If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21637 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.12105,"lon":-77.966594,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Burnside Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148090 | |
Farm/Lease Name: COP TRACT 706 UNIT PAD 8 48H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.121050 | |
Longitude: -77.966594 |
Date | Event |
---|---|
2010-08-12 | New Permit Application |
2010-11-01 | Performed Spud Operation |
2011-01-19 | Drilling Completion |
2011-05-18 | Perforation |
2012-07-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-18 | 2011-05-18 | 8,215 | 6,212,324 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Base Fluid | Water | 100.00 | 85.98 | |||
DAP-103 | Calfrac Well Services | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00222000 | ||
DWP-944 | Calfrac Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 70.00 | 0.02 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
DWP-901 | Calfrac Well Services | Oxidizer Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00003000 | ||
DAP-923 | Calfrac Well Services | Corrosion Inhibitor | Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00004000 | ||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00027000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00053000 | |||||
Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00027000 | |||||
Fatty acids, tall-oil | 61790-12-3 | 30.00 | 0.00027000 | |||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00009000 | |||||
DWP-612 | Calfrac Well Services | Friction Reducer | No Hazardous Materials | 100.00 | 0.12 | |||
DWP-111 | Calfrac Well Services | Viscosity Additive | No Hazardous Materials | 100.00 | 0.00080000 | |||
DWP-204 Clay Control | Calfrac Well Services | pH Adjusting Additive | Formic acid | 64-18-6 | 13.00 | 0.00001000 | ||
DAP-901 | Calfrac Well Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00212000 | ||
Amine salt | 5.00 | 0.00106000 | ||||||
Oxyalkylated polyamine | 5.00 | 0.00106000 | ||||||
Phosphoric acid ammonium salt | 5.00 | 0.00106000 | ||||||
Methanol | 67-56-1 | 30.00 | 0.00636000 | |||||
Organic phosphonate | 30.00 | 0.00636000 | ||||||
3 HCl Acid | Calfrac Well Services | Perforation Breakdown | Hydrochloric acid | 7647-01-0 | 100.00 | 0.50 | ||
Sand (Proppant) | Calfrac Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 13.31 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 22,144.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 173,907.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 122,637.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 105,051.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 93,062.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 91,438.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 86,905.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 82,737.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 78,299.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 2,388.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 45,588.61 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 129.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 1,276.32 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 485.97 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 869.52 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 909.91 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 2,646.04 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,472.61 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 106.83 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 110.22 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 2,652.31 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 60.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 2,349.23 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 2,412.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 2,781.60 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 3,076.20 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 526.10 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 2,538.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 3,071.10 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1942099 | Primary Facility | 2010-11-12 | Routine/Complete Inspection | No Violations Noted | |
1942760 | Primary Facility | 2010-01-04 | Drilling/Alteration | No Violations Noted | Pilot hole drilled, Halliburton on site to plug back to KOP |
1942761 | Primary Facility | 2010-01-04 | Drilling/Alteration | No Violations Noted | Patterson 257 drilling 8 3/4" hole @ 8884' |
1957030 | Primary Facility | 2011-01-11 | Routine/Complete Inspection | No Violations Noted | |
1962328 | Primary Facility | 2011-02-17 | Routine/Complete Inspection | No Violations Noted | |
1963241 | Primary Facility | 2011-02-22 | Routine/Complete Inspection | No Violations Noted | |
1966837 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted | |
1986359 | Primary Facility | 2011-05-23 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2318689 | Primary Facility | 2014-10-28 | Routine/Complete Inspection | No Violations Noted | |
2554540 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | |
2686118 | Primary Facility | 2018-01-24 | Routine/Complete Inspection | No Violations Noted | The weather is 30 Deg. F and cloudy and windy at time of inspection. Routine inspection of EXCO Resources PA LLC., C.O.P. TRACT 706 Pad 8, Well # 48H on January 24, 2018.
There is 1 producing wells on this pad. Annulus is closed and not vented at time of inspection. Digital gauge on the production tubing reads pressure - 63 PSI, gauge on the annulus reads 268 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted. DEP Representative ¿ Ulyana Trynovich, Oil and Gas Inspector. |
2705477 | Primary Facility | 2018-02-21 | Routine/Complete Inspection | No Violations Noted | The weather is 70 Deg. F, cloudy and windy at time of inspection. Routine inspection of EXCO Resources PA LLC., Litke Pad, Well # 1HA on February 21, 2018. There is 1 producing wells on this pad.
This well is active and producing gas. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. EXCO Resources, LLC. Representative ¿ Sam Unch, Production Operator. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2705797 | Primary Facility | 2018-03-08 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at EXCO Resources COP TRACT 706 Pad 8 on March 8, 2018. No one was onsite during the time of my inspection.
The site sign, E&S plans, PPC plan, emergency response plan, and E&S log were onsite for review. The pad was originally designed to have more then one Marcellus wells drilled on it. Only one well has been drilled and is active (027-21637). The well head is properly tagged and well cellar is full of gravel. There is one GPU and one produced fluids tank located onsite. The produced fluids tank is station in secondary containment. Water within containment was frozen. No signs of leaks were observed with this containment. The produced fluids tank was properly labeled. The original well pad has been reduced in size. The pad and surrounding areas were snow covered. No PSCMs have been installed. |
2841666 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | The weather is 32 Deg. F and sunny at the time of inspection. Routine inspection of EXCO Resources PA LLC., COP Tract 706 Pad 8, well # 48H on February 19, 2019.
This well is active and producing. Annulus vent is not visible, covered by snow. Production tubing pressure is 53 PSI, casing pressure is 268 PSI. 0% combustible gas was detected in the area immediately surrounding the well. Production processing equipment includes ¿ 1 production water tank, 1 gas processing unit; measurement equipment - orifice meter station. No violations are noted at time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2851825 | Primary Facility | 2019-03-12 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at EXCO Resources COP TRACT 706 Pad 8 on March 12, 2019. No one was onsite during the time of my inspection.
The well pad was originally designed to have 5 Marcellus wells drilled on it. Only one well has been drilled and is active (027-21637). The well head is properly tagged and well cellar is full of gravel and snow. There is one GPU and one produced fluids tank located onsite. The produced fluids tank is station in secondary containment. Water within containment was frozen. No signs of leaks were observed with this containment. The produced fluids tank was properly labeled. The original well pad has been reduced in size. The pad and surrounding areas were snow covered. Two rock lined ditches remain in place along the W and SE toe of slope. These ditches lead to sediment trap 1 located in SW corner. Dormant cattails were observed within the sediment trap. No violations noted. |
For data sources see[8]