If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21218 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.367108,"lon":-77.670503,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148996 | |
Farm/Lease Name: PA TRACT 8548H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.367108 | |
Longitude: -77.670503 |
Date | Event |
---|---|
2010-06-17 | New Permit Application |
2011-06-15 | Permit Renewal Application |
2011-07-11 | Performed Spud Operation |
2011-08-16 | Drilling Completion |
2012-07-13 | Perforation |
2013-01-10 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-21 | 2012-07-21 | 8,093 | 3,099,299 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Gel Breaker | Weatherford | Gel Breaker | Whole Product | ||||
Ethylene glycol | 107-21-1 | 60.00 | 0.00002000 | |||||
Water | 7732-18-5 | 40.00 | 0.00001000 | |||||
Guar Gel | Weatherford | Gel | Not Hazardous | 100.00 | 0.00601000 | |||
Guar gum, carboxymethyl 2-hydroxypropyl ether, sodium salt | 68130-15-4 | |||||||
Acid - 15 HCl Acid | PPG Industries | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.00 | ||
Whole Product | ||||||||
Other -(non hazardous) | 85.00 | 0.00 | ||||||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Whole Product | ||||||||
Other -(non hazardous) | 70.00 | 0.03 | ||||||
Water | Water | 7732-18-5 | 100.00 | 86.25 | ||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Other -(non hazardous) | 100.00 | 0.00996000 | |||
Whole Product | ||||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 13.12 | |||
Acid - 7.5 HCl Acid | PPG Industries | Acid | Whole Product | |||||
Other -(non hazardous) | 92.50 | 0.48 | ||||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.03 | |||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | Whole Product | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | |||||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00055000 | |||||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Whole Product | |||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00019000 | |||||
Other -(non hazardous) | 50.00 | 0.00019000 | ||||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Whole Product | |||||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00318000 | |||||
Other -(non hazardous) | 40.00 | 0.00212000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 177,583.00 | 154 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 236,805.00 | 327 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 245,339.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 186,913.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 131,247.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 112,184.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 60,166.86 | 210 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 50,635.46 | 109 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Produced Fluid | 1,642.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Produced Fluid | 1,757.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 645.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 3,960.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 852.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 440.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Produced Fluid | 295.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 337.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Produced Fluid | 514.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 348.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Produced Fluid | 426.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 204.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 65.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | XTO ENERGY INC | Produced Fluid | 829.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 123.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 305.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 97.95 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 113.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 774.98 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 839.05 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 265.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 317.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 224.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 103.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 98.55 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 246.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 113.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | XTO ENERGY INC | Produced Fluid | 119.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 362.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 317.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 15.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 49.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 56.50 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 32.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 41.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Produced Fluid | 56.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 117.75 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1979122 | Primary Facility | 2011-06-08 | Routine/Partial Inspection | No Violations Noted | |
1983155 | Primary Facility | 2011-06-24 | Drilling/Alteration | No Violations Noted | |
1984163 | Primary Facility | 2011-06-20 | Routine/Partial Inspection | No Violations Noted | |
1993084 | Primary Facility | 2011-08-02 | Routine/Partial Inspection | No Violations Noted | |
2004356 | Primary Facility | 2011-09-21 | Drilling/Alteration | No Violations Noted | |
2071601 | Primary Facility | 2012-05-29 | Routine/Complete Inspection | No Violations Noted | |
2071831 | Primary Facility | 2012-05-02 | Routine/Complete Inspection | No Violations Noted | |
2077377 | Primary Facility | 2012-06-20 | Routine/Complete Inspection | No Violations Noted | |
2344129 | Primary Facility | 2015-02-12 | Routine/Complete Inspection | No Violations Noted | |
2516514 | Primary Facility | 2016-08-25 | Site Restoration | No Violations Noted | |
2554798 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well in production. No violations noted at time of inspection. |
2654522 | Primary Facility | 2017-10-31 | Routine/Complete Inspection | No Violations Noted | Weather is 38 deg. F and cloudy. All 3 annulus vent had 0% combustible gas detected at the time of inspection. |
2732206 | Primary Facility | 2018-05-21 | Routine/Complete Inspection | No Violations Noted | The weather is 72 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy INC., PA Tract A Pad, 8548H well on May 21, 2018. There are 2 wells on this pad.
Well # 8548H is active and producing. Annular vents surface by intermediate (13-3/8 x 9-5/8") and intermediate by production (9-5/8 x 5-1/2) are open and vented. 10% LEL and 0% combustible gas was detected at the 13-3/8 x 9-5/8" annulus. Production xmas tree top (tubing) pressure gauge is not installed, casing pressure is 200 PSI. No violations are noted at time of inspection. 0% combustible gas was detected in the area immediately surrounding the well. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2743825 | Primary Facility | 2018-06-20 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc PA TRACT A on June 20, 2018 with production supervisor Paul Hahn of XTO. XTO recently submitted SPUD notices to the Department for the following wells: 035-21316, 035-21317, 035-21318, 035-21319, and 035-21320.
