37-035-21218

Well Details

Well ID: 37-035-21218
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Chapman Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148996
Farm/Lease Name: PA TRACT 8548H
License Status:
Spud Date:
Permit Date: 2010-06-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.367108
Longitude: -77.670503

For data sources see[1][2][3]

Well History

Date Event
2010-06-17 New Permit Application
2011-06-15 Permit Renewal Application
2011-07-11 Performed Spud Operation
2011-08-16 Drilling Completion
2012-07-13 Perforation
2013-01-10 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-07-21 2012-07-21 8,093 3,099,299

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Gel Breaker Weatherford Gel Breaker Whole Product
Ethylene glycol 107-21-1 60.00 0.00002000
Water 7732-18-5 40.00 0.00001000
Guar Gel Weatherford Gel Not Hazardous 100.00 0.00601000
Guar gum, carboxymethyl 2-hydroxypropyl ether, sodium salt 68130-15-4
Acid - 15 HCl Acid PPG Industries Acid Hydrochloric acid 7647-01-0 15.00 0.00
Whole Product
Other -(non hazardous) 85.00 0.00
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Whole Product
Other -(non hazardous) 70.00 0.03
Water Water 7732-18-5 100.00 86.25
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor Other -(non hazardous) 100.00 0.00996000
Whole Product
Sand Proppant Quartz 14808-60-7 100.00 13.12
Acid - 7.5 HCl Acid PPG Industries Acid Whole Product
Other -(non hazardous) 92.50 0.48
Hydrochloric acid 7647-01-0 7.50 0.03
Biocide - MC 8520 Multi-Chem Group Biocide Whole Product
2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00006000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00055000
Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Whole Product
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00019000
Other -(non hazardous) 50.00 0.00019000
Biocide - MC 8650 Multi-Chem Group Biocide Whole Product
Glutaraldehyde 111-30-8 60.00 0.00318000
Other -(non hazardous) 40.00 0.00212000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 177,583.00 154 0.00 0 0.00 0
2013 XTO ENERGY INC 236,805.00 327 0.00 0 0.00 0
2014 XTO ENERGY INC 245,339.00 364 0.00 0 0.00 0
2015 XTO ENERGY INC 186,913.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 131,247.00 366 0.00 0 0.00 0
2017 XTO ENERGY INC 112,184.00 363 0.00 0 0.00 0
2018 XTO ENERGY INC 60,166.86 210 0.00 0 0.00 0
2019 XTO ENERGY INC 50,635.46 109 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Produced Fluid 1,642.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 XTO ENERGY INC Produced Fluid 1,757.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XTO ENERGY INC Fracing Fluid Waste 645.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Fracing Fluid Waste 3,960.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XTO ENERGY INC Fracing Fluid Waste 852.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 XTO ENERGY INC Fracing Fluid Waste 440.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2013 XTO ENERGY INC Produced Fluid 295.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XTO ENERGY INC Produced Fluid 337.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 XTO ENERGY INC Produced Fluid 514.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 XTO ENERGY INC Produced Fluid 348.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2013 XTO ENERGY INC Produced Fluid 426.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 XTO ENERGY INC Produced Fluid 204.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 XTO ENERGY INC Produced Fluid 65.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 XTO ENERGY INC Produced Fluid 829.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XTO ENERGY INC Produced Fluid 123.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2014 XTO ENERGY INC Produced Fluid 305.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 XTO ENERGY INC Produced Fluid 97.95 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 113.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 774.98 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 839.05 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 265.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 317.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 224.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 XTO ENERGY INC Produced Fluid 103.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 XTO ENERGY INC Produced Fluid 98.55 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 XTO ENERGY INC Produced Fluid 246.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Produced Fluid 113.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 XTO ENERGY INC Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 362.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Produced Fluid 317.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 XTO ENERGY INC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Other Oil & Gas Wastes 15.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 XTO ENERGY INC Produced Fluid 49.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 56.50 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 32.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 41.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Produced Fluid 56.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 117.75 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1979122 Primary Facility 2011-06-08 Routine/Partial Inspection No Violations Noted
1983155 Primary Facility 2011-06-24 Drilling/Alteration No Violations Noted
1984163 Primary Facility 2011-06-20 Routine/Partial Inspection No Violations Noted
1993084 Primary Facility 2011-08-02 Routine/Partial Inspection No Violations Noted
2004356 Primary Facility 2011-09-21 Drilling/Alteration No Violations Noted
2071601 Primary Facility 2012-05-29 Routine/Complete Inspection No Violations Noted
2071831 Primary Facility 2012-05-02 Routine/Complete Inspection No Violations Noted
2077377 Primary Facility 2012-06-20 Routine/Complete Inspection No Violations Noted
2344129 Primary Facility 2015-02-12 Routine/Complete Inspection No Violations Noted
2516514 Primary Facility 2016-08-25 Site Restoration No Violations Noted
2554798 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well in production. No violations noted at time of inspection.
2654522 Primary Facility 2017-10-31 Routine/Complete Inspection No Violations Noted Weather is 38 deg. F and cloudy. All 3 annulus vent had 0% combustible gas detected at the time of inspection.
2732206 Primary Facility 2018-05-21 Routine/Complete Inspection No Violations Noted The weather is 72 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract A Pad, 8548H well on May 21, 2018. There are 2 wells on this pad.

