X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-20906

Well Details

Well ID: 37-015-20906
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Wells Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 149225
Farm/Lease Name: ROY 03 046 08 N 8H
License Status:
Spud Date:
Permit Date: 2010-05-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.904097
Longitude: -76.866467

For data sources see[1][2][3]

Well History

Date Event
2010-05-12 New Permit Application
2010-12-14 Performed Spud Operation
2011-04-28 Perforation
2011-07-26 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-04-28 2011-04-28 5,609 3,308,844

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Carrier/Base Fluid - 100.00 43.33
Acid, FEAC-20, LAI-20, FR-8, LSI-21, Bio-Clear 5000 Trican Well Service Acid, Iron Control Agent, Corrosion Inhibitor, Friction Reducer, Scale Inhibitor, Biocide Propargyl alcohol 107-19-7 8.00 0.00010000
Polyethylene glycol 25322-68-3 70.00 0.01
Ammonium chloride 12125-02-9 1.50 0.00070000
Hydrochloric acid 7647-01-0 15.00 0.07
Acetic acid 64-19-7 50.00 0.00140000
No Haz Components 0.00 0.00
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10.00 0.00280000
Methanol 67-56-1 40.00 0.00070000
Citric acid 77-92-9 30.00 0.00080000
Petroleum distillate 40.00 0.01
Recycled Produced Water Carrier/Base Fluid - 100.00 41.70
Sand (Proppant) Proppant - 100.00 14.31

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0
2011 REPSOL OIL & GAS USA LLC 330,662.00 122 0.00 0 0.00 0
2012 REPSOL OIL & GAS USA LLC 579,292.30 366 0.00 0 0.00 0
2013 REPSOL OIL & GAS USA LLC 399,744.50 364 0.00 0 0.00 0
2014 REPSOL OIL & GAS USA LLC 301,739.10 359 0.00 0 0.00 0
2015 REPSOL OIL & GAS USA LLC 237,982.50 362 0.00 0 0.00 0
2016 REPSOL OIL & GAS USA LLC 202,262.80 357 0.00 0 0.00 0
2017 REPSOL OIL & GAS USA LLC 165,302.10 364 0.00 0 0.00 0
2018 REPSOL OIL & GAS USA LLC 148,704.10 364 0.00 0 0.00 0
2019 REPSOL OIL & GAS USA LLC 147,820.10 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 41.00 Tons LANDFILL NY31346244
2011 REPSOL OIL & GAS USA LLC Fracturing Fluid Waste 23.00 Tons LANDFILL 100361
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 34.00 Tons LANDFILL NY # 02S17
2011 REPSOL OIL & GAS USA LLC Produced Fluid 8,521.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 REPSOL OIL & GAS USA LLC Drill Cuttings 41.00 Tons LANDFILL 8-0728-0004/013
2011 REPSOL OIL & GAS USA LLC Produced Fluid 2,374.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 321.18 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 REPSOL OIL & GAS USA LLC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 REPSOL OIL & GAS USA LLC Produced Fluid 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 REPSOL OIL & GAS USA LLC Produced Fluid 6,406.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 REPSOL OIL & GAS USA LLC Produced Fluid 405.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 REPSOL OIL & GAS USA LLC Produced Fluid 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 REPSOL OIL & GAS USA LLC Produced Fluid 500.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 REPSOL OIL & GAS USA LLC Produced Fluid 2,660.19 Bbl REUSE OTHER THAN ROAD SPREADING
2013 REPSOL OIL & GAS USA LLC Produced Fluid 260