37-015-21469

Well Details

Well ID: 37-015-21469
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Pike Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 149485
Farm/Lease Name: UPHAM 05 129 04 R 4H
License Status:
Spud Date:
Permit Date: 2011-01-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.861919
Longitude: -76.150947

For data sources see[1][2][3]

Well History

Date Event
2011-01-10 New Permit Application
2011-06-27 Performed Spud Operation
2011-07-27 New Permit Application
2012-04-18 Perforation
2012-11-30 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-04-18 2012-04-18 6,354 4,871,412

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRAC SAND Trican Well Service Frac Proppant Quartz 14808-60-7 100.00 16.64
Fresh Water Trican Well Service Carrier/Base Fluid - 100.00 61.53
FEAC-20 Trican Well Service Iron Control Acetic acid 64-19-7 50.00 0.00142000
Citric acid 77-92-9 30.00 0.00085000
GFR-1 Trican Well Service Friction Reducer NON-HAZARDOUS 100.00 0.07
Hydrochloric Acid 3.5 Trican Well Service Acid Spearhead Hydrochloric acid 7647-01-0 3.50 0.01
Water 7732-18-5 96.50 0.50
BIOCLEAR 5000 Trican Well Service Biocide Polyethylene glycol 25322-68-3 70.00 0.03
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10.00 0.00540000
LSI-21 Trican Well Service Scale Inhibitor NON-HAZARDOUS 100.00 0.05
Hydrochloric Acid 7.5 Trican Well Service Acid Spearhead Hydrochloric acid 7647-01-0 7.49 0.00312000
Water 7732-18-5 92.50 0.03
Recycled Produced Water Carrier/Base Fluid - 100.00 23.58
AI-7NR Trican Well Service Acid Inhibitor Propargyl alcohol 107-19-7 1.00 0.00001000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 453,075.60 207 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 411,829.20 343 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 176,581.70 342 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 220,572.70 279 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 219,209.40 281 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 240,063.60 363 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 176,626.80 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 186,240.70 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 376.29 Tons LANDFILL NY # 02S17
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 268.65 Tons LANDFILL NY31346244
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 963.43 Tons LANDFILL 8-0728-0004/013
2012 REPSOL OIL & GAS USA LLC Produced Fluid 500.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 REPSOL OIL & GAS USA LLC Produced Fluid 1,890.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 REPSOL OIL & GAS USA LLC Produced Fluid 1,300.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2012 REPSOL OIL & GAS USA LLC Produced Fluid 519.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 REPSOL OIL & GAS USA LLC Produced Fluid 10,281.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 1,156.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 REPSOL OIL & GAS USA LLC Produced Fluid 1,005.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2013 REPSOL OIL & GAS USA LLC Produced Fluid 3,922.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Produced Fluid 310.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 REPSOL OIL & GAS USA LLC Produced Fluid 207.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 REPSOL OIL & GAS USA LLC Produced Fluid 105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013 REPSOL OIL & GAS USA LLC Produced Fluid 859.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE003
2013 REPSOL OIL & GAS USA LLC Produced Fluid 520.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 REPSOL OIL & GAS USA LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 REPSOL OIL & GAS USA LLC Produced Fluid 1,271.98 Bbl REUSE OTHER THAN ROAD SPREADING
2015 REPSOL OIL & GAS USA LLC Produced Fluid 290.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Produced Fluid 300.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 2,472.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 2,744.41 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 224.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 7.54 Tons LANDFILL 100361
