X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-23370

Well Details

Well ID: 37-015-23370
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145497
Farm/Lease Name: HART NORTH UNIT
License Status: Active
Spud Date:
Permit Date: 2017-08-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.571597
Longitude: -76.590881

For data sources see[1][2][3]

Well History

Date Event
2017-08-08 New Permit Application
2017-09-18 Performed Spud Operation
2018-01-11 Perforation
2018-01-29 Performed Stage 1 of Stimulation
2018-01-30 Perforation
2018-01-30 Performed Stage 2 of Stimulation
2018-01-31 Perforation
2018-01-31 Performed Stage 3 of Stimulation
2018-01-31 Performed Stage 4 of Stimulation
2018-02-01 Perforation
2018-02-01 Performed Stage 5 of Stimulation
2018-02-01 Performed Stage 6 of Stimulation
2018-02-02 Perforation
2018-02-02 Performed Stage 7 of Stimulation
2018-02-02 Performed Stage 8 of Stimulation
2018-02-03 Perforation
2018-02-03 Performed Stage 10 of Stimulation
2018-02-03 Performed Stage 9 of Stimulation
2018-02-04 Perforation
2018-02-04 Performed Stage 11 of Stimulation
2018-02-04 Performed Stage 12 of Stimulation
2018-02-05 Perforation
2018-02-05 Performed Stage 13 of Stimulation
2018-02-05 Performed Stage 14 of Stimulation
2018-02-06 Perforation
2018-02-06 Performed Stage 15 of Stimulation
2018-02-06 Performed Stage 16 of Stimulation
2018-02-06 Performed Stage 17 of Stimulation
2018-02-25 Perforation
2018-02-25 Performed Stage 18 of Stimulation
2018-02-25 Performed Stage 19 of Stimulation
2018-02-26 Perforation
2018-02-26 Performed Stage 20 of Stimulation
2018-02-26 Performed Stage 21 of Stimulation
2018-02-27 Perforation
2018-02-27 Performed Stage 22 of Stimulation
2018-02-27 Performed Stage 23 of Stimulation
2018-02-27 Performed Stage 24 of Stimulation
2018-02-28 Perforation
2018-02-28 Performed Stage 25 of Stimulation
2018-02-28 Performed Stage 26 of Stimulation
2018-02-28 Performed Stage 27 of Stimulation
2018-03-01 Perforation
2018-03-01 Performed Stage 28 of Stimulation
2018-03-01 Performed Stage 29 of Stimulation
2018-03-01 Performed Stage 30 of Stimulation
2019-06-27 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-29 2018-03-01 7,793 9,773,230 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislick ST-50 CESI Chemical Friction Reducer Listed Below
Sand Sargent/Unimin Proppant Listed Below
Water Chief Oil & Gas Carrier/Base Fluid Listed Below
BIOC11219A Nalco Champion Biocide Listed Below
Ammonium acetate 631-61-8 13 0.00815 7744
Thiourea 62-56-6 1 0.00001000 1
Ethylene glycol 107-21-1 30 0.00164 1558
Formaldehyde 50-00-0 1 0.00001000 1
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00007000 71
Methanol 67-56-1 45 0.01081 10269
Methanol 67-56-1 5 0.00001000 6
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00004000 41
Water 7732-18-5 40 0.0096 9128
Glutaraldehyde 111-30-8 5 0.0012 1141
Hydrochloric acid 7647-01-0 15 0.02195 20856
Acetophenone 98-86-2 1 0.00001000 1
Crystallilne silica 14808-60-7 100 13.9394 13,246,800.0
Water 7732-18-5 100 85.822 81,557,600.0
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00164 1558
Water 7732-18-5 85 0.12436 118182
Water 7732-18-5 40 0.00219 2077
Quaternary ammonium compound 68424-85-1 10 0.0024 2282
Alcohols, (C10-16), ethoxylated 68002-97-1 5 0.00313 2978
Alcohols, C12-14, ethoxylated 68439-50-9 5 0.00313 2978
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00313 2978
Distillate, petroleum, hydrotreated, light 64742-47-8 30 0.01881 17871
SCAL16486A Nalco Champion Scale Inhibitor Listed Below
Unihib G GeoSafe Acid Inhibitor Listed Below
Hydrochloric Acid PVC Acidizing Listed Below

