X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22687

Well Details

Well ID: 37-019-22687
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Summit Township
Operator Name: XTO ENERGY INC
Well Pad ID: 154623
Farm/Lease Name: PRAGER A UNIT 1H
License Status:
Spud Date: 2018-01-11
Permit Date: 2017-10-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.825392
Longitude: -79.829844

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-10-06 New Permit Application
2018-01-10 Performed Spud Operation
2018-05-01 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-20 2018-10-13 6,208 23,005,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-16 C&J Energy Services Friction Reducer Listed Below Listed Below 0 0 0
Triethyl Phosphate 78-40-0 2.5 0.00004200 0
Dimethylformamide 68-12-2 20 0.000332 0
Crystalline Silica, quartz 14808-60-7 99.9 3.65904 0
Acrylamide as residual 79-06-1 9.9 0.002515 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000376 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001128 0
Iron Oxide 1309-37-1 0.1 0.003663 0
Water 7732-18-5 30 0.000498 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 35 0.011167 0
Sodium Acetate Anhydrous 127-09-3 3 0.000957 0
Aluminum Oxide 1344-28-1 1.1 0.015082 0
Crystalline Silica, quartz 14808-60-7 99.9 2.38658 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006097 0
Acrylamide as residual 79-06-1 0.1 0.00003400 0
CJENERGY-Emulsifier-47 Proprietary 1 0.000348 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000249 0
Ammonium Chloride 12125-02-9 2 0.000376 0
2-Propenamide as residual 79-06-1 0.1 0.00003200 0
Water 7732-18-5 100 0.025406 0
Ammonium Sulfate 7783-20-2 20 0.005081 0
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat
e
108818-88-8 2 0.000638 0
1-OCTANOL 111-87-5 2.5 0.00004200 0
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.001738 0
Crystalline Silica, quartz 14808-60-7 99.9 1.36975 0
Cinnamaldehyde 104-55-2 15 0.000249 0
Urea 57-13-6 5 0.00127 0
Alcohols, C12-15-branched and linear,
ethoxylated propoxylated
120313-48-6 2 0.000638 0
Water 7732-18-5 92.5 0.853909 0
Water 7732-18-5 60 0.020861 0
Ethylene Glycol 107-21-1 40 0.000664 0
Water 7732-18-5 30 0.009571 0
Tar Bases, Quinoline Derivs. 68513-87-1 1 0.00001700 0
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega
hydroxy-, branched
127087-87-0 5 0.00008300 0
Titanium Oxide 13463-67-7 0.1 0.002389 0
1-DECANOL 112-30-1 5 0.00008300 0
Isopropanol 67-63-0 2.5 0.00004200 0
Ethoxylated Sorbitan Monooleate 9005-65-6 1 0.000319 0
Iron Oxide 1309-37-1 0.1 0.001371 0
Aluminum Oxide 1344-28-1 1.1 0.026279 0
Polyethylene glycol 25322-68-3 50 0.010162 0
Titanium Oxide 13463-67-7 0.1 0.003663 0
Ethylene Glycol 107-21-1 5 0.001595 0
Anionic Polyacrylamide 38193-60-1 30 0.01043 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 30 0.01043 0
Sorbitan Monooleate 1338-43-8 2 0.000638 0
Iron Oxide 1309-37-1 0.1 0.002389 0
Hydrochloric Acid 7647-01-0 7.5 0.069236 0
CJENERGY-Anionic Polymer-44 Proprietary 5 0.00127 0
Water 7732-18-5 28.5 0.005792 0
Sodium Sulfate 7757-82-6 1 0.000254 0
CJENERGY-Buffering Agent-45 Proprietary 17 0.005911 0
Titanium Oxide 13463-67-7 0.1 0.001371 0
CJENERGY-Polymer-43 Proprietary 30 0.007622 0
Methanol 67-56-1 1 0.000188 0
Aluminum Oxide 1344-28-1 1.1 0.04029 0
Water 7732-18-5 96 0.018055 0
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 30 0.009571 0
2-Butoxyethanol 111-76-2 15 0.000249 0
CJENERGY-Surfactant-46 Proprietary 3 0.001043 0
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 91.5212 0
FR-27 PA Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
SI-6 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
FR-28 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
CI-3 C&J Energy Services Acid Corrosion Inhibitors Listed Below Listed Below 0 0 0
BIO-CLEAR 2000 C&J Energy Services Biocides Listed Below Listed Below 0 0 0
HC-7.5 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 976,722.00 331 0.00 0 82.63 300

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Synthetic Liner Materials 17.36 Tons LANDFILL 100585
2018 XTO ENERGY INC Drilling Fluid Waste 780.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 6,885.00 Bbl REUSE (AT WELL PAD)
2018 XTO ENERGY INC Drill Cuttings 1,748.52 Tons LANDFILL 100585
2018 XTO ENERGY INC Synthetic Liner Materials 28.46 Tons LANDFILL 100434
2018 XTO ENERGY INC Other Oil & Gas Wastes 440.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Waste Water Treatment Sludge 51.45 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 16,677.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 6,415.20 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 4,649.34 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 90.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Produced Fluid 5,787.71 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-20114

