37-035-21108

Well Details

Well ID: 37-035-21108
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Beech Creek Township
Operator Name: ARD OPR LLC
Well Pad ID: 147207
Farm/Lease Name: COP TRACT 653 1000
License Status: ACTIVE
Spud Date:
Permit Date: 2008-05-06
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.198066
Longitude: -77.688181

For data sources see[1][2][3]

Well History

Date Event
2008-05-06 New Permit Application
2008-06-06 Performed Spud Operation
2008-07-21 Drilling Completion
2008-08-01 Perforation
2008-10-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 ANADARKO E&P ONSHORE LLC 1918.00 51 0.00 0 0.00 0
2009 ANADARKO E&P ONSHORE LLC 21124.00 182 0.00 0 0.00 0
2010 ANADARKO E&P ONSHORE LLC 17,413.50 215 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 15,394.00 343 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 10,139.00 160 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 9,552.00 204 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 7,693.00 242 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 1,993.00 42 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 7,631.00 193 0.00 0 0.00 0
2017 ARD OPR LLC 6,121.85 40 0.00 0 0.00 0
2018 ARD OPR LLC 3,916.53 19 0.00 0 0.00 0
2019 ARD OPR LLC 4,299.74 55 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 ANADARKO E&P ONSHORE LLC Brine 2,002.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 ANADARKO E&P ONSHORE LLC Produced Fluid 120.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 167.71 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 203.89 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 68.24 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 26.54 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 74.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 4.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1709674 Primary Facility 2008-05-28 Routine/Complete Inspection Violation(s) Noted
1709790 Primary Facility 2008-05-29 Compliance Evaluation Outstanding Violations - No Viols Req'd
1713354 Primary Facility 2008-06-04 Compliance Evaluation No Violations Noted
1715222 Primary Facility 2008-06-17 Drilling/Alteration No Violations Noted
1715379 Primary Facility 2008-06-11 Drilling/Alteration No Violations Noted
1718541 Primary Facility 2008-06-27 Drilling/Alteration No Violations Noted
1719998 Primary Facility 2008-07-09 Drilling/Alteration No Violations Noted
1721858 Primary Facility 2008-07-14 Drilling/Alteration No Violations Noted
1724776 Primary Facility 2008-07-30 Routine/Complete Inspection No Violations Noted
1735443 Primary Facility 2008-09-16 Routine/Complete Inspection No Violations Noted
1736078 Primary Facility 2008-09-04 Routine/Complete Inspection No Violations Noted
1854328 Primary Facility 2010-01-06 Routine/Complete Inspection No Violations Noted
1854416 Primary Facility 2010-01-06 Routine/Complete Inspection No Violations Noted
1878602 Primary Facility 2010-03-31 Routine/Complete Inspection No Violations Noted
1914148 Primary Facility 2010-09-17 Routine/Complete Inspection No Violations Noted Production well. Annulus shut in. Frac tanks on location.
1963689 Primary Facility 2011-04-06 Routine/Partial Inspection No Violations Noted
2040475 Primary Facility 2012-01-04 Routine/Complete Inspection No Violations Noted
2709053 Primary Facility 2018-03-23 Routine/Complete Inspection No Violations Noted Routine site inspection at Alta's COP TRACT 653 Pad 1000 on March 23, 2018. The site sign, well permit, and emergency response plan were onsite. There is one vertical Marcellus well drilled on this pad (035-21108). The well head is properly tagged. Frozen water was observed in the well cellar. Two produced fluids tanks are stationed in an earthen dike. No water was present within the dike. Woody vegetation was present within the earthen dike. The Department recommends removing the woody vegetation in efforts to prevent any future impacts this vegetation may cause to this secondary containment. Several corrosion spots were observed on the produced fluids tanks. The Department recommends the operator continue to monitor the tanks and replace them if necessary. One GPU is stationed onsite in an earthen dike. No water and no vegetation were observed in this dike.

The pad has been reduced in size. Restored areas are well vegetated. The construction of this pad was not covered under an ESCGP. The pad was constr

2754331 Primary Facility 2018-07-20 Incident- Response to Accident or Event Violation(s) Noted Department representative Sue Herzing conducted an incident related inspection on July 20, 2018 at Alta's COP Tract 653 Pad 1000. Onsite during the inspection were the following: Rick Hall of Alta, Dan Long of DCNR, Ryan Bidelspach of GES, and Tobias staff for excavation purposes.

Mr. Hall reported a brine spill to the Department on July 19, 2019 at approximately 1445. According to Mr. Hall, an environmental consultant was onsite collecting 26R samples when they found a spill near the produced fluids tank. Alta was immediately contacted and then the Department was immediately notified of the spill.

The spill occurred from a faulty closed valve on the spill pot which is connected to the load out pipe from the produced fluids tank. According to Mr. Hall both valves on the load out pipe and spill pot were closed but brine water was slowly dripping out of the spill pot valve. The spill pot itself was full of brine water and eventually overflowed causing the release of brine fluids. Two (200) bbl produced flu

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1709674 540007 05/28/2008 2008-05-28 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Disturbed areas need seeded and mulched.
2754331 822810 2018-07-20 2018-11-30 CSL 402(b) Environmental Health & Safety The release of brine fluids outside of secondary containment is considered a violation.
2754331 822811 2018-07-20 2018-11-30 78a57(a) Environmental Health & Safety The release of brine fluids outside of secondary containment is considered a violation.
2754331 822812 2018-07-20 2018-11-30 SWMA 301 Environmental Health & Safety The release of brine fluids outside of secondary containment is considered a violation.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
540007 235190 NOV - Notice of Violation Comply/Closed 2008-06-04
822810 365699 NOV - Notice of Violation 2018-11-30
822811 365699 NOV - Notice of Violation 2018-11-30
822812 365699 NOV - Notice of Violation 2018-11-30

For data sources see[7]

References