2016 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.05 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2016 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.05 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2016 REPSOL OIL & GAS USA LLC Produced Fluid 28.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 5.10 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Produced Fluid 13.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 16.00 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Produced Fluid 1,221.96 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 1.67 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Produced Fluid 65.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Produced Fluid 410.29 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 0.10 Tons LANDFILL 301358
2018 REPSOL OIL & GAS USA LLC Produced Fluid 98.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 353.46 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Produced Fluid 12.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 123.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2008360 Primary Facility 2011-09-21 Routine/Complete Inspection Pending Well drilled. Nogauges on annuli. No visible bubbling. No well tag
2204134 Primary Facility 2013-09-12 Routine/Complete Inspection No Violations Noted
2259334 Primary Facility 2014-03-27 Routine/Complete Inspection No Violations Noted
2343353 Primary Facility 2015-02-10 Routine/Partial Inspection No Violations Noted
2348558 Primary Facility 2015-02-26 Incident- Response to Accident or Event Violation(s) Noted Kristopher Perritt (Talisman) reported release of produced water to pad surface approximately 15 feet east of 3H well head. Observed stained snow (5'x10') on pad surface. Collected sample 0943204 from stained snow for analysis of SAC 942 metals only + Lithium.
2348576 Primary Facility 2015-02-27 Follow-up Inspection Outstanding Violations - No Viols Req'd Stained snow has been removed to a gas-buster tank. Impacted pad surface was being removed. Approximate dimensions of excavation are 25'x40'x4". Waiting on results of sample 0943204.
2355647 Primary Facility 2015-03-25 Routine/Complete Inspection No Violations Noted : Arrived @ 11:48, Cloudy and cold. Saxon 172 was skidding from the 3H to the 5H during my inspection. Met with company man, Pat Bauer; night man, Trent Anderson; and rig move supervisor Gary Reich. Drilling the 3H went smoothly according to Bauer. TD was 12990’ and cementing went very well. After drilling the 5H the rig will drill the 6H at this location and then move to the Bennett location. BOPs were last tested on 3/17/15. During my inspection rock was being laid down to address the muddy condition. Left location @ 12:30.
2356264 Primary Facility 2015-03-23 Follow-up Inspection Outstanding Violations - No Viols Req'd
2357714 Primary Facility 2015-03-31 Routine/Complete Inspection No Violations Noted I noticed a small amount of Calcium Chloride was spilled to containment near the chemical storage area. I pointed this out to Mr. Bauer.
2368801 Primary Facility 2015-04-20 Compliance Evaluation No Violations Noted
2464492 Primary Facility 2016-03-09 Routine/Complete Inspection No Violations Noted
2482528 Primary Facility 2016-05-09 Incident- Response to Accident or Event No Violations Noted Sheridan Anderson, Completions Company Man of Talisman Energy contacted the Department on 5/8/16 to report a spill of fluid to secondary containment. The Pennsylvania Department of Environmental Protection Standard Detail Report lists the following information in the long description of the spill. Sheridan Anderson of Talisman Energy contacted Phone Duty Officer (Anthony Liguori) that approx. 10:00 a.m. on 5/8/16 during well #6 frac, there was a mechanical failure of the pop-off valve, spilling an estimated 5 barrels of fluid on secondary containment and 1 barrel on primary containment. The spill was vacuumed up at time of call. Anderson noted using 100% fresh water, though high salinity was observed, possibly from intermingling with flowback from other wells on site.