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2679228 Primary Facility 2018-01-08 Administrative/File Review No Violations Noted
2681932 Primary Facility 2018-01-12 Drilling/Alteration No Violations Noted Cellars where drilled and installed but where not cemented in place. Due to heavy rains cellars needed pumped out and repositioned before cementing in place. Conductor pipe is on site and 42' will be installed when cellars are ready.
2684434 Primary Facility 2018-01-11 Routine/Partial Inspection No Violations Noted At the time of inspection, well has not been spud. Lightning Energy Services was onsite drilling out cellar using a Soilmec auger rig. There were tanks onsite for cuttings. Pad was stoned. The Emergency Response sign and the permit signs were posted at the main road, where the access road begins. 24" conductor was onsite and they plan to set 42'.
2684435 Primary Facility 2018-01-11 Routine/Partial Inspection No Violations Noted At the time of inspection, well has not been spud. Lightning Energy Services was onsite drilling out cellar on the A 1H well using a Soilmec auger rig. There were tanks onsite for cuttings. Pad was stoned. The Emergency Response sign and the permit signs were posted at the main road, where the access road begins. 24" conductor was onsite and they plan to set 42'.
2684623 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2686276 Primary Facility 2018-01-25 Administrative/File Review No Violations Noted
2687339 Primary Facility 2018-01-17 Routine/Partial Inspection No Violations Noted At the time of inspection, well has been spud. 24" conductor was set to 42'. Appalachian Drillers are now onsite setting up equipment to start drilling top hole section of the well. Containment is laid out. Man camps are set up and drill pipe is arriving on location.
2687372 Primary Facility 2018-01-25 Drilling/Alteration No Violations Noted At the time of inspection, Appalachian Drillers 1 was tripping out of the well. Drill pipe was being placed on flat bed to take off location. Surface casing was cemented using 545 sxs Class A (118 bbls), 2% CaCl2, 2% Gypsum, 15.6 ppg, 1.22 yield. Displaced with 101 bbls water. Plug landed, floats held. 25 bbls returned to surface. A float shoe and float collar were used with 6 centralizers. A basket was used at 201'. The basket was used because a large seam of coal was noted from 230-236' and operator did not want to have an issue if circulation was lost. Some oil noted at 1350' when dusting stopped.

Intermediate casing info emailed later in day. It was cemented using 675 sxs Class A (147 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 140 bbls water. Plug landed and floats held. 28 bbls returned to surface. A float shoe and float collar (1941') were used along with 16 centralizers.

2696960 Primary Facility 2018-02-22 Routine/Partial Inspection No Violations Noted On 2/22/2018, WQS Brian MacQuarrie onsite. No activity onsite. No drilling equipment onsite. Secondary containment setup around two recently top-holed wells. Erosion and Sedimentation Best Management Practices installed and maintained. Disturbed areas seeded and mulched. Site sign and access road maintained.
2721140 Primary Facility 2018-04-23 Administrative/File Review No Violations Noted
2725574 Primary Facility 2018-05-02 Administrative/File Review No Violations Noted
2726246 Primary Facility 2018-05-04 Drilling/Alteration No Violations Noted Cement job done. Cleaning up site to move to next well pad in Ohio.
2741974 Primary Facility 2018-06-15 Routine/Partial Inspection No Violations Noted On 6/15/2018, WQS Brian MacQuarrie onsite. No activity onsite. No drilling equipment onsite. Two wells drilled. Erosion and Sedimentation Best Management Practices installed and maintained. Underdrain outlets 1, 2 and 4 repaired by adding additional rock. Initial redlines on Erosion and Sedimentation plan. Disturbed areas seeded and mulched. Vegetative growth well established. Site sign and access road maintained.
2776556 Primary Facility 2018-09-18 Routine/Partial Inspection No Violations Noted On 9/18/2018, WQS Brian MacQuarrie onsite meet with Bill Rice and Gary Winehart (XTO Energy). Currently stimulation activities are being conducted at the 1H (019-22687) and 3H (019-22689). Twenty three of 131 stages completed. Vegetation well established erosion and sedimentation bmp's maintained.
2809190 Primary Facility 2018-12-03 Administrative/File Review No Violations Noted
2831286 Primary Facility 2019-01-24 Routine/Partial Inspection No Violations Noted On 1/24/2019, WQS Brian MacQuarrie onsite. Two wells recently completed; 1H-019-22687 and 3H-019-22689. Crew onsite finishing up installing production equipment. Post Drilling Well Site Restoration Report submitted by operator on 1/08/2019. Erosion and Sedimentation BMPs installed and maintained. Drilling equipment removed from site.
2843998 Primary Facility 2019-02-25 Routine/Partial Inspection No Violations Noted On 2/25/2019, WQS Brian MacQuarrie onsite. Meet with Bill Rice (XTO Energy) well tender. Two wells, 1H (019-22687) and 2H (019-22689), recently placed into production. Tank battery consists of three 400 bbl tanks (one tank for condensate and two for production fluids), installed within secondary containment structure. Erosion and Sedimentation Best Management Practices installed and maintained. Vegetative growth established in previously disturbed areas.

For data sources see[8]

References