X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-035-21240

Well Details

Well ID: 37-035-21240
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Grugan Township
Operator Name: ARD OPR LLC
Well Pad ID: 148054
Farm/Lease Name: COP TRACT 285 C 1013H
License Status:
Spud Date: 2011-06-17
Permit Date: 2011-04-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.380225
Longitude: -77.555361

For data sources see[1][2][3]

Well History

Date Event
2011-04-11 New Permit Application
2011-06-17 Performed Spud Operation
2011-09-08 Drilling Completion
2011-11-24 Perforation
2012-10-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-12-14 2011-12-14 8,041 3,035,918

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 14.42
Acid, Hydrochloric (15) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 15.00 0.00
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.00
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00
WMTI Poly SI40 AMPA Scale Inhibitor Phosphonic acid 13598-36-2 3.00 0.00
Poly Phosphonate 40.00 0.00
Water 7732-18-5 70.00 0.00
Hydrochloric acid 7647-01-0 17.00 0.00
WMTI Poly CFR40G 1020 Halliburton Energy Services Friction Reducer Cationic water-soluble polymer emulsion 100.00 0.00
WMTI Poly CS39 Halliburton Energy Services Clay Stabilizer Chloride 16887-00-6 30.00 0.04
Proprietary poly electrolyte 40.00 0.05
Proprietary inorganic chemical 20.00 0.02
Water 7732-18-5 60.00 0.08
BE-9W Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00196000
LCA-1 Solvent Halliburton Energy Services Solvent Paraffinic solvent 100.00 0.00
SP Halliburton Energy Services Gel Breaker Sodium persulfate 7775-27-1 100.00 0.00022000
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 84.52
FDP-S944-09 Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00177000
WMTI Poly SI40 AMPA Halliburton Energy Services Scale Inhibitor
LGC-36 UC Halliburton Energy Services Liquid Gel Concentrate Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.00
Guar gum 9000-30-0 60.00 0.00
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Carbohydrates 95.00 0.00
Hemicellulase enzyme 9012-54-8 15.00 0.00
Acid, Hydrochloric (7.5) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 7.50 0.05
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Methanol 67-56-1 60.00 0.00039000
Propargyl alcohol 107-19-7 10.00 0.00006000
WG-36 GELLING AGENT Halliburton Energy Services Gelling Agent Guar gum 9000-30-0 100.00 0.00184000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 754,301.00 326 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 495,410.00 365 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 279,102.00 265 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 271,939.00 243 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 251,941.00 366 0.00 0 0.00 0
2017 ARD OPR LLC 199,544.05 365 0.00 0 0.00 0
2018 ARD OPR LLC 175,535.13 365 0.00 0 0.00 0
2019 ARD OPR LLC 161,225.43 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 893.42 Tons LANDFILL 06-08438
2011 ANADARKO E&P ONSHORE LLC Fracturing Fluid Waste 296.50 Tons LANDFILL 101397
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 45.86 Tons LANDFILL 100955
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 873.83 Tons LANDFILL 101397
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 1,722.51 Bbl REUSE OTHER THAN ROAD SPREADING
2012 ANADARKO E&P ONSHORE LLC Drilling Fluid Waste 510.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 ANADARKO E&P ONSHORE LLC Fracturing Fluid Waste 4.35 Tons LANDFILL 101397
2012 ANADARKO E&P ONSHORE LLC Fracturing Fluid Waste 44.84 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 1,534.55 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 442.88 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 235.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 198.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 1,123.71 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 62.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 86.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 285.48 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 136.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 442.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 176.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 158.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 59.21 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 171.70 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 190.84 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2029830 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted Frac fluid spilled before going downhole. No evidence of any fluid leaving containment was observed
2039236 Primary Facility 2012-01-03 Routine/Complete Inspection No Violations Noted
2105444 Primary Facility 2012-09-19 Routine/Complete Inspection No Violations Noted
2190415 Primary Facility 2013-08-08 Routine/Complete Inspection No Violations Noted
2549034 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted
2695835 Primary Facility 2018-02-13 Routine/Complete Inspection No Violations Noted The weather is 36 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285C Pad, Well #1013H, on February 13, 2018.

There are 6 producing wells on this pad. Both annulus vents are closed and not vented at time of inspection. Production by intermediate (5-1/2¿ X 9-5/8¿) annulus vent is shut in to pressure monitor, with pressure reading ¿ 0 PSI, production casing annulus vent is also shut in to pressure monitor, with pressure reading -206 PSI. The production xmas tree top pressure on the 2-3/8¿ tubing is 126 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2807815 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted On November 28, 2018, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. COP Tract 285 Pad C. Site stability and site restoration could not be evaluated due to snow cover.

There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There is a sand separator associated with each well. There are 6 GPU’s and 4 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment.

No violations noted.

2855374 Primary Facility 2019-03-18 Routine/Complete Inspection No Violations Noted Weather was 20 degrees and sunny. There were no Alta representatives on location at time of inspection. Well was in production. Well had digital pressure monitoring equipment. Well had one visible 2' annulus vent plumbed to surface with a 0 to 6k PSI analog gauge reading approximately 0PSI. 0% combustable gas was detected in any area around the well at time of inspection. Well had 154 PSI on the production tubing and 200 PSI on the production casing. No violations noted at time of inspection.

For data sources see[8]

References