X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22793

Well Details

Well ID: 37-019-22793
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 153674
Farm/Lease Name: BACHELDER UNIT 2H
License Status:
Spud Date:
Permit Date: 2018-12-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.796169
Longitude: -79.881944

For data sources see[1][2][3]

Well History

Date Event
2018-12-17 New Permit Application
2019-01-17 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 XTO ENERGY INC Drill Cuttings 966.85 Tons LANDFILL 100585
2019 XTO ENERGY INC Other Oil & Gas Wastes 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Drill Cuttings 45.23 Tons LANDFILL 100172
2019 XTO ENERGY INC Drilling Fluid Waste 670.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Synthetic Liner Materials 6.86 Tons LANDFILL 100172
2019 XTO ENERGY INC Synthetic Liner Materials 27.37 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2831947 Primary Facility 2019-01-25 Routine/Partial Inspection No Violations Noted On 1/25/2019, WQS Brian MacQuarrie onsite. One well in production; 1H-019-22542. Drill rig onsite beginning to drill additional wells; 2H-019-22793 and 3H-019-22794. Tank battery consists of two 400 bbl tanks installed within secondary containment structure. Secondary containment setup around drill rig. Snow on ground during inspection.
2833936 Primary Facility 2019-01-30 Administrative/File Review No Violations Noted Received cement report for the 9-5/8 on 1/30/19.
2840048 Primary Facility 2019-02-14 Routine/Partial Inspection No Violations Noted On 2/14/2019, WQS Brian MacQuarrie onsite. One well in production; 1H-019-22542. Appalachian drill rig #1 no longer onsite. The 2H-019-22793 and 3H-019-22794 have cages surrounding wellheads, Tophole section drilled. Tank battery consists of two 400 bbl tanks installed within secondary containment structure ( one for production water and one for condensate). Secondary containment fabric still in place around wells. Roll-off box onsite containing plastic and wooden pallets. Vegetation established in previously disturbed areas. Erosion and Sedimentation BMPs maintained.

For data sources see[7]

References