If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-031-25535 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.051056,"lon":-79.440483,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clarion | |
Municipality: Porter Township | |
Operator Name: NORTHEAST NATURAL ENERGY LLC | |
Well Pad ID: 149370 | |
Farm/Lease Name: STEWART 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.051056 | |
Longitude: -79.440483 |
Date | Event |
---|---|
2011-07-21 | New Permit Application |
2011-08-06 | Performed Spud Operation |
2011-11-09 | Drilling Completion |
2012-01-31 | New Permit Application |
2012-07-09 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | NORTHEAST NATURAL ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | NORTHEAST NATURAL ENERGY LLC | 518,260.00 | 326 | 0.00 | 0 | 14.65 | 150 |
2013 | NORTHEAST NATURAL ENERGY LLC | 389,556.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | NORTHEAST NATURAL ENERGY LLC | 303,400.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | NORTHEAST NATURAL ENERGY LLC | 257,733.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | NORTHEAST NATURAL ENERGY LLC | 175,422.00 | 243 | 0.00 | 0 | 0.00 | 0 |
2017 | NORTHEAST NATURAL ENERGY LLC | 205,032.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2018 | NORTHEAST NATURAL ENERGY LLC | 165,679.92 | 339 | 0.00 | 0 | 0.00 | 0 |
2019 | NORTHEAST NATURAL ENERGY LLC | 150,400.00 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | NORTHEAST NATURAL ENERGY LLC | Drilling Fluid Waste | 1,080.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 0250050885 |
2011 | NORTHEAST NATURAL ENERGY LLC | Drill Cuttings | 350.00 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 0250050885 |
2011 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 483.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 17,697.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | NORTHEAST NATURAL ENERGY LLC | Fracing Fluid Waste | 10,782.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | NORTHEAST NATURAL ENERGY LLC | Fracturing Fluid Waste | 3.30 Tons | STORAGE PENDING DISPOSAL OR REUSE | |
2012 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 5,345.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,700.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,091.00 Bbl | INJECTION DISPOSAL WELL | 34-099-2-1956 |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 733.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 33.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,799.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 587.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 587.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 701.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 51.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2014 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 4,510.85 Bbl | INJECTION DISPOSAL WELL | 34-099-2-1956 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 788.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 252.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 382.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 301.02 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 5,069.00 Bbl | INJECTION DISPOSAL WELL | 34-099-2-1956 |
2015 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 788.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 293.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 794.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 461.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 402.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 68.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 293.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2017 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,731.95 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,383.78 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,635.39 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 1,175.31 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 777.06 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | NORTHEAST NATURAL ENERGY LLC | Produced Fluid | 2,361.37 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004476 | Primary Facility | 2011-09-06 | Routine/Complete Inspection | No Violations Noted | |
2005235 | Primary Facility | 2011-09-26 | Routine/Complete Inspection | No Violations Noted | |
2012801 | Primary Facility | 2011-10-11 | Drilling/Alteration | No Violations Noted | |
2012804 | Primary Facility | 2011-10-14 | Drilling/Alteration | No Violations Noted | |
2026598 | Primary Facility | 2011-12-13 | Drilling/Alteration | No Violations Noted | |
2026904 | Primary Facility | 2011-12-06 | Routine/Complete Inspection | No Violations Noted | |
2036109 | Primary Facility | 2012-01-19 | Routine/Complete Inspection | No Violations Noted | |
2037469 | Primary Facility | 2012-01-24 | Drilling/Alteration | No Violations Noted | |
2041116 | Primary Facility | 2012-02-02 | Routine/Complete Inspection | No Violations Noted | |
2068559 | Primary Facility | 2012-05-14 | Routine/Complete Inspection | No Violations Noted | |
2116950 | Primary Facility | 2012-11-15 | Routine/Complete Inspection | No Violations Noted | |
2154491 | Primary Facility | 2013-03-27 | Routine/Complete Inspection | No Violations Noted | |
2643782 | Primary Facility | 2017-09-29 | Routine/Complete Inspection | No Violations Noted | This site located south off Stewart Road in an agricultural field. This well and well 031-25538 were drilled on ths site, have been completed and are producing. Production reports submitted monthly 2014-2017. Production reporting for 2017 shows production in February and April.
No violations observed. |
2686207 | Primary Facility | 2018-01-25 | Routine/Partial Inspection | No Violations Noted | Well is equipped with a plunger lift system. Moderate corrosion on the tubing head. |
2763152 | Primary Facility | 2018-08-14 | Routine/Partial Inspection | No Violations Noted | This site located west off Grover Road in an agricultural field, the wells are set-up for production with tanks and separators that are set west of the remaining well pad. Production reporting has been submitted from 2012 through June 2018.
No violations observed. |
2770918 | Primary Facility | 2018-08-30 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well appeared to be producing. There was 531 psi on the casing gauge and 223 psi on the tubing. Well integrity appeared to be in good condition, with no signs of any leaks or spills. The well was properly labeled and the Emergency Response sign was posted at the entrance to the site. Well was hooked up to an IPS Pacemaker Plunger. Cellar was covered with a steel grate. The pad had 2 line heater / separator units and contained within a lined, steel dike were a large and small steel tank as well as a small, plastic tank. Production is being reported to the Department. |
2788623 | Primary Facility | 2018-10-15 | Administrative/File Review | No Violations Noted | |
2792600 | Primary Facility | 2018-10-22 | Routine/Partial Inspection | No Violations Noted | This site located west off Grover Road in an agricultural field, the wells are set-up for production with tanks and separators set along the access road west of the remaining well pad. Production reporting has been submitted from 2012 through August 2018.
Some earth work in process near the production equipment, this area needs stabilized with seed and mulch upon completion. No violations observed. |
For data sources see[7]