37-033-26494

Well Details

Well ID: 37-033-26494
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Bloom Township
Operator Name: DEVONIAN RESOURCES INC
Well Pad ID:
Farm/Lease Name: WALLS 3
License Status: ACTIVE
Spud Date:
Permit Date: 2007-07-11
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.000089
Longitude: -78.653689

For data sources see[1][2][3]

Well History

Date Event
2007-07-11 New Permit Application
2007-08-31 Performed Spud Operation
2007-09-11 Drilling Completion
2007-09-19 Perforation
2008-01-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 DEVONIAN RESOURCES INC 2412.00 365 0.00 0 0.00 0
2009 DEVONIAN RESOURCES INC 3221.00 365 0.00 0 0.00 0
2010 DEVONIAN RESOURCES INC 1,823.00 365 0.00 0 0.00 0
2011 DEVONIAN RESOURCES INC 782.00 365 0.00 0 0.00 0
2012 DEVONIAN RESOURCES INC 1,191.00 365 0.00 0 0.00 0
2013 DEVONIAN RESOURCES INC 1,354.00 365 0.00 0 0.00 0
2014 DEVONIAN RESOURCES INC 491.00 330 0.00 0 0.00 0
2015 DEVONIAN RESOURCES INC 530.00 210 0.00 0 0.00 0
2016 DEVONIAN RESOURCES INC 241.00 365 0.00 0 0.00 0
2017 DEVONIAN RESOURCES INC 67.00 365 0.00 0 0.00 0
2018 DEVONIAN RESOURCES INC 25.00 365 0.00 0 0.00 0
2019 DEVONIAN RESOURCES INC 278.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 DEVONIAN RESOURCES INC Brine 744.00 Bbl Municipal Sewage Treatment Plant
2009 DEVONIAN RESOURCES INC Brine 255.00 Bbl Municipal Sewage Treatment Plant PA0028207
2010 DEVONIAN RESOURCES INC Produced Fluid 270.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2011 DEVONIAN RESOURCES INC Produced Fluid 142.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2012 DEVONIAN RESOURCES INC Produced Fluid 120.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2013 DEVONIAN RESOURCES INC Produced Fluid 155.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2014 DEVONIAN RESOURCES INC Produced Fluid 200.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2015 DEVONIAN RESOURCES INC Produced Fluid 130.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2016 DEVONIAN RESOURCES INC Produced Fluid 71.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 DEVONIAN RESOURCES INC Produced Fluid 71 Bbl CENT WASTE TRT FAC NPDES PA0101508
2018 DEVONIAN RESOURCES INC Produced Fluid 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 DEVONIAN RESOURCES INC Produced Fluid 80.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1659066 Primary Facility 2007-09-11 Drilling/Alteration No Violations Noted MOVING RIG OFF SITE. DRILL PIT HAD ADEQUATE FREEBOARD; NO E&S PROBLEMS ON SITE.
1682957 Primary Facility 2007-12-11 Drilling/Alteration No Violations Noted IN LINE, PRODUCING
1837545 Primary Facility 2009-10-14 Site Restoration No Violations Noted -Well complete and in production. Site recontoured and pit encclosed.
2749379 Primary Facility 2018-07-06 Incident- Response to Accident or Event Violation(s) Noted Department representative Sue Herzing conducted an incident related inspection on July 6, 2018 at Devonian Resources conventional well 033-26494 (Walls 3 Well). A small spill of 15 gallons of brine water was reported to the Department on July 2, 2018 by Joe Thompson of Devonian Resources.

During the inspection I observed a small hole located near the top portion of the poly brine and orange staining down the side of the tank. Wet soil was present during my inspection. I used a soil probe to test for conductivity throughout the wet areas and dry areas. I estimated that the impacted area near the brine tank is 12 ft. wide and bottle necks down to 1.5 ft. wide as it travels down gradient for approximately 60 ft. The wet saturated areas maxed out the soil probe at 4.0 mS/cm. Some standing water was observed and maxed out the water screening conductivity meter at 20.0 mS/cm.

In addition, stressed vegetation consisting of evergreen trees and grasses was observed within the brine release pathway.

No remediation

2768535 Primary Facility 2018-08-28 Follow-up Inspection Outstanding Violations - Viols Req'd Department representatives Sue Herzing and Sasha Minium conducted a follow up inspection on August 28, 2018 at Devonian Resources conventional well 033-26494 (Walls 3) with Joe Thompson of Devonian Resources. A small spill of 15 gallons of brine water was reported to the Department on July 2, 2018.

