37-015-23267

Well Details

Well ID: 37-015-23267
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 146106
Farm/Lease Name: BAILEY UNIT 3H
License Status:
Spud Date:
Permit Date: 2016-03-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.578167
Longitude: -76.585403

For data sources see[1][2][3]

Well History

Date Event
2016-03-08 New Permit Application
2016-10-04 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-20 2017-03-01 8,309 10,017,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KAI-13 Keane Acid Inhibitor Listed Below
Water Chief Oil & Gas Carrier/Base Fluid Listed Below
Sand Keane Proppant Listed Below
Hydrochloric Acid (15%) Keane Acidizing Listed Below
EC6486A Nalco Champion Scale Inhibitor Listed Below
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00128 1247
1,2- Ethanediol 107-21-1 40 0.00004000 40
(Mineral oil) Light hydrotreated petroleum distillate 64742-47-8 20 0.01285 12465
Water 7732-18-5 40 0.00945 9168
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00001000 10
Water 7732-18-5 85 0.17576 170558
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00163 1580
Water 7732-18-5 100 86.1507 83,598,900.0
Ethanaminium, N,N,N-trimethyl-2-((1-oxo-2-propenyl)oxy)-,
chloride, polymer with 2-propenamide
69418-26-4 30 0.01927 18698
Methanol 67-56-1 45 0.01063 10314
Ethylene glycol 107-21-1 30 0.00163 1580
Alcohols, C12-15 linear, ethoxylated 68131-39-5 10 0.00001000 10
Glutaraldehyde 111-30-8 5 0.00118 1146
Formic acid 64-18-6 10 0.00001000 10
Crystallilne silica 14808-60-7 100 13.5491 13,147,800.0
Quaternary ammonium compound 68424-85-1 10 0.00236 2292
Dipropylene glycol monomethyl ether 34590-94-8 20 0.00002000 20
Hydrochloric acid 7647-01-0 15 0.03102 30098
N,N-Diethanololeamide 93-83-4 2 0.00128 1247
Water 7732-18-5 40 0.00217 2107
Cinnamaldehyde 104-55-2 10 0.00001000 10
2- Propanol 67-63-0 5 0.00001000 5
KFR-20 Keane Friction Reducer Listed Below
Bactron K-139 Nalco Champion Biocide Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 3,972,799.77 299 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 2,899,036.80 337 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,695,481.94 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CHIEF OIL & GAS LLC Drill Cuttings 1,401.05 Tons LANDFILL 301358
2016 CHIEF OIL & GAS LLC Drilling Fluid Waste 964.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2017 CHIEF OIL & GAS LLC Soil Contaminated by Oil & Gas Related Spills 300.85 Tons LANDFILL 301358
2017 CHIEF OIL & GAS LLC Soil Contaminated by Oil 300.85 Tons LANDFILL 301358
2017 CHIEF OIL & GAS LLC Produced Fluid 20,784.48 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 600.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 1,981.88 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials 0.77 Tons LANDFILL 301358

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2527152 Primary Facility 2016-10-07 Routine/Complete Inspection No Violations Noted
2529608 Primary Facility 2016-10-17 Drilling/Alteration No Violations Noted
2566208 Primary Facility 2017-03-01 Incident- Response to Accident or Event Pending Spill response by the DEP. Chief Company Man: Gilbert Blevins

The 3H well is being fracked at this time. Only three stages remain for the 3H. The entire frack should be completed by today (3/1/2017).

WHEN: 2/28/2017 16:30 WHAT HAPPENED: "Farrell is reporting a small wet area (1.5 x1’) at the edge of the wellpad, within the LOD where gravel ends. Wet area was noted during routine inspection. Handheld meter indicates 10,000 ppm TDS. The well is currently being fracked. There is no flow from the wet area."

RESPONSE IN PROGRESS/WHEN/WHO: "Chief has mobilized a vac truck and is on standby to remove any free liquid. MR Dirt is also on scene to dig a small trench to help determine the source of the liquid and provide a sump for removal."

The DEP arrived on location and met with a Chief employee to have him show the location of highly conductive water. The conductive water is located on western side of the pad surface and off the pad surface ~5 feet into the grass. An interception trench (see photo 2 an

