X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22650

Well Details

Well ID: 37-019-22650
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jackson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 153349
Farm/Lease Name: PER B34
License Status: Active
Spud Date: 2017-10-12
Permit Date: 2017-10-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.746428
Longitude: -80.150858

For data sources see[1][2][3]

Well History

Date Event
2017-10-11 New Permit Application
2017-10-12 Performed Spud Operation
2017-12-30 Drilling Completion
2018-06-07 Perforation
2018-06-07 Performed Stage 1 of Stimulation
2018-06-07 Performed Stage 2 of Stimulation
2018-06-07 Performed Stage 3 of Stimulation
2018-06-07 Performed Stage 4 of Stimulation
2018-06-08 Perforation
2018-06-08 Performed Stage 5 of Stimulation
2018-06-08 Performed Stage 6 of Stimulation
2018-06-08 Performed Stage 7 of Stimulation
2018-06-08 Performed Stage 8 of Stimulation
2018-06-08 Performed Stage 9 of Stimulation
2018-06-09 Perforation
2018-06-09 Performed Stage 10 of Stimulation
2018-06-09 Performed Stage 9 of Stimulation
2018-06-11 Perforation
2018-06-11 Performed Stage 11 of Stimulation
2018-06-11 Performed Stage 12 of Stimulation
2018-06-11 Performed Stage 13 of Stimulation
2018-06-11 Performed Stage 14 of Stimulation
2018-06-12 Perforation
2018-06-12 Performed Stage 15 of Stimulation
2018-06-12 Performed Stage 16 of Stimulation
2018-06-12 Performed Stage 17 of Stimulation
2018-06-12 Performed Stage 18 of Stimulation
2018-06-12 Performed Stage 19 of Stimulation
2018-06-12 Performed Stage 20 of Stimulation
2018-06-12 Performed Stage 21 of Stimulation
2018-06-12 Performed Stage 22 of Stimulation
2018-06-13 Perforation
2018-06-13 Performed Stage 23 of Stimulation
2018-06-13 Performed Stage 24 of Stimulation
2018-06-13 Performed Stage 25 of Stimulation
2018-06-13 Performed Stage 26 of Stimulation
2018-06-13 Performed Stage 27 of Stimulation
2018-06-13 Performed Stage 28 of Stimulation
2020-02-19 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-07 2018-06-13 5,490 11,235,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TRS 805X Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 1.87533 2,038,480.0
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.2578 93,762,000.0
TRS 3001 Tight Rock Solutions Scale Control Listed Below Listed Below 0 0 0
BIOC12031A Nalco Biocide Listed Below Listed Below 0 0 0
AP Breaker Lubrizol Breaker Listed Below Listed Below 0 0 0
Alcohol Alkoxylates Not Assigned 5 0.00344877 3748.81
Hydrochloric Acid 7647-01-0 7.5 0.152053 165282
Formaldehyde 0000050-00-0 1 0.00000908 9.872
Substituted alkylamine Not Assigned 1 0.000383938 417.34
Sodium Phosphate, Tribasic 7601-54-9 5 0.000941209 1023.09
Methanol 0000067-56-1 5 0.00004541 49.359
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000454086 493.59
Butyl digycol 0000112-34-5 75 0.000681128 740.385
Amine Triphosphate Not Assigned 30 0.00564726 6138.56
Ethylene Glycol 107-21-1 5 0.000941209 1023.09
Ammonium persulfate 7727-54-0 100 0.000496781 540
Silica Substrate 14808-60-7 100 11.569 12,575,500.0
Inorganic Salt Not Assigned 10 0.00383938 4173.4
Thiourea 0000062-56-6 1 0.00000908 9.872
Aliphatic Hydrocarbon Not Assigned 30 0.0206926 22492.8
Oxyalkylated alcohol Not Assigned 5 0.00191969 2086.7
Glutaraldehyde 111-30-8 30 0.00546727 5942.91
Hydrotreated Light Distillate Not Assigned 30 0.0115181 12520.2
Hydrochloric Acid (7.5%) PVS Acidizing Listed Below Listed Below 0 0 0
TRS 17888 Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Listed Below Listed Below 0 0 0
Unihib G Geosafe Corrosion Inhibitor Listed Below Listed Below 0 0 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-06-07 1 Sand 3,385,456 6,903 5,535
2018-06-07 2 Sand 3,385,456 6,794 5,817
2018-06-07 3 Sand 3,385,456 7,017 6,186
2018-06-07 4 Sand 3,385,456 6,844 5,692
2018-06-08 5 Sand 3,385,456 7,148 5,897
2018-06-08 6 Sand 3,385,456 6,560 5,611
2018-06-08 7 Sand 3,385,456 6,942 6,139
2018-06-08 8 Sand 3,385,456 6,603 5,864
2018-06-08 9 Sand 3,385,456 7,808 6,908
2018-06-09 10 Sand 3,385,456 6,399 5,372
2018-06-11 11 Sand 3,385,456 6,525 6,819
2018-06-11 12 Sand 3,385,456 6,575 5,818
2018-06-11 13 Sand 3,385,456 6,266 5,787
2018-06-11 14 Sand 3,385,456 6,389 5,923
2018-06-12 15 Sand 3,385,456 6,311 5,896
2018-06-12 16 Sand 3,385,456 6,211 6,889
2018-06-12 17 Sand 3,385,456 6,218 6,074
2018-06-12 18 Sand 3,385,456 6,289 6,188
2018-06-12 19 Sand 3,385,456 5,995 5,383
2018-06-12 20 Sand 3,385,456 6,058 5,235
2018-06-12 21 Sand 3,385,456 6,063 6,117
2018-06-12 22 Sand 3,385,456 5,818 5,817
2018-06-13 23 Sand 3,385,456 5,766 5,772
2018-06-13 24 Sand 3,385,456 5,750 5,543
2018-06-13 25 Sand 3,385,456 6,041 5,082
2018-06-13 26 Sand 3,385,456 6,097 5,412
2018-06-13 27 Sand 3,385,456 5,892 6,032
2018-06-13 28 Sand 3,385,456 5,826 5,942