To date, the operator has only removed some of the impacted soils. Excavated impact soils remain onsite, wrapped in plastic. The bullet hole within the brine tank has been repaired. Impacted soils still remain present exceeding soil conductivity readings of 1,000 uS/cm. During the site inspection, discussions were had on remediating the site. The operator will be addressing remediation by further excavating impacted soils delineated by the Department during the site inspection. Once excavation is completed, please notify the Department. Impacted soils shall be properly disposed.

The previous cited violations on July 6, 2018 remain outstanding. No new violations were cited during this inspection. The outstanding

2784683 Primary Facility 2018-10-04 Follow-up Inspection Outstanding Violations - Viols Req'd Department representatives Sue Herzing conducted a follow up inspection on October 4, 2018 at Devonian Resources conventional well 033-26494 (Walls 3). A small spill of 15 gallons of brine fluids was reported to the Department on July 2, 2018 by the owner/operator Joe Thompson.

To date, the operator has only removed some of the impacted soils. Excavated impacted soils remain onsite and wrapped in plastic. The bullet hole within the brine tank has been repaired. Impacted soils still remain present exceeding soil conductivity readings of 1,000 uS/cm.

After leaving the site I called Mr. Thompson and discussed when remedial activities will take place. Mr. Thompson stated that his equipment was tied up with another project currently and anticipates getting to this site within 3 weeks to start remedial work.

The operator will be addressing remediation by further excavating impacted soils in accordance with the small spill policy 800-50000-001. Once excavation is completed, please notify the Department. Impact

2822756 Primary Facility 2019-01-04 Follow-up Inspection No Violations Noted Department representatives Sue Herzing conducted a follow up inspection on January 4, 2019 at Devonian Resources Inc. conventional well 033-26494 (Walls 3). A small spill of 15 gallons of brine fluids was reported to the Department on July 2, 2018 by the owner/operator Joe Thompson.

Excavated impacted soils remain onsite and wrapped in plastic. The bullet hole within the brine tank has been repaired.

The Department recommends removing the impacted soils wrapped in plastic from the site and properly disposing of them. The Department is requesting a copy of the disposal receipts.

The previous cited violations on July 6, 2018 remain outstanding. No new violations were cited during this inspection. The outstanding violations will be closed upon receiving confirmation from the operator that the remedial activities have been completed and upon receiving disposal receipts.

2856846 Primary Facility 2019-03-21 Follow-up Inspection Outstanding Violations - Viols Req'd Department representatives Sue Herzing conducted a follow up inspection on March 21, 2019 at Devonian Resources Inc. conventional well 033-26494 (Walls 3). While onsite I meant will landowner Eric Perks. Mr. Perks stated that this well feeds to their nearby hunting camp located several hundred yards uphill from this location.

A small spill of 15 gallons of brine fluids was reported to the Department on July 2, 2018 by the owner/operator Joe Thompson. Excavated impacted soils remain onsite and wrapped in plastic. Serval holes and/or tears were observed in the plastic. A field soil probe reading was taken where a tear in the plastic occurred; reading > 4.00 mS/cm.

Since this small spilled occurred over 8+ months ago the Department has been recommending removing the impacted soils wrapped in plastic from the site and properly disposing of them. The Department has given the operator ample of time to properly remove the impacted soils. Please remove the impacted soils and upon doing so, provide the Department w

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2749379 821707 2018-07-02 CSL 402(b) Environmental Health & Safety Brine water was released to the ground.
2749379 821708 2018-07-02 78.57(a) Environmental Health & Safety The operator failed to control and dispose of brine water.
2749379 821709 2018-07-02 SWMA 301 Environmental Health & Safety Operator failed to control and dispose of brine water.
2768535 826613 2018-07-02 CSL 402(b) Environmental Health & Safety Brine water was released to the ground.
2768535 826614 2018-07-02 78.57(a) Environmental Health & Safety The operator failed to control and dispose of brine water.
2768535 826615 2018-07-02 SWMA 301 Environmental Health & Safety Operator failed to control and dispose of brine water.
2784683 829839 2018-07-02 CSL 402(b) Environmental Health & Safety Brine water was released to the ground.
2784683 829840 2018-07-02 78.57(a) Environmental Health & Safety The operator failed to control and dispose of brine water.
2784683 829841 2018-07-02 SWMA 301 Environmental Health & Safety Operator failed to control and dispose of brine water.
2856846 844760 2018-07-02 CSL 402(b) Environmental Health & Safety Brine water was released to the ground.
2856846 844761 2018-07-02 78.57(a) Environmental Health & Safety The operator failed to control and dispose of brine water.
2856846 844762 2018-07-02 SWMA 301 Environmental Health & Safety Operator failed to control and dispose of brine water.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
821707 365364 NOV - Notice of Violation
821708 365364 NOV - Notice of Violation
821709 365364 NOV - Notice of Violation

For data sources see[7]

References