X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22804

Well Details

Well ID: 37-019-22804
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Connoquenessing Township
Operator Name: XTO ENERGY INC
Well Pad ID: 151447
Farm/Lease Name: KYNE UNIT 4H
License Status:
Spud Date: 2019-01-28
Permit Date: 2019-01-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.885150
Longitude: -80.0083

For data sources see[1][2][3]

Well History

Date Event
Deviated
2019-01-14 New Permit Application
2019-01-28 Performed Spud Operation
2019-03-21 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 338,370.83 135 0.00 0 183.91 135

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 4.48 Tons LANDFILL 100585
2019 XTO ENERGY INC Other Oil & Gas Wastes 72.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Waste Water Treatment Sludge 46.68 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 3,459.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 5,030.19 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Drilling Fluid Waste 233.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Drill Cuttings 1,110.01 Tons LANDFILL 100585
2019 XTO ENERGY INC Produced Fluid 3,906.16 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 5,216.81 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Drilling Fluid Waste 420.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Unused Fracturing Fluid Waste 16.43 Tons LANDFILL 100434
2019 XTO ENERGY INC Synthetic Liner Materials 40.68 Tons LANDFILL 100585
2019 XTO ENERGY INC Soil Contaminated by Oil 4.48 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2832549 Primary Facility 2019-01-28 Drilling/Alteration No Violations Noted Received spud notification for January 24th 2019. Well is expected to be drilled upon completion of setting conductor pipe for well 019-22805. Anticipating drilling down 40' with a 30" hole to set 24" conductor pipe. After conductor is set a 20" mouse hole will be drilled to 75' and a 12 3/4" casing will be set. Drill cuttings are being put into a roll off container. 10' diameter by 8' deep cellars have already been constructed and set. 4 enclosed roll off containers are onsite. Received spud notice in conjunction with GUIHER 019-22805 and KYNE 019-22806. Spud notifications are located at the same pad location of completed wells 019-22264, 019-22265, and 019-22266.

Note CDS (contractor) onsite to install sound walls.

2835525 Primary Facility 2019-02-04 Routine/Partial Inspection No Violations Noted On 2/4/2019, WQS Brian MacQuarrie onsite. While onsite meet with Tom Baun-XTO Energy. Currently, the Kyne 4H (019-22804), Guiher 6H (019-22805) and Kyne 5H (019-22806) are being drilled. Previously, the 1H (019-22264), 2H(019-22265) and 3H(019-22266) were drilled and in production. Production equipment onsite consists of four 400 bbl production tanks installed within stainless steel containment structure and three gas processing units. Soundwall installed around perimeter of well pad. Previously disturbed areas stabilized with vegetative growth.
2839753 Primary Facility 2019-02-13 Routine/Partial Inspection No Violations Noted On 2/13/2019, WQS Brian MacQuarrie onsite. While onsite meet with Chris Ewing (Drill manager XTO Energy). Appalachian Drill rig #1 onsite drilling the Guiher 6H (019-22805). The Kyne 4H (019-22804) was already drilled. The Kyne 5H (019-22806) will be drilled next.
Well site secondary containment setup. Previously disturbed areas stabilized with vegetative growth.

For data sources see[7]

References