37-015-21466

Well Details

Well ID: 37-015-21466
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Pike Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 149485
Farm/Lease Name: UPHAM 05 129 01 R
License Status:
Spud Date:
Permit Date: 2011-01-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.861747
Longitude: -76.150711

For data sources see[1][2][3]

Well History

Date Event
2011-01-10 New Permit Application
2011-06-30 Performed Spud Operation
2011-10-28 DEVIATED
2016-04-28 Perforation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-07 2016-05-17 6,278 4,227,350 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 79.3672 35,213,700.0
HYDROCHLORIC ACID Halliburton Solvent NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients Crystalline silica, quartz 14808-60-7 100 20.1776 8,952,390.0
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.0040705 1806
Water 7732-18-5 100 0.428308 190032
Ammonium chloride 12125-02-9 5 0.0040705 1806
Hydrochloric acid 7647-01-0 60 0.210241 93280
Acrylic acid 79-10-7 0.01 0.00000225 1
Glutaraldehyde 111-30-8 30 0.00578119 2565
Sodium polyacrylate '9003-04-7 1 0.00022088 98
Alkyl (C12-16) dimethylbenzylammonium chloride 68424-85-1 5 0.000964659 428
Phosphoric acid 7664-38-2 0.1 0.00001803 8
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.00009241 41
Olefins Confidential 5 0.00004057 18
Castor oil, ethoxylated 61791-12-6 5 0.0040705 1806
Methanol 67-56-1 60 0.00020961 93
Ethylene glycol 107-21-1 60 0.0132415 5875
Polyacrylate Proprietary 30 0.0244298 10839
Propargyl alcohol 107-19-7 10 0.00003155 14
Reaction product of acetophenone,
formaldehyde, thiourea
and oleic acid in dimethyl formamide
68527-49-1 30 0.00009241 41
Sodium chloride 7647-14-5 5 0.0040705 1806
Ethanol 64-17-5 1 0.000191579 85
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) 93-83-4 5 0.0040705 1806
Telomer Confidential 10 0.00220654 979
Hydrotreated light petroleum distillate 64742-47-8 30 0.0244298 10839
Fatty acids, tall oil Confidential 30 0.00009241 41
FDP-M1075-12, FDP-S1176-15, HAI-OS
ACID INHIBITOR, MC B-8614,
SAND-COMMON WHITE-100
MESH, SSA-2, SAND-PREMIUM WHITE-40/70
Halliburton Biocide, Corrosion Inhibitor, Friction Reducer, Proppant, Scale Inhibitor NA NA 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 576,200.50 202 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 637,159.00 364 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 421,229.40 365 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 280,503.30 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 543.55 Tons LANDFILL NY31346244
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 514.04 Tons LANDFILL NY # 02S17
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 286.83 Tons LANDFILL 8-0728-0004/013
2012 REPSOL OIL & GAS USA LLC Fracing Fluid Waste 13,801.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 795.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 REPSOL OIL & GAS USA LLC Produced Fluid 101.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 28,771.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.05 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2016 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.05 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2016 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 36.41 Tons LANDFILL 100361
2016 REPSOL OIL & GAS USA LLC Produced Fluid 8,935.47 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 8.16 Tons LANDFILL 8-0728-0004/013
2017 REPSOL OIL & GAS USA LLC Produced Fluid 170.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 16.00 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Produced Fluid 2,575.66 Bbl REUSE (AT WELL PAD)
2017 REPSOL OIL & GAS USA LLC Produced Fluid 35.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 1.67 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Produced Fluid 945.43 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 0.10 Tons LANDFILL 301358
2018 REPSOL OIL & GAS USA LLC Produced Fluid 269.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 11.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 204.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 488.27 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1993872 Primary Facility 2011-07-28 Drilling/Alteration No Violations Noted PD 209. Currently 9131'
2204131 Primary Facility 2013-09-12 Routine/Complete Inspection No Violations Noted
2259328 Primary Facility 2014-03-27 Routine/Complete Inspection No Violations Noted
2343351 Primary Facility 2015-02-10 Routine/Partial Inspection No Violations Noted
2348556 Primary Facility 2015-02-26 Incident- Response to Accident or Event No Violations Noted
2355569 Primary Facility 2015-03-25 Routine/Complete Inspection No Violations Noted : Arrived @ 11:48, Cloudy and cold. Saxon 172 was skidding from the 3H to the 5H during my inspection. Met with company man, Pat Bauer; night man, Trent Anderson; and rig move supervisor Gary Reich. Drilling the 3H went smoothly according to Bauer. TD was 12990’ and cementing went very well. After drilling the 5H the rig will drill the 6H at this location and then move to the Bennett location. BOPs were last tested on 3/17/15. During my inspection rock was being laid down to address the muddy condition. Left location @ 12:30.
2355826 Primary Facility 2015-02-27 Follow-up Inspection No Violations Noted Note: The original Inspection Report number for this inspection was: 2348574. The eFACTs entry was erroneously deleted. This is a replacement eFACTS entry. A note and the new inspection number has been added to the permit file. BR 3/30/15
2356260 Primary Facility 2015-03-23 Follow-up Inspection No Violations Noted
2357707 Primary Facility 2015-03-31 Routine/Complete Inspection No Violations Noted I noticed a small amount of Calcium Chloride was spilled to containment near the chemical storage area. I pointed this out to Mr. Bauer.
2368799 Primary Facility 2015-04-20 Compliance Evaluation No Violations Noted
2432618 Primary Facility 2015-12-14 Routine/Complete Inspection No Violations Noted
2464484 Primary Facility 2016-03-09 Routine/Complete Inspection No Violations Noted
2482521 Primary Facility 2016-05-09 Incident- Response to Accident or Event No Violations Noted Sheridan Anderson, Completions Company Man of Talisman Energy contacted the Department on 5/8/16 to report a spill of fluid to secondary containment. The Pennsylvania Department of Environmental Protection Standard Detail Report lists the following information in the long description of the spill. Sheridan Anderson of Talisman Energy contacted Phone Duty Officer (Anthony Liguori) that approx. 10:00 a.m. on 5/8/16 during well #6 frac, there was a mechanical failure of the pop-off valve, spilling an estimated 5 barrels of fluid on secondary containment and 1 barrel on primary containment. The spill was vacuumed up at time of call. Anderson noted using 100% fresh water, though high salinity was observed, possibly from intermingling with flowback from other wells on site.

