37-019-22266

Well Details

Well ID: 37-019-22266
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Connoquenessing Township
Operator Name: XTO ENERGY INC
Well Pad ID: 151447
Farm/Lease Name: KYNE UNIT 3H
License Status:
Spud Date:
Permit Date: 2014-07-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.885153
Longitude: -80.008372

For data sources see[1][2][3]

Well History

Date Event
2014-07-15 New Permit Application
2014-09-15 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-10 2015-07-06 5,512 11,230,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Universal Proppant Silica Substrate NA 100 10.0337 10,581,200.0
Hydrochloric Acid (7.5%) Axiall Acidizing Other - (non-hazardous) NA 92.5 0.762703 804322
Hydrochloric Acid 7647-01-0 7.5 0.0154602 16303.8
Hydrochloric Acid 7647-01-0 7.5 0.0327756 34564.1
Hydrochloric Acid 7647-01-0 7.5 0.013605 14347.4
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.0148859 15698.2
Ethylene Glycol 107-21-1 30 0.00637966 6727.78
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0278791 29400.4
Other - (non-hazardous) NA 70 0.0650512 68600.9
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short chained glycol ether 112-34-5 60 0.00028624 301.86
Thiourea 62-56-6 1 0.00000477 5.031
Methanol 67-56-1 5 0.00002385 25.155
Acetophenone 98-86-2 1 0.00000477 5.031
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00202182 2132.15
Formaldehyde 50-00-0 1 0.00000477 5.031
Other - (non-hazardous) NA 30 0.00303273 3198.22
Ethoxylated alcohol 68002-97-1 35 0.000166973 176.085
Polyethylene Glycol 25322-68-3 50 0.00505456 5330.37
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0115363 12165.8
Other - (non-hazardous) NA 85 0.123344 130075
Hydrochloric Acid 7647-01-0 15 0.00478865 5049.95
Hydrochloric Acid 7647-01-0 15 0.00544165 5738.58
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.8719 93,721,400.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 121,667.00 87 0.00 0 132.85 60
2016 XTO ENERGY INC 620,684.00 326 0.00 0 738.50 295
2017 XTO ENERGY INC 562,414.00 327 0.00 0 488.55 327
2018 XTO ENERGY INC 265,856.97 338 17.22 30 217.06 308
2019 XTO ENERGY INC 161,599.82 172 0.00 0 172.19 172

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 1,087.71 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 705.30 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Drill Cuttings 18.79 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 14,123.96 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 854.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 8,826.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 2,562.60 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 974.50 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 8,739.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Other Oil & Gas Wastes 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 627.10 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 782.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 37.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 1,756.45 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 2,397.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 7,303.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 558.60 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 112.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 3,833.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Other Oil & Gas Wastes 117.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Produced Fluid 5,244.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 3,782.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 XTO ENERGY INC Produced Fluid 10,169.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 5,678.85 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2305395 Primary Facility 2014-09-16 Routine/Partial Inspection No Violations Noted
2309938 Primary Facility 2014-10-02 Drilling/Alteration No Violations Noted
2330523 Primary Facility 2014-12-10 Drilling/Alteration No Violations Noted
2330536 Primary Facility 2014-12-17 Routine/Partial Inspection No Violations Noted
2341641 Primary Facility 2015-02-03 Routine/Partial Inspection No Violations Noted
2486248 Primary Facility 2016-05-18 Routine/Partial Inspection No Violations Noted
2686928 Primary Facility 2018-01-25 Routine/Complete Inspection No Violations Noted On 1/25/2018, WQS Brian MacQuarrie and WQSS Scott Lux onsite. Site sign maintained at entrance. Access road maintained. Three wells properly tagged and in production. Four 400 bbl tanks installed within stainless steel secondary containment structure. Three gas processing units installed within containment structure. No apparent issues.
2703106 Primary Facility 2018-03-06 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity was in good condition with no signs of any leaks or spills at the site. Cellar is filled to surface with gravel. The well is properly labeled and the Emergency Response sign remains posted at the entrance to the pad. Pressure was reading somewhere around 500 psi for tubing.

The pad has 3 line heaters located within a lined, steel dike. A separate dike has 4 steel tanks (3 for produced water, 1 for condensate). There was also a gas buster hooked up. Production is being reported to the Department.

2835536 Primary Facility 2019-02-04 Routine/Partial Inspection No Violations Noted On 2/4/2019, WQS Brian MacQuarrie onsite. While onsite meet with Tom Baun-XTO Energy. Currently, the Kyne 4H (019-22804), Guiher 6H (019-22805) and Kyne 5H (019-22806) are being drilled. Previously, the 1H (019-22264), 2H(019-22265) and 3H(019-22266) were drilled and in production. Production equipment onsite consists of four 400 bbl production tanks installed within stainless steel containment structure and three gas processing units. Soundwall installed around perimeter of well pad. Previously disturbed areas stabilized with vegetative growth.

For data sources see[8]

References