37-015-23420

Well Details

Well ID: 37-015-23420
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Columbia Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155127
Farm/Lease Name: MONRO (03-142-03)G 3H
License Status:
Spud Date:
Permit Date: 2018-04-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.794225
Longitude: -76.848769

For data sources see[1][2][3]

Well History

Date Event
2018-04-17 New Permit Application
2018-07-10 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 1,116,706.50 194 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 0.52 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 15.48 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 1,956.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.84 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 3.09 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 2,767.04 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 4.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 0.69 Tons
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 28.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 73.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Produced Fluid 369.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Drill Cuttings 125.16 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 12.01 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 14.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Produced Fluid 119.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Drill Cuttings 1,175.88 Tons LANDFILL 101243
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 13.21 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 209.24 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.95 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2745549 Primary Facility 2018-06-26 Preoperation Inspection No Violations Noted Brubacher is working the access road with a dozer and roller today. Repsol plans to spud the future Marcellus Shale wells here soon. JLP
2749960 Primary Facility 2018-07-10 Routine/Complete Inspection No Violations Noted Conductor rig set up drilling/setting conductor on another well at time of inspection.
2752097 Primary Facility 2018-07-16 Routine/Complete Inspection No Violations Noted Warm/sunny at time of inspection.

Conductor only

2789126 Primary Facility 2018-10-16 Routine/Complete Inspection No Violations Noted Could not access well pad at time of visit due to construction/installation of production lines.

Inspection incomplete. Will revisit well pad in future days.

2810556 Primary Facility 2018-12-05 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of Repsol Oil & Gas's Monro (03-142) G Well Pad in Columbia Twp, Bradford County on 12/5/2018 at 0830 hours. The weather was 19 degrees and partly cloudy.

Tory Rogers, site safety supervisor, showed me around the site. They are currently drilling on the 6H with the Patterson Rig 805 and just recently started. The 40 gallon cement spill on containment that occurred on 12/3/2018 appeared to be cleaned up and remediated (see photo #1). All fluids observed were frozen, no issues were noted. No erosional issues were observed. All containment looked to be functioning properly. They are using double walled containment around there frac tanks which appeared to be working well. (photo #3). Tory was able to email me some photos taken on the day of the cement spill and a map to show the location (see photos #5, 6, 7, & 8).

No violations noted at this time. I departed the site at 0920 hours.

2816857 Primary Facility 2018-12-18 Drilling/Alteration No Violations Noted Arrived onsite to conduct a drilling inspection, located and entered the company mans quarters, the company man was not present, i did not conduct a full inspection due to company man was not present at time of inspection. I spoke to security guard at entrance of well site, he informed me that the company man had just left. I will return at a later date to conduct a full inspection.
2842189 Primary Facility 2019-02-20 Routine/Complete Inspection No Violations Noted I spoke with Shawn Callahan (REM Security & Safety) on site, and spoke with Rudy Yoder by phone. They explained the following: Repsol is rigging down Patterson 805 after drilling 8 Marcellus Shale wells from this pad. This morning ~0930 approx 1/2 quart of oil based drilling mud spilled on the pad. They removed the mud, and some pad material (photo 2) this morning.

I did not take electrical conductivity readings because i did not see any standing liquid on site (all frozen). Air temp 25F, snowing. JLP

For data sources see[7]