylene Glycol | 25322-68-3 | 50 | 0.016358 | 6540.39 | |
2,2-Dibromo-3-nitrilo-propionamide | 10222-01-2 | 20 | 0.00654319 | 2616.16 | ||||
Other -(non hazardous) | NA | 30 | 0.00981479 | 3924.24 | ||||
Friction Reducer, WFR-3B | Nabors | Friction Reducer | Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00316581 | 1265.78 | |
Hydrotreated light distillates (10-30%) | 64742-47-8 | 50 | 0.0316581 | 12657.8 | ||||
Ethoxylated Alcohol Blend | NA | 15 | 0.00949744 | 3797.35 | ||||
Other -(non hazardous) | NA | 15 | 0.00949744 | 3797.35 | ||||
Propylene glycol | 57-55-6 | 15 | 0.00949744 | 3797.35 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.1936 | 34,862,500.0 | |
Scale Inhibitor, TSC | Nabors | Scale Inhibitor | Anionic copolymer | NA | 15 | 0.00152467 | 609.607 | |
Propylene glycol | 57-55-6 | 40 | 0.00406578 | 1625.62 | ||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15 | 0.00152467 | 609.607 | ||||
Other -(non hazardous) | NA | 15 | 0.00152467 | 609.607 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.583816 | 233426 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0473364 | 18926.5 | ||||
Acid Corrosion Inhibitor, A12 | Nabors | Corrosion Inhibitor | Propargyl Alcohol | 107-19-7 | 30 | 0.000327974 | 131.133 | |
Short Chained glycol ether | 112-34-5 | 30 | 0.000327974 | 131.133 | ||||
Other -(non hazardous) | NA | 3 | 0.00003280 | 13.113 | ||||
Isopropyl Alcohol | 67-63-0 | 30 | 0.000327974 | 131.133 | ||||
Proprietary Component | NA | 7 | 0.00007653 | 30.598 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 238,483.00 | 153 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 378,797.34 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 291,256.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 195,054.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 174,455.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 136,622.80 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 141,594.16 | 307 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 1,247.48 Tons | LANDFILL | 100955 |
2013 | XTO ENERGY INC | Produced Fluid | 497.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 72.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 209.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 207.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 318.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 3,854.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 3,928.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 4,152.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 960.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 792.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 188.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Produced Fluid | 109.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 5,998.48 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 1,223.52 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,128.87 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 677.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 97.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 1,551.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,980.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 849.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 208.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 101.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Produced Fluid | 414.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 196.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 544.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 103.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 974.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.32 Tons | LANDFILL | 100955 |
2017 | XTO ENERGY INC | Produced Fluid | 514.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 54.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 378.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 49.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 144.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 596.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 241.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 101.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 46.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 258.75 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 161.45 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 49.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 211.39 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 50.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2071569 | Primary Facility | 2012-05-29 | Drilling/Alteration | No Violations Noted | |
2344060 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | |
2422271 | Primary Facility | 2015-10-15 | Routine/Complete Inspection | Violation(s) Noted | |
2514337 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2555374 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconvnetional well in production. No violations noted at time of inspection. |
2721045 | Primary Facility | 2018-04-20 | Routine/Complete Inspection | No Violations Noted | The weather is 45 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract Unit E Pad, 6H well on April 20, 2018. There are 6 wells on this pad.
Well # 6H is active and producing. Annular vents surface by intermediate (13-3/8¿ x 9-5/8") and intermediate by production (9-5/8¿ x 5-1/2¿) are open and vented. 100% LEL and 5% combustible gas was detected at the 13-3/8¿ x 9-5/8" annulus. Production xmas tree top (tubing) pressure reading is 21 PSI, casing pressure is 251 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2829674 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2422271 | 738483 | 10/15/2015 | 2015-10-15 | 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec | Environmental Health & Safety |
For data sources see[8]