2567893 Primary Facility 2017-03-06 Follow-up Inspection Pending Two representatives from Chief Oil and Gas were on location during the DEP's inspection. Woodward and Curran (environmental consultant) is currently at the site doing a detailed site profile to determine the extent of the release. A low spot on the pad surface was found to have a conductivity of around 6.8 mili-Siemens/cm. This location is thought to be the location of the release (See photo 3 and 5). An interception trench (See photo 1)was installed below the pad surface in the area where the release is believed to have migrated. No water was observed in this trench. The production water containment and tank were being removed due to concerns of the release being under both. The amount of brine water released could not be determined at this time. The DEP will make a determination at a future time once the operator and consultant determine the extent of the released material. No samples collected at this time. Violations pending.
2574486 Primary Facility 2017-03-23 Follow-up Inspection Pending Flow back operations are still in process at the wellsite. One each sand separator appears to be set up for each well. Plastic containment is still on location around well heads. Previously excavated area from spill has been backfilled with gravel and dirt. A SAC 942 sample was collected from the trench below the pad surface (see photos). The conductivity of the trench sample location was 1.052 mS/cm. Violations pending from previous.
2576296 Primary Facility 2017-03-28 Administrative/File Review Violation(s) Noted Sample results from the 3/1/2017 site inspection indicate a release of a regulated substance. The substance is believe to have been released from a blender unit. A March 21, 2017 report by Chief's hired consultant on the spill, Woodard and Curran, indicates the "blender overflowed twice" and that the containment liner was "evidently compromised and brine was released onto the pad surface..."

The DEP has Environmental Cleanups doing followup with the operator to determine Act 2 compliance is adhered.

Violations noted. See findings tab.

2576625 Primary Facility 2017-03-13 Follow-up Inspection Pending Flow back operations are in process on the well pad. Brendon Logan and Jessica Ritenour met with one Chief representative on the Well site. The leak is believed to have originated from the blender area during the Frack. Slightly conductive water (2.0 mS/cm) was in the interception trench 8 feet from the well pad. All excavated material was being stored in covered roll-off containers. No sample collected by the DEP at this time. Violations pending from prior sample.
2599565 Primary Facility 2017-06-01 Routine/Complete Inspection No Violations Noted Three wells in production status. Three separators within containment. No leaks from production equipment. Site stable. No violations.
2643799 Primary Facility 2017-10-04 Routine/Complete Inspection No Violations Noted Three wells in production status. Three separators within containment. No leaks detected. Site stabile.
2653978 Primary Facility 2017-10-26 Routine/Complete Inspection No Violations Noted Arrived at 13:20. Weather: cloudy and cold. No personnel were onsite for this routine inspection. There were 3 producing wells. Where possible, annuli were monitored using an Altair 5X gas meter calibrated on October 25, 2017.

3H: top gauge: 1500 psi, (0-5000 psi, analog) 13 3/8 x 9 5/8: 0% combustible gas. 9 5/8 x 5 1/2: not accessible. Annuli for 3H & 2H wells were plumbed to a 500 gallon poly tank.

2H: top gauge: 900 psi (0-5000 psi, analog)

13 3/8 x 9 5/8: not accessible. 9 5/8 x 5 1/2: 100% combustible gas. 1H: top gauge: 1200 psi [0 to 5000 psi, analog] 13 3/8 x 9 5/8: not accessible. 9 5/8 x 5 1/2: 20% combustible gas. No violations were observed at the time of this inspection.

2702035 Primary Facility 2018-03-06 Routine/Complete Inspection No Violations Noted A Spill of 5 gallons of flowback made it to the pad surface on 3/2/2018. The release was reported to the DEP on the same day. Two brine storage baker tanks on location for clean-out maintenance on the wells. One already full baker tank was mistakingly being filled by a truck which resulted in the tank being overfilled. The overflow exited the tank and blew beyond the containment. All contaminates removed and placed on plastic liner. Material to be disposed of at landfill. No spilled material discovered during the DEP's inspection. All material appears to be cleaned up. No samples collected. Violations immediately corrected.
2714339 Primary Facility 2017-07-17 Administrative/File Review No Violations Noted ACT 2 FINAL REPORT APPROVED
2791412 Primary Facility 2018-10-18 Administrative/File Review Violation(s) Noted Administrative Inspection created to cite a violation against a well in which Chief entered the wellbore less than eight hours after cementing the casing. This inspection/violation is part of a CACP found under Enforcement Record ID #368514.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2576296 781914 2017-03-28 2017-07-17 CSL 402(b) Environmental Health & Safety Release of liquid from the blender during fracking operations. The amount of liquid released remains unknown, but 150 cubic yards of excavated material was removed from the pad surface.
2576296 781915 2017-03-28 2017-07-17 78a64a(b) Environmental Health & Safety A hole in secondary containment led to the release from the blender during fracking operations.
2576296 781916 2017-03-28 2017-07-17 SWMA 301 Environmental Health & Safety Release of regulated material.
2576296 781917 2017-03-28 2017-07-17 78.57(a) Environmental Health & Safety Release of regulated material.
2791412 831068 2018-10-18 2018-10-18 78a85(c)4 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
781914 351987 NOV - Notice of Violation 2017-07-17
781915 351987 NOV - Notice of Violation 2017-07-17
781916 351987 NOV - Notice of Violation 2017-07-17
781917 351987 NOV - Notice of Violation 2017-07-17
831068 368514 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-10-18 2018-10-18 $220,000.00 $220,000.00

For data sources see[8]

References