X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22044

Well Details

Well ID: 37-019-22044
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Buffalo Township
Operator Name: XTO ENERGY INC
Well Pad ID: 146272
Farm/Lease Name: HARVEY UNIT 3H
License Status:
Spud Date:
Permit Date: 2013-03-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.679406
Longitude: -79.766106

For data sources see[1][2][3]

Well History

Date Event
2013-03-14 New Permit Application
2013-05-29 Performed Spud Operation
2013-07-22 Drilling Completion
2013-12-13 Perforation
2015-01-21 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 405,185.00 163 0.00 0 0.00 0
2016 XTO ENERGY INC 774,809.00 342 0.00 0 0.00 0
2017 XTO ENERGY INC 526,570.00 365 0.00 0 0.00 0
2018 XTO ENERGY INC 386,047.69 324 0.00 0 0.00 0
2019 XTO ENERGY INC 713,132.66 363 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 1,347.41 Tons LANDFILL 100403
2015 XTO ENERGY INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 3,085.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.14 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 6,544.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 674.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 360.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 3,996.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Soil Contaminated by Oil 0.14 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Produced Fluid 224.30 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 179.60 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 2,001.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 1,186.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 2,146.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 612.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 483.00 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2172536 Primary Facility 2013-05-30 Routine/Partial Inspection No Violations Noted
2199025 Primary Facility 2013-08-27 Routine/Partial Inspection No Violations Noted
2204688 Primary Facility 2013-09-10 Routine/Partial Inspection No Violations Noted
2239188 Primary Facility 2014-01-15 Routine/Partial Inspection No Violations Noted
2271499 Primary Facility 2014-05-14 Routine/Partial Inspection No Violations Noted
2332967 Primary Facility 2014-12-23 Routine/Partial Inspection No Violations Noted
2436334 Primary Facility 2015-12-16 Routine/Partial Inspection No Violations Noted
2636769 Primary Facility 2017-09-13 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Production equipment installed on site, with secondary containment. Well is connected to a gathering pipeline. Well is fenced and has a well tag. Act 13 signage in place at entrance.

The ESCGP 2 permit has been approved for NOT. All on site temporary E/S controls have been removed, & PCSM BMPs and plan have been installed/implemented.

2705778 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted On 3/15/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Two wells in production, the 1H (Permit No. 37-019-22043) and 3H (Permit No. 37-019-22044). Tank battery consists of two 400 bbl tanks and one 300 bbl tank installed within stainless steel containment structures. Site access road maintained. No apparent issues.
2735828 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted On 5/31/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Two wells in production, the 1H (Permit No. 37-019-22043) and 3H (Permit No. 37-019-22044). Tank battery consists of two 400 bbl tanks and one 300 bbl tank installed within stainless steel containment structures. Site access road maintained. Vegetative growth well established in previously disturbed areas. No apparent issues.

For data sources see[7]

References