X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-035-21156

Well Details

Well ID: 37-035-21156
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Grugan Township
Operator Name: ARD OPR LLC
Well Pad ID: 148052
Farm/Lease Name: COP TRACT 285 1001H
License Status:
Spud Date:
Permit Date: 2009-04-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.369366
Longitude: -77.559437

For data sources see[1][2][3]

Well History

Date Event
2009-04-08 New Permit Application
2009-07-29 Performed Spud Operation
2009-09-07 Drilling Completion
2009-11-05 Perforation
2009-11-23 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 ANADARKO E&P ONSHORE LLC 206940.00 44 0.00 0 0.00 0
2010 ANADARKO E&P ONSHORE LLC 202,176.00 43 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 173,445.00 223 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 91,960.00 306 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 86,477.00 322 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 73,980.00 285 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 48,955.00 179 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 59,031.00 366 0.00 0 0.00 0
2017 ARD OPR LLC 51,894.70 354 0.00 0 0.00 0
2018 ARD OPR LLC 41,374.11 341 0.00 0 0.00 0
2019 ARD OPR LLC 20,716.19 362 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 ANADARKO E&P ONSHORE LLC Fracking Fluid 3,762.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 ANADARKO E&P ONSHORE LLC Produced Fluid 299.50 Bbl STORAGE PENDING DISPOSAL OR REUSE
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 17.64 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 132.26 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 251.69 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 71.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 97.70 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 103.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 109.04 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 13.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 62.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 7.72 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 17.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 34.70 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 95.84 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1802233 Primary Facility 2009-06-03 Drilling/Alteration No Violations Noted
1809295 Primary Facility 2009-06-30 Routine/Complete Inspection No Violations Noted pad construction complete.
1821336 Primary Facility 2009-08-19 Compliance Evaluation De minimus Violations Noted 2-3 gallons of lubrcating oil released to ground. Excuvation already occured and disposed. Corrected/abated. Violation Closed. MAB 8/19/09
1849900 Primary Facility 2009-12-15 Drilling/Alteration No Violations Noted Well is drilled and fraced.
1869148 Primary Facility 2010-03-11 Routine/Complete Inspection No Violations Noted Well is completed.
1920282 Primary Facility 2010-10-07 Compliance Evaluation No Violations Noted
1926590 Primary Facility 2010-11-09 Routine/Partial Inspection No Violations Noted
1931046 Primary Facility 2010-11-29 Routine/Partial Inspection No Violations Noted
1934547 Primary Facility 2010-12-10 Routine/Partial Inspection No Violations Noted
1939837 Primary Facility 2010-12-23 Routine/Partial Inspection No Violations Noted
1939841 Primary Facility 2010-12-30 Routine/Partial Inspection No Violations Noted
1944100 Primary Facility 2011-01-20 Routine/Partial Inspection No Violations Noted
1947975 Primary Facility 2011-02-04 Routine/Partial Inspection No Violations Noted
1951030 Primary Facility 2011-02-15 Routine/Partial Inspection No Violations Noted
1953940 Primary Facility 2011-02-28 Routine/Partial Inspection No Violations Noted
1955808 Primary Facility 2011-03-08 Routine/Complete Inspection No Violations Noted
1957123 Primary Facility 2011-03-14 Routine/Complete Inspection No Violations Noted
1962229 Primary Facility 2011-03-31 Routine/Partial Inspection No Violations Noted
1966217 Primary Facility 2011-04-13 Routine/Partial Inspection No Violations Noted
1970584 Primary Facility 2011-04-29 Routine/Partial Inspection No Violations Noted
1972042 Primary Facility 2011-05-09 Routine/Complete Inspection No Violations Noted
2027921 Primary Facility 2011-12-06 Routine/Complete Inspection No Violations Noted
2553221 Primary Facility 2017-01-09 Routine/Complete Inspection No Violations Noted
2695868 Primary Facility 2018-02-13 Routine/Complete Inspection No Violations Noted The weather is 36 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285B Pad, Well #1001H, on February 13, 2018.

There are 6 producing wells on this pad. Both annulus vents are closed and not vented at time of inspection. Production by intermediate (5-1/2¿ X 9-5/8¿) annulus vent is shut in to pressure monitor, with pressure reading ¿ 0 PSI, production casing annulus vent is also shut in to pressure monitor, with pressure reading -112 PSI. The production xmas tree top pressure on the 2-3/8¿ tubing is 142 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2760250 Primary Facility 2018-07-25 Routine/Complete Inspection No Violations Noted On July 25, 2018, Department representative Sue Herzing conducted a routine site inspection at COP TRACT 285 PAD B. The site sign, emergency response plan, monthly tank maintenance log, ESCGP, weekly E&S inspection log, and drilling permits were onsite for review. No E&S issues were observed during the time of my inspection. A PCSM infiltration berm consisting of a 24" seeded compost sock has been installed according to PCSM plans. This compost infiltration berm is well vegetated and appears to be functioning as design. The pad remains the original footprint size of 400' x 400'. According to the operators PCSM plans, this the smallest "in production" workable footprint size. The following remain in place along the access road and appear to be functioning as design: rock lined roadside ditches and ditch relief culverts with rip-rap aprons. Overall, the site is stable and well vegetated exceeding 70% uniform, perennial, vegetative cover.

There are a total of 6 producing wells located on this well pad. All wel

2845168 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Inspection was in response to a deficient tank notification from ARD received on 2/25/19. A hole was discovered above the water level, and the tank was taken out of service and pumped down. I immediately noted several rust streaks on the #1 tank, and also noted that the #3 tank had similar rust streaks; I recommend that the #3 tank be monitored carefully for integrity. 3-4" of ice was present in the production tank containment; although the capacity of the containment did not appear to be significantly reduced, I recommend that when conditions warrant that this containment be vacced out. The GPU containment was full to the top of the berm with ice; I recommend that this be vacced as soon as reasonably possible.
2855431 Primary Facility 2019-03-18 Routine/Complete Inspection No Violations Noted Weather was 20 degrees and sunny. There were no Alta representatives on location at time of inspection. Well was in production. Well had digital pressure monitoring equipment. Well had 124 PSI on the production tubing and 12 PSI on the production casing. Well had 2 visible annulus vents plumbed to surface. 1' annulus vent had a 0 to 600 PSI analog pressure gauge reading approximately 0 PSI. 2' annulus vent had no gauge to read pressure. 0% combustible gas was detected anywhere around the well. No violations at time of inspection.

For data sources see[7]

References