X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-21938

Well Details

Well ID: 37-019-21938
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: XTO ENERGY INC
Well Pad ID: 149702
Farm/Lease Name: HOLY TRINITY MONASTERY B UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-02-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.812442
Longitude: -79.873736

For data sources see[1][2][3]

Well History

Date Event
2012-02-17 New Permit Application
2012-07-09 Performed Spud Operation
2012-08-19 Drilling Completion
2012-10-24 Perforation
2014-04-01 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-12-18 2012-12-18 6,061 6,432,741

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other -(non hazardous) 40.0 0.0023
Hydrochloric Acid (15-40) blended down to 7.5 7647-01-0 7.5 0.0471
Hydrochloric Acid (15-40) blended down to 15 7647-01-0 15.0 0.0491
3,4,4-Trimethyloxazolidine 75673-43-7 4.5 0.0004
4,4 -Dimethyloxazolidine 51200-87-4 95.0 0.0091
Other -(non hazardous) 100.0 0.0076
Other -(non hazardous) 85.0 0.2784
Other -(non hazardous) 50.0 0.0004
Short Chained Glycol Ether 112-34-5 50.0 0.0004
Hydrotreated light distillates (10-30) 64742-47-8 30.0 0.0242
Other -(non hazardous) 70.0 0.0564
Glutaraldehyde 111-30-8 60.0 0.0034
2-Amino-2-Methyl-1-Propanol 124-68-5 0.5 0.0001
Other -(non hazardous) 92.5 0.5803
Acid Corrosion Inhibitor - EcoAcid CI GeoSafe Corrosion Inhibitor 100.0 None
Friction Reducer - MC MX-14-5 Multi-Chem Friction Reducer None None
Biocide - MC 8650 Multi-Chem Biocide None None
Water Water 7732-18-5 100.0 91.278
Biocide - MC 8520 Multi-Chem Biocide None None
Sand Proppant Crystaline Silica 14808-60-7 100.0 7.663
Acid - 7.5 HCl Acid PPG Acid None None
Scale Inhibitor - MC-MX-588-2 Multi-Chem Scale Inhibitor None None
Acid - 15 HCl Acid PPG Acid None None

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 269,317.00 164 0.00 0 126.47 156
2014 XTO ENERGY INC 908,812.00 357 0.00 0 348.26 173
2015 XTO ENERGY INC 599,180.00 345 0.00 0 0.00 0
2016 XTO ENERGY INC 403,045.00 329 0.00 0 102.34 46
2017 XTO ENERGY INC 421,234.00 365 0.00 0 11.67 30
2018 XTO ENERGY INC 250,773.29 344 0.00 0 8.49 137
2019 XTO ENERGY INC 295,911.54 291 0.00 0 6.19 97

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 1,003.20 Tons LANDFILL 100403
2013 XTO ENERGY INC Drill Cuttings 49.00 Tons LANDFILL 100403
2013 XTO ENERGY INC Fracing Fluid Waste 551.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Fracturing Fluid Waste 79.00 Tons LANDFILL 100585
2013 XTO ENERGY INC Produced Fluid 1,023.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2013 XTO ENERGY INC Produced Fluid 1,748.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 377.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 101674
2013 XTO ENERGY INC Produced Fluid 1,748.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 35.40 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 XTO ENERGY INC Produced Fluid 2,019.26 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 6,940.97 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 120.40 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 XTO ENERGY INC Produced Fluid 315.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 XTO ENERGY INC Produced Fluid 315.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 XTO ENERGY INC Produced Fluid 358.73 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 475.50 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 3,338.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 221.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 1,068.61 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Produced Fluid 573.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 11.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 1,057.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 1,497.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 65.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Waste Water Treatment Sludge 1.24 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2082626 Primary Facility 2012-07-12 Drilling/Alteration No Violations Noted
2093388 Primary Facility 2012-08-21 Routine/Partial Inspection No Violations Noted
2100759 Primary Facility 2012-09-17 Routine/Partial Inspection No Violations Noted
2121460 Primary Facility 2012-12-03 Routine/Partial Inspection No Violations Noted
2135307 Primary Facility 2013-01-30 Routine/Partial Inspection No Violations Noted
2146198 Primary Facility 2013-03-06 Routine/Partial Inspection No Violations Noted
2169422 Primary Facility 2013-05-21 Routine/Partial Inspection No Violations Noted
2288952 Primary Facility 2014-07-15 Routine/Partial Inspection No Violations Noted
2745996 Primary Facility 2018-06-26 Routine/Partial Inspection No Violations Noted On 6/26/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Two wells in production, 1H-019-21938 and 2H-019-21961. Production tanks and GPUs installed within containment. No apparent issues.

For data sources see[8]

References