According to Mr. Hahn, XTO is currently drilling and setting a 24" conductor, 42' in the ground for each above listed well. Once completed, a crew will be moving in to install containment and a top-hole rig will be moving onsite for drilling. The top-hole rig will first start drilling and setting casing for well 035-21320 until reaching the kickoff point (KP). Once completed, the rig will move to the next well and proceed until all 5 wells are KP. Then another rig will move onsite to perform the horizontal drilling for each well. There are currently (2) producing wells located onsite (035-21217 and 035-21218). There are (2) gas production units (GPU) and (2) 400 bbl. produced fluids tanks located in the sa |
2750685 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | The weather is 82 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 8548H on July 9, 2018.
The well is temporary shut in due to drilling operation on site. There are total of 7 wells on location - 2 are pre-existing and 5 newly drilled. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Steven Guile, Rig Manager. |
2752167 | Primary Facility | 2018-07-12 | Routine/Complete Inspection | No Violations Noted | The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 8548H on July 12, 2018.
The well is temporary shut in due to drilling operation on site. No obvious changes since previous inspection observed due to PA Tract A 5 H drilling in progress. There are total of 7 wells on location - 2 are pre-existing and 5 newly drilled. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative ¿ Paul Huhn, Field Superintendent. |
2773745 | Primary Facility | 2018-08-31 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at XTO Energy Inc Pa Tract A well Pad on August 30, 2018.
The site sign, well permit, ESCGP maps, PPC plan, and site specific emergency response plan were onsite for review. The PPC plan was last revised in March 2017. The Department recommends updating the PPC plan if needed with the recently new wells drilled, but not yet completed onsite. The ESCGP (ESX11-035-0010) for the construction of this well pad and access road was terminated by the Department in September 2016. Two Marcellus wells are currently producing on this well pad (035-21217 & 035-21218). The following five wells recently had the tophole drilled (035-21316, 035-21317, 035-21318, 035-21319, 035-21320). Each well is covered with a metal plate. The tophole rig has moved off location. A new rig will be moving onsite in the next few weeks to drill the horizontals. Two GPUs and (1) 400 bbl produced fluids tank is located in the same secondary containment. Approximat |
2807788 | Primary Facility | 2018-11-27 | Drilling/Alteration | No Violations Noted | On November 27, 2018, Department representative Brad Kline conducted a routine site inspection at XTO Energy Inc. PA Tract 8546H. XTO safety and environmental person Paul gave me a tour around the well pad. The operator at the time of inspection was tripping out of the hole, as they have reached total depth. Rig and chemicals being stored on site were in a bermed secondary containment. Rig #583 was on the 9H well. Drill cuttings are being collected and combined with sawdust. 2 previous wells drilled are currently shut in(035-21217 and 035-21218).
E&S controls and condition of the pad could not be evaluated due to the snow cover on the ground. No violations noted. |
2828807 | Primary Facility | 2019-01-15 | Routine/Complete Inspection | No Violations Noted | The weather is 32 Deg. F and sunny at the time of inspection. Routine inspection of XTO Energy Inc., PA Tract A Pad, well # 6H on January 15, 2019.
Performed an inspection of the drilling site. TD is 20460 ft., cleaning the hole, preparing for the production casing (5-1/2¿) cement job, projected on January 18, 2019. All chemical additives are placed on spill containment, cement silos are set up for upcoming cement job. Wellsite look neat and well organized. No violations noted at the time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative - Jerald A. Nietert, Rig Manager. |
2833869 | Primary Facility | 2019-01-30 | Routine/Complete Inspection | No Violations Noted | I arrived on-site and met safety rep Paul Morvant and company man Jerry Niedert. Patterson rig 583 was active on the site, drilling at 15458' on the 85H well. Paul accompanied me on my inspection. Due to 4-6" of snow, assessing the sitewide containment was difficult. Foam berms appeared to be in good condition, although they were slightly flattened in traffic areas. Chemical containment appeared clean and well managed, as did the cutttings backyard. |
2839033 | Primary Facility | 2019-02-07 | Drilling/Alteration | No Violations Noted | On February 7, 2019, Department representative Brad Kline conducted a follow up inspection at XTO Energy Inc. PA Tract 8546H. The follow up inspections is due to the condition noted in Inspection No. 2836543. A tour around the well site was given by Safety Manager Paul Morvant.
The spill containment around the drilling rig was about half rebuilt at time of inspection. There was a vacuum truck on-site sucking water from containment and around the well pad. The puddles that had a film or sheen on them in the earlier noted Inspection Report were vacuumed up or planned to be. The dry chemicals have been placed in a separate spill containment. The containment has holes in it but is being addressed. The chemical totes have been staged in another area of spill containment in a more organized manner. Field conductivity measurements were taken in various areas of the well pad. The highest reading near the drill mud return area yielded a 560 uS/cm reading. Concerns were discussed with Jerry Nietert, the company |
2849599 | Primary Facility | 2019-03-06 | Routine/Complete Inspection | No Violations Noted | On March 6, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy LLC PA Tract 8546H Well. No E&S issues were observed during the time of inspection. Vegetation could not be evaluated due to snow cover. At the time of the inspection, christmas trees were being set up on the wells. There were 3 frac tanks on the well pad. Containment was being set up for the tanks. There did not appear to be any drilling mud spilled on the pad from the top down rig that was on the pad previously.
No violations noted. |
For data sources see[8]