X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-033-27018

Well Details

Well ID: 37-033-27018
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Karthaus Township
Operator Name: BKV OPR LLC
Well Pad ID: 145302
Farm/Lease Name: RHP-A
License Status: Inactive
Spud Date:
Permit Date: 2011-04-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.141006
Longitude: -78.097322

For data sources see[1][2][3]

Well History

Date Event
2011-04-19 New Permit Application
2011-10-18 Performed Spud Operation
2011-12-30 Drilling Completion
2012-11-06 DEVIATED
2019-04-22 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2019 BKV OPR LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CARRIZO (MARCELLUS) LLC Drill Cuttings 1,556.38 Tons LANDFILL 101397
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 1,988.00 Tons LANDFILL 101397

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2023550 Primary Facility 2011-11-28 Routine/Complete Inspection No Violations Noted
2044962 Primary Facility 2012-02-24 Routine/Complete Inspection No Violations Noted
2053307 Primary Facility 2012-03-22 Routine/Complete Inspection No Violations Noted
2116208 Primary Facility 2012-11-16 Routine/Complete Inspection No Violations Noted
2240996 Primary Facility 2014-01-30 Routine/Complete Inspection No Violations Noted
2528441 Primary Facility 2016-10-17 Site Restoration No Violations Noted
2597819 Primary Facility 2017-05-25 Routine/Complete Inspection No Violations Noted Routine inspection of the River Hill Power Marcellus well pad. Site is occupied by a single completed well, (RHP #1H 37-033-27018) which has been completed and flowed back, but has never been placed in an active production status. The Ceritas Midstream Partners-Karthaus West gathering pipeline originally planned to serve the site was cleared and grubbed, but was never built, and the pipeline ROW has been fully restored and pipeline ESCGP terminated, and the well remains shut in, in a regulatory inactive status.
    The original ESCGP for this site was modified to upgrade the existing sediment traps into infiltration basins, and the post-construction pad footprint was approved at the original full buildout size.  The location is built entirely on reclaimed bituminous mine spoils, and while ponded water may be present on the pad itself after a rain event, runoff off the aggregate pad quickly infiltrates into the surrounding vegetated spoil material. 
     Site ID signage is posted at the access road entran
2724297 Primary Facility 2018-04-27 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at BKV Operating, LLC River Hill Power Pad on April 27, 2018 with environmental consultant Kevin Brady. There is one Marcellus well (033-27018) drilled on this pad. The well has been drilled and stimulated. This well is currently in regulatory inactive status and this status will expire on 4/22/19. The well head is tagged. Water was observed in the well cellar.

The well pad remains the original footprint size. All PCSMs are in place. The ESCGP (ESX11-033-0006) for the construction of the well pad and access road was terminated by Department staff on 10/25/16. In addition, a well site restoration report for this well was approved on 10/17/16 by Department staff.

No production equipment is onsite. The pad and access road appear stable. No E&S issues were observed.

No violations noted.

2751194 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted The weather is 70 Deg. F and sunny at time of inspection. Follow up inspection of BKV Operating, LLC., RHP-A Pad, well 5H on July 3, 2018.

There is 1 inactive and shut in well on this pad. Annulus vent (9-5/8" x 5-1/2") is open and vented at time of inspection. 0% combustible gas was detected at the annulus. Production casing pressure is 0 PSI, production tubing pressure is 0 PSI, backside casing pressure is 4950 PSI, annulus intermediate by production pressure is 0 PSI. All production equipment has been removed from the wellsite. No violations are noted at time of inspection. BKV Operating, LLC Representatives - Kevin J. Brady and Jesse Bonnice, Sr. Production Foreman. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2845276 Primary Facility 2019-02-26 Follow-up Inspection No Violations Noted The weather is 32 Deg. F and sunny at time of inspection. Follow up inspection of BKV Operating, LLC., RHP-A Pad, well 5H on Feb. 26, 2019.

There is 1 inactive and shut in well on this pad. Inactive Well Status expires on April 22, 2019. Annulus vent (9-5/8" x 5-1/2") is open and vented at time of inspection. 0% combustible gas was detected at the annulus. Production casing pressure is 0 PSI, production tubing pressure is 0 PSI, backside casing pressure is 4900 PSI, annulus intermediate by production pressure is 0 PSI. All production equipment has been removed from the wellsite. No violations are noted at time of inspection. BKV Operating, LLC Representatives - Kevin J. Brady, Hydrologist, Environmental Scientist, Wetland Delineator (WPIT) Whitetail Environmental Services, LLC; Matt Merculdo, Contractor Manager. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

For data sources see[7]

References