37-033-26507

Well Details

Well ID: 37-033-26507
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Huston Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: CHAGRIN 68
License Status:
Spud Date:
Permit Date: 2007-07-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.205726
Longitude: -78.566668

For data sources see[1][2][3]

Well History

Date Event
2007-07-25 New Permit Application
2008-01-03 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 2,114.00 334 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 1,023.00 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 388.00 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 320.00 334 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 83.00 154 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 19.00 59 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 417.00 365 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 367.61 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 279.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 19.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 41.58 30 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2008 DANNIC ENERGY CORP Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2015 DANNIC ENERGY CORP Produced Fluid 3,360.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2019 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1682971 Primary Facility 2008-01-04 Drilling/Alteration No Violations Noted CONTRACTOR ON SITE FINISHING CONSTRUCTION. DRILL RIG WAS WAITING TO MOVE ON SITE. E/S PLAN HAD BEEN POSTED.
2826989 Primary Facility 2019-01-15 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at Dannic Energy Corp conventional well (033-26507) on January 15, 2019. The area surrounding the production equipment has been restored. Restored site appears well vegetated and stable. No signs of E&S issues. There is one poly brine tank stationed onsite that is ~3/4 of the way full of brine fluids. A small spill/release approximately the size of a basketball was observed at the the connector/release valve of the brine tank (photo 3). A field screening for specific conductance was taken in the saturated soil; reading exceeded 4.0 mS/cm (photo 4). The Department recommends that the operator address the remediation of the spill/release in accordance with the small spill policy 800-5000-001. Once remedial work is completed please contact the Department. As you can see from photo 3, the brine tank has been repaired/patched in the past. The Department recommends replacing the brine tank.

The chart recorder is dated 12/31/18 and the outsi

For data sources see[7]