I arrived at the site at 12:06. Halliburton is the Talisman subcontractor conducting hydraulic fracturing operations. Talisman submitted stimulation notifications to the Department on 4/14/16. This notice stated that frac operations for t

2485579 Primary Facility 2016-04-29 Routine/Complete Inspection No Violations Noted I conducted an inspection of the site accompanied by Andrew Hobbins, DEP O&G WQS. As we arrived at 10:30, Talisman was in the process of setting up for hydraulic fracturing operations. Talisman submitted a Stimulation Notice to the Department on 4/14/16 indicating that hydraulic fracturing operations will commence on 5/5/16 at 8 AM. We met with Billy Watts, site company man of Talisman Energy. Mr. Watts stated the following information. "Talisman commenced setting up for frac operations on 4/21/16. There are (65) frac tanks stored in the tank battery on containment next to the fill slope, full of production fluid which is transported to the site via vacuum trucks from other Talisman Pads. All frac tanks and gas buster tanks on-site have 110% containment capacity. The above ground storage tank contains around (1) million gallons of freshwater. The water is pumped through an underground pipeline from a nearby Talisman freshwater impoundment. There is a (100) mil in capacity New Pig Liner set in place bene
2492837 Primary Facility 2016-06-13 Incident- Response to Accident or Event No Violations Noted David Williams, Water Management Coordinator of Talisman Energy contacted the Department at 11:25 hours on 6/12/16 to report a production fluid spill. The PADEP Emergency response notification report states the following information. The spill occurred between 5:00 and 6:00 AM on 6/12/16. Production fluid left in the drip pan of water truck being loaded, spilled onto multiple sections of road during transport. Loading of the truck began at Upham well site by Fast Trucking. Production Fluid spilled from the drip pan at the turn out/entry to pad, at the intersection of State Route 467 and & CC Allis Road by state barn, and the intersection of Wolf Hill Road and South Hill Road. Mr. Williams reported that the affected areas were swept/vacuumed and loose stone was collected. Talisman intends to test and landfill clean up materials. There is no sign of runoff to wetlands or waterways according to Mr. Williams.

I met with Mr. Williams at 11:00 where the access road and paved road surface of East Street m

2493348 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted On June 7 2016 at 1100 hrs., the Department conducted a routine inspection at the Talisman Energy USA Inc.(Talisman), Upham (05-129) well site in Pike Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Dan Machaceck was the foreman on site for Talisman.

The Department walked around the well pad taking specific conductivity readings from puddles on and off containment. An area of slightly elevated conductivity was observed on the well pad between the 4H well and the GPU’s. The readings from the puddle were around 1600 µs/cm. All other conductivity readings were below 1000µS/cm. The Department recommends removing the liquid from the pad surface. Mr. Machaceck stated that they have been using vac trucks to remove rainwater from containment structures and have been putting the water back into the tank battery on-site.

The containment system appeared to be in good condition during the inspection. No staining was observed on the well pad surface. A

2503164 Primary Facility 2016-07-20 Incident- Response to Accident or Event No Violations Noted
2509460 Primary Facility 2016-07-15 Routine/Complete Inspection No Violations Noted Kris Perritt, Environmental Specialist of Talisman Energy forwarded an email to the Department on 7-14-16 containing a post frac conductivity assessment report consisting of Upham Post Completions EC Screening Data Summary 07-12-2016. The post frac assessment consists of electrical conductivity screening and flowback water remediation activities. The report also contains an electrical conductivity contour and proposed excavation location map. Golder Associates performed post hydraulic fracturing conductivity assessment of the pad surface by spraying distilled water on the pad surface and utilizing a soil conductivity probe immediately after spraying the water. There are (273) locations of the pad surface where soil conductivity readings were recorded. The highest reading recorded was at Point ID #94, was (15,560) microSiemens/cm³. This reading was recorded near the center of the well pad near the 5H and 6H wells. Mr. Perritt stated the following information in the email. "Golder Associates performed

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2348558 718801 02/26/2015 2015-02-26 78.57(a) - CONTROL, STORAGE AND DISPOSAL OF PRODUCTION FLUIDS - Operator failed to collect the brine and other fluids produced during operation, service and plugging of the well in a tank, pit or a series of pits or tanks, or other device approved by Environmental Health & Safety Talisman reported release of ~5 gallons of produced water to pad surface during plugging operations.
2348558 718802 02/26/2015 2015-02-26 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety Talisman reported release of ~5 gallons of produced water to pad surface during plugging operations.
2348558 718803 02/26/2015 2015-02-26 CSL 402(b) - POTENTIAL POLLUTION - Conducting an activity regulated by a permit issued pursuant to Section 402 of The Clean Streams Law to prevent the potential of pollution to waters of the Commonwealth without a permit or contrary to a permit issue Environmental Health & Safety Talisman reported release of ~5 gallons of produced water to pad surface during plugging operations.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
718801 321389 NOV - Notice of Violation Comply/Closed 2015-05-12
718802 321389 NOV - Notice of Violation Comply/Closed 2015-05-12
718803 321389 NOV - Notice of Violation Comply/Closed 2015-05-12

For data sources see[8]