Well # 8548H is active and producing. Annular vents surface by intermediate (13-3/8 x 9-5/8") and intermediate by production (9-5/8 x 5-1/2) are open and vented. 10% LEL and 0% combustible gas was detected at the 13-3/8 x 9-5/8" annulus. Production xmas tree top (tubing) pressure gauge is not installed, casing pressure is 200 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2743825 Primary Facility 2018-06-20 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc PA TRACT A on June 20, 2018 with production supervisor Paul Hahn of XTO. XTO recently submitted SPUD notices to the Department for the following wells: 035-21316, 035-21317, 035-21318, 035-21319, and 035-21320.

According to Mr. Hahn, XTO is currently drilling and setting a 24" conductor, 42' in the ground for each above listed well. Once completed, a crew will be moving in to install containment and a top-hole rig will be moving onsite for drilling. The top-hole rig will first start drilling and setting casing for well 035-21320 until reaching the kickoff point (KP). Once completed, the rig will move to the next well and proceed until all 5 wells are KP. Then another rig will move onsite to perform the horizontal drilling for each well.

There are currently (2) producing wells located onsite (035-21217 and 035-21218). There are (2) gas production units (GPU) and (2) 400 bbl. produced fluids tanks located in the sa

2750685 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted The weather is 82 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 8548H on July 9, 2018.

The well is temporary shut in due to drilling operation on site. There are total of 7 wells on location - 2 are pre-existing and 5 newly drilled. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Steven Guile, Rig Manager.

2752167 Primary Facility 2018-07-12 Routine/Complete Inspection No Violations Noted The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 8548H on July 12, 2018.

The well is temporary shut in due to drilling operation on site. No obvious changes since previous inspection observed due to PA Tract A 5 H drilling in progress. There are total of 7 wells on location - 2 are pre-existing and 5 newly drilled. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Paul Huhn, Field Superintendent.

2773745 Primary Facility 2018-08-31 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc Pa Tract A well Pad on August 30, 2018.

The site sign, well permit, ESCGP maps, PPC plan, and site specific emergency response plan were onsite for review. The PPC plan was last revised in March 2017. The Department recommends updating the PPC plan if needed with the recently new wells drilled, but not yet completed onsite. The ESCGP (ESX11-035-0010) for the construction of this well pad and access road was terminated by the Department in September 2016.

Two Marcellus wells are currently producing on this well pad (035-21217 & 035-21218). The following five wells recently had the tophole drilled (035-21316, 035-21317, 035-21318, 035-21319, 035-21320). Each well is covered with a metal plate. The tophole rig has moved off location. A new rig will be moving onsite in the next few weeks to drill the horizontals.

Two GPUs and (1) 400 bbl produced fluids tank is located in the same secondary containment. Approximat

2807788 Primary Facility 2018-11-27 Drilling/Alteration No Violations Noted On November 27, 2018, Department representative Brad Kline conducted a routine site inspection at XTO Energy Inc. PA Tract 8546H. XTO safety and environmental person Paul gave me a tour around the well pad. The operator at the time of inspection was tripping out of the hole, as they have reached total depth. Rig and chemicals being stored on site were in a bermed secondary containment. Rig #583 was on the 9H well. Drill cuttings are being collected and combined with sawdust. 2 previous wells drilled are currently shut in(035-21217 and 035-21218).

E&S controls and condition of the pad could not be evaluated due to the snow cover on the ground.

No violations noted.

2828807 Primary Facility 2019-01-15 Routine/Complete Inspection No Violations Noted The weather is 32 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 6H on January 15, 2019.

Performed an inspection of the drilling site. TD is 20460 ft., cleaning the hole, preparing for the production casing (5-1/2¿) cement job, projected on January 18, 2019. All chemical additives are placed on spill containment, cement silos are set up for upcoming cement job. Wellsite look neat and well organized. No violations noted at the time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative - Jerald A. Nietert, Rig Manager.

2833869 Primary Facility 2019-01-30 Routine/Complete Inspection No Violations Noted I arrived on-site and met safety rep Paul Morvant and company man Jerry Niedert. Patterson rig 583 was active on the site, drilling at 15458' on the 85H well. Paul accompanied me on my inspection. Due to 4-6" of snow, assessing the sitewide containment was difficult. Foam berms appeared to be in good condition, although they were slightly flattened in traffic areas. Chemical containment appeared clean and well managed, as did the cutttings backyard.
2839033 Primary Facility 2019-02-07 Drilling/Alteration No Violations Noted On February 7, 2019, Department representative Brad Kline conducted a follow up inspection at XTO Energy Inc. PA Tract 8546H. The follow up inspections is due to the condition noted in Inspection No. 2836543. A tour around the well site was given by Safety Manager Paul Morvant.

The spill containment around the drilling rig was about half rebuilt at time of inspection. There was a vacuum truck on-site sucking water from containment and around the well pad. The puddles that had a film or sheen on them in the earlier noted Inspection Report were vacuumed up or planned to be. The dry chemicals have been placed in a separate spill containment. The containment has holes in it but is being addressed. The chemical totes have been staged in another area of spill containment in a more organized manner. Field conductivity measurements were taken in various areas of the well pad. The highest reading near the drill mud return area yielded a 560 uS/cm reading.

Concerns were discussed with Jerry Nietert, the company

2849599 Primary Facility 2019-03-06 Routine/Complete Inspection No Violations Noted On March 6, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy LLC PA Tract 8546H Well. No E&S issues were observed during the time of inspection. Vegetation could not be evaluated due to snow cover. At the time of the inspection, christmas trees were being set up on the wells. There were 3 frac tanks on the well pad. Containment was being set up for the tanks. There did not appear to be any drilling mud spilled on the pad from the top down rig that was on the pad previously.

No violations noted.

For data sources see[8]