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-01-29 1 Sand 6,239,961 8,589 9,174
2018-01-30 2 Sand 6,239,961 8,249 8,650
2018-01-31 3 Sand 6,239,961 7,847 9,950
2018-01-31 4 Sand 6,239,961 7,875 8,638
2018-02-01 5 Sand 6,239,961 8,436 8,749
2018-02-01 6 Sand 6,239,961 8,515 8,757
2018-02-02 7 Sand 6,239,961 8,215 8,685
2018-02-02 8 Sand 6,239,961 8,529 8,901
2018-02-03 9 Sand 6,239,961 8,412 8,600
2018-02-03 10 Sand 6,239,961 8,381 9,029
2018-02-04 11 Sand 6,239,961 8,439 8,767
2018-02-04 12 Sand 6,239,961 8,598 8,818
2018-02-05 13 Sand 6,239,961 8,538 8,867
2018-02-05 14 Sand 6,239,961 8,438 9,128
2018-02-06 15 Sand 6,239,961 8,404 8,688
2018-02-06 16 Sand 6,239,961 8,631 9,076
2018-02-06 17 Sand 6,239,961 8,083 8,569
2018-02-25 18 Sand 6,239,961 8,435 8,895
2018-02-25 19 Sand 6,239,961 8,558 8,780
2018-02-26 20 Sand 6,239,961 8,431 8,769
2018-02-26 21 Sand 6,239,961 7,943 8,830
2018-02-27 22 Sand 6,239,961 8,107 8,621
2018-02-27 23 Sand 6,239,961 8,454 8,929
2018-02-27 24 Sand 6,239,961 8,076 8,701
2018-02-28 25 Sand 6,239,961 7,810 8,623
2018-02-28 26 Sand 6,239,961 7,910 9,258
2018-02-28 27 Sand 6,239,961 7,714 8,945
2018-03-01 28 Sand 6,239,961 7,885 8,591
2018-03-01 29 Sand 6,239,961 7,576 8,697
2018-03-01 30 Sand 6,239,961 7,583 8,565

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 2,237,590.99 287 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 2,010,663.09 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CHIEF OIL & GAS LLC Drill Cuttings 1,079.53 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Produced Fluid 13,970.89 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Produced Fluid 2,915.90 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2647295 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted Conductor only.
2660032 Primary Facility 2017-11-09 Routine/Complete Inspection No Violations Noted I met Jeremy Boyd when I arrived. Precision rig 569 on location, just finishing drilling the 12 1/4" section of the Hart North 5H. Containment was in fairly good shape, although I pointed out 2 areas to Jeremy where the liner was torn on the berms. Jeremy told me he would address it. Overall, site appeared to be clean and well maintained.
2702026 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted Chief Oil and Gas representative on site: Chris Marsh

Universal conducting the frack. PPC site specific plan on site. The operator reported approximately 200 gallons of fracking fluid escaped at high pressure from an iron fitting attached to the well head. The high pressure fluid cut through the primary containment. The iron fitting was replaced and the containment was repaired. No clean-up under containment. A Vac truck was used were free liquid could be removed. Spilled material appears to have stayed on pad surface. Clean-up to begin after the frack is completed. Violations noted. No samples collected.

2707093 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted Site was very active when I arrived; company man Gibb Blevins was not at the site when I arrived. Frac was finished, and crews were setting up temporary separators and dehy units, as well as breaking down Baker tank containments. Many puddles were present on the pad surface, with conductance ranging from .56 to 1.3 mS/cm for the most part. Some small puddles (.5-2 gallons) were present near one of the Baker tank batteries that had slightly higher conductance (2-2.5 mS/cm); other puddles in the immediate area were in the range of .8-1.1 mS/cm. I was unable to access the center of the pad due to activity and truck traffic.
2733708 Primary Facility 2018-05-22 Routine/Complete Inspection No Violations Noted Arrrived at 12:00. Weather: rain. There were 5 producing wells on location. Frac operations appear to have been recently completed. There were 5 sand separators and two banks of tanks on site, liner was still in place. Cellars were water-filled with the exception of the Hart N 3H. It is worth remarking that there were numerous signs of ineffective sediment control on the access road (see photos).

For data sources see[9]

References