If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22136 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.851678,"lon":-79.823747,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Summit Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 145303 | |
Farm/Lease Name: DREHER A UNIT 4H | |
License Status: | |
Spud Date: 2014-06-19 | |
Permit Date: 2013-08-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.851678 | |
Longitude: -79.823747 |
Date | Event |
---|---|
Deviated | |
2013-08-27 | New Permit Application |
2014-06-17 | Performed Spud Operation |
2014-10-21 | Drilling Completion |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-10-07 | 2016-11-15 | 5,898 | 10,415,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KAI-13 | Keane | Acid Inhibitor | Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000163739 | 156.544 |
Ethoxylated alcohol | 68131-39-5 | 10 | 0.000163739 | 156.544 | ||||
formic acid | 64-18-6 | 10 | 0.000163739 | 156.544 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000327477 | 313.088 | ||||
propan-2-ol | 67-63-0 | 5 | 0.00008187 | 78.272 | ||||
ethanediol | 107-21-1 | 40 | 0.000654954 | 626.175 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000163739 | 156.544 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.908 | 86,913,500.0 | |
KFR-17 | Keane | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.0358958 | 34318.5 | |
Fatty alcohols ethoxylated | Proprietary | 2 | 0.00159537 | 1525.27 | ||||
ethanediol | 107-21-1 | 10 | 0.00797683 | 7626.33 | ||||
Alcohols, C12-16, ethoxylated propoxylated | 68213-24-1 | 2 | 0.00159537 | 1525.27 | ||||
Hydrochloric Acid (15%) | Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00699204 | 6684.81 | |
Water | 7732-18-5 | 85 | 0.0396216 | 37880.6 | ||||
KSI-16NW | Keane | Scale Inhibitor | Alkyl phosphonic acid | Proprietary | 5 | 0.000875712 | 837.233 | |
ammonia | 7664-41-7 | 0.5 | 0.00008757 | 83.723 | ||||
Hydrochloric Acid (7.5%) | Keane | Acid Inhibitor | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0852299 | 81484.8 | |
Water | 7732-18-5 | 92.5 | 1.05117 | 1,004,980.0 | ||||
MBC-516 | Keane | Biocide | quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000434587 | 415.491 | |
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00065229 | 623.628 | ||||
glutaral | 111-30-8 | 26.7 | 0.00218521 | 2089.19 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 7.80188 | 7,459,070.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000163739 | 156.544 | |
Alcohols, C12-16, ethoxylated propoxylated | 68213-24-1 | 2 | 0.00159537 | 1525.27 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000163739 | 156.544 | ||||
ethanediol | 107-21-1 | 10 | 0.00797683 | 7626.33 | ||||
Fatty alcohols ethoxylated | Proprietary | 2 | 0.00159537 | 1525.27 | ||||
propan-2-ol | 67-63-0 | 5 | 0.00008187 | 78.272 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000327477 | 313.088 | ||||
Alkyl phosphonic acid | Proprietary | 5 | 0.000875712 | 837.233 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00065229 | 623.628 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000434587 | 415.491 | ||||
Ethoxylated alcohol | 68131-39-5 | 10 | 0.000163739 | 156.544 | ||||
formic acid | 64-18-6 | 10 | 0.000163739 | 156.544 | ||||
Water | 7732-18-5 | 85 | 0.0396216 | 37880.6 | ||||
Water | 7732-18-5 | 92.5 | 1.05117 | 1,004,980.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 205,311.00 | 134 | 0.00 | 0 | 174.94 | 88 |
2018 | XTO ENERGY INC | 282,834.04 | 298 | 0.00 | 0 | 59.18 | 149 |
2019 | XTO ENERGY INC | 13,911.50 | 22 | 0.00 | 0 | 24.11 | 22 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 1,150.85 Tons | LANDFILL | 100585 |
2017 | XTO ENERGY INC | Produced Fluid | 786.90 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 41.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2017 | XTO ENERGY INC | Produced Fluid | 949.31 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil | 0.35 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2017 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.35 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2017 | XTO ENERGY INC | Produced Fluid | 1,486.25 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 15,615.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 123.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 450.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 320.53 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2018 | XTO ENERGY INC | Produced Fluid | 10,387.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 1,024.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 573.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 698.84 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2280641 | Primary Facility | 2014-06-20 | Routine/Partial Inspection | No Violations Noted | |
2291745 | Primary Facility | 2014-07-30 | Routine/Partial Inspection | No Violations Noted | |
2319674 | Primary Facility | 2014-11-05 | Routine/Partial Inspection | No Violations Noted | |
2335936 | Primary Facility | 2015-01-13 | Routine/Partial Inspection | No Violations Noted | |
2360275 | Primary Facility | 2015-04-10 | Routine/Partial Inspection | No Violations Noted | |
2560973 | Primary Facility | 2017-02-13 | Administrative/File Review | No Violations Noted | |
2569644 | Primary Facility | 2017-02-28 | Routine/Partial Inspection | No Violations Noted | |
2699634 | Primary Facility | 2018-02-27 | Site Restoration | No Violations Noted | On 2/27/2018, WQS Brian MacQuarrie onsite. The site sign is maintained at entrance to site. Well pad has 11 wells drilled and tagged. Eight are in production including Permit Nos. 37-019-22064, 37-019-22065, 37-019-22134, 37-019-22135, 37-019-22136, 37-019-22137, 37-019-22138 and 37-019-22208. Three wells are not setup for production, Well Permit Nos. 37-019-22147, 37-019-22177 and 37-019-22178. Tank battery consists of nine 400 bbl tanks installed within secondary steel containment. The site has been restored and vegetative growth well established in previously disturbed areas. Temporary BMPs removed. PCSM BMPS installed.
Therefore the Notice of Termination request is approved. |
2775469 | Primary Facility | 2018-09-11 | Routine/Partial Inspection | No Violations Noted | On 9/13/2018, WQS Brian MacQuarrie onsite. The site sign is maintained at entrance to site. Well pad has 11 wells drilled and tagged. Eight are in production including Permit Nos. 37-019-22064, 37-019-22065, 37-019-22134, 37-019-22135, 37-019-22136, 37-019-22137, 37-019-22138 and 37-019-22208. Three wells are not setup for production, Well Permit Nos. 37-019-22147, 37-019-22177 and 37-019-22178. Tank battery consists of nine 400 bbl tanks installed within secondary steel containment. The site has been restored and vegetative growth well established in previously disturbed areas. PCSM BMPS maintained. |
2809281 | Primary Facility | 2018-11-30 | Routine/Partial Inspection | No Violations Noted | On 11/30/2018, WQS Brian MacQuarrie onsite meet with Jeff Voltz (XTO). Well stimulation activities currently underway for wells A5H (37-019-22147), B4H (37-019-22177) and B5H (37-019-22178). The other 8 wells (37-019-22064, 37-019-22065, 37-019-22134, 37-019-22135, 37-019-22136, 37-019-22137, 37-019-22138 and 37-019-22208), previously in production are currently shut-in until stimulation activities are completed. Containment setup on well pad. Freshwater is being pumped in from Kozik impoundment. PCSM plan maintained. |
For data sources see[8]