I arrived at the site at 12:06. Halliburton is the Talisman subcontractor conducting hydraulic fracturing operations. Talisman submitted stimulation notifications to the Department on 4/14/16. This notice stated that frac operations for t

2485573 Primary Facility 2016-04-29 Routine/Complete Inspection No Violations Noted I conducted an inspection of the site accompanied by Andrew Hobbins, DEP O&G WQS. As we arrived at 10:30, Talisman was in the process of setting up for hydraulic fracturing operations. Talisman submitted a Stimulation Notice to the Department on 4/14/16 indicating that hydraulic fracturing operations will commence on 5/5/16 at 8 AM. We met with Billy Watts, site company man of Talisman Energy. Mr. Watts stated the following information. "Talisman commenced setting up for frac operations on 4/21/16. There are (65) frac tanks stored in the tank battery on containment next to the fill slope, full of production fluid which is transported to the site via vacuum trucks from other Talisman Pads. All frac tanks and gas buster tanks on-site have 110% containment capacity. The above ground storage tank contains around (1) million gallons of freshwater. The water is pumped through an underground pipeline from a nearby Talisman freshwater impoundment. There is a (100) mil in capacity New Pig Liner set in place bene
2492827 Primary Facility 2016-06-13 Incident- Response to Accident or Event No Violations Noted David Williams, Water Management Coordinator of Talisman Energy contacted the Department at 11:25 hours on 6/12/16 to report a production fluid spill. The PADEP Emergency response notification report states the following information. The spill occurred between 5:00 and 6:00 AM on 6/12/16. Production fluid left in the drip pan of water truck being loaded, spilled onto multiple sections of road during transport. Loading of the truck began at Upham well site by Fast Trucking. Production Fluid spilled from the drip pan at the turn out/entry to pad, at the intersection of State Route 467 and & CC Allis Road by state barn, and the intersection of Wolf Hill Road and South Hill Road. Mr. Williams reported that the affected areas were swept/vacuumed and loose stone was collected. Talisman intends to test and landfill clean up materials. There is no sign of runoff to wetlands or waterways according to Mr. Williams.

I met with Mr. Williams at 11:00 where the access road and paved road surface of East Street m

2493338 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted On June 7 2016 at 1100 hrs., the Department conducted a routine inspection at the Talisman Energy USA Inc.(Talisman), Upham (05-129) well site in Pike Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Dan Machaceck was the foreman on site for Talisman.

The Department walked around the well pad taking specific conductivity readings from puddles on and off containment. An area of slightly elevated conductivity was observed on the well pad between the 4H well and the GPU’s. The readings from the puddle were around 1600 µs/cm. All other conductivity readings were below 1000µS/cm. The Department recommends removing the liquid from the pad surface. Mr. Machaceck stated that they have been using vac trucks to remove rainwater from containment structures and have been putting the water back into the tank battery on-site.

The containment system appeared to be in good condition during the inspection. No staining was observed on the well pad surface. A

2503158 Primary Facility 2016-07-20 Incident- Response to Accident or Event No Violations Noted
2509454 Primary Facility 2016-07-15 Routine/Complete Inspection No Violations Noted Kris Perritt, Environmental Specialist of Talisman Energy forwarded an email to the Department on 7-14-16 containing a post frac conductivity assessment report consisting of Upham Post Completions EC Screening Data Summary 07-12-2016. The post frac assessment consists of electrical conductivity screening and flowback water remediation activities. The report also contains an electrical conductivity contour and proposed excavation location map. Golder Associates performed post hydraulic fracturing conductivity assessment of the pad surface by spraying distilled water on the pad surface and utilizing a soil conductivity probe immediately after spraying the water. There are (273) locations of the pad surface where soil conductivity readings were recorded. The highest reading recorded was at Point ID #94, was (15,560) microSiemens/cm³. This reading was recorded near the center of the well pad near the 5H and 6H wells. Mr. Perritt stated the following information in the email. "Golder Associates performed

For data sources see[8]

References