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 359,225.00 102 0.00 0 850.00 102
2019 PENNENERGY RESOURCES LLC 721,122.00 355 0.00 0 840.00 355

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 50.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 280.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 110.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 140.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 923.73 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 579.57 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 59.82 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 13.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Filter Socks 0.32 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 4,381.88 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 2.63 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 168.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 575.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 29.95 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 25.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 87.27 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 12.22 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 151.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 45.31 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 300.48 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 13,545.49 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 2.42 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 432.15 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 118.16 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 28.80 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 4.71 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2650365 Primary Facility 2017-10-12 Drilling/Alteration No Violations Noted At the time of inspection, Rocky Mountain is onsite with a Soilmec auger rig working on cellar. It is 8' by 8' cellar and will be cemented in. The 20" hole has not been started yet. The Emergency Response sign and permit are posted at the entrance to the access road.
2653495 Primary Facility 2017-10-26 Routine/Partial Inspection No Violations Noted At the time of inspection, Highlands rig 9 is onsite. The well has been spud and 16" conductor was set to 42', using 2 centralizers. Cellar was set and cemented in. Well was covered with a steel plate. The Emergency Response sign and permit are posted at the entrance to the access road for the pad. The pad is fenced in.
2663996 Primary Facility 2017-11-16 Routine/Partial Inspection No Violations Noted At the time of inspection, Highlands 9 was over the 4H well. This well had surface casing cemented using 370 sxs Class H (80 bbls), 2% Gypsum, 2% CaCl2, 5% salt, 15.8 ppg, 1.22 yield. Displaced with 76 bbls water and bumped plug. 18 bbls cement were returned to surface. Floats were tested and held. A float shoe and float collar were used along with 9 centralizers.

Intermediate casing cemented using 685 sxs Class H (146 bbls), 2% Gypsum, 0.5% CaCl2, 5% salt, 15.8 ppg, 1.2 yield. Displaced with 156 bbls water and bumped plug. 23 bbls cement were returned to surface. Floats were tested and held. Float shoe and float collar were used with 32 centralizers. Burst pressure on pipe was 5750 psi.

2666982 Primary Facility 2017-12-04 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Permitted wells spudded. Wells fenced with a cattle gate and steel plate covering holes. No production equipment set. Temporary storage tanks installed. Pad liner installed & intact.

Well pad is fenced. Site ID sign in place. Well and ESCGP2 permits on site. Well development impoundment completed, fenced, &liner installed. All E/S controls &BMPs installed, in place, intact, and functioning. Site has good vegetation growth.

2678972 Primary Facility 2018-01-03 Routine/Partial Inspection No Violations Noted At the time of inspection, Patterson 261 was onsite drilling on the #4H well. This well had production casing cemented using a lead 1 of 250 sxs (50 bbls) HalCem, 14.5 ppg, 1.133 yield and a lead 2 of 660 sxs (134 bbls) ShaleCem, 14.5 ppg, 1.137 yield. The tail cement was 590 sxs (191 bbls) SoluCem, 15.2 ppg, 1.827 yield. Plug was bumped and floats held. 50 bbls were returned to surface. A float shoe and float collar were used along with 266 centralizers.
2694930 Primary Facility 2018-02-15 Administrative/File Review No Violations Noted
2721352 Primary Facility 2018-04-23 Administrative/File Review No Violations Noted
2737516 Primary Facility 2016-06-05 Administrative/File Review No Violations Noted
2786595 Primary Facility 2018-10-10 Administrative/File Review No Violations Noted
2814868 Primary Facility 2018-12-13 Routine/Partial Inspection No Violations Noted On 12/13/2018, WQS Brian MacQuarrie onsite. Contractors onsite filling cellars with gravel to surface. Site consists of six wells completed; 1H-019-22649, 2H-019-22511, 3H-019-22650, 4H-019-22651, 5H-019-22652 and 6H-019-22653. Tank battery consists of three 400 bbl tanks installed within stainless steel containment structure. Large AST onsite containing impaired water. Five 500 bbl frac tanks (empty) staged onsite. Freshwater impoundment lined and fenced in. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established in previously disturbed areas.
2836148 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On 2/5/2019, WQS Brian MacQuarrie onsite. Six wells in production, 1H (019-22649), 2H (019-22511), 3H (019-22650), 4H (019-22651), 5H (019-22652) and 6H (019-22653). Tank battery consists of three 400 bbl tanks installed within secondary containment structure. One large AST onsite. Five frac tanks staged onsite. Freshwater impoundment fenced in and locked. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas vegetated.

For data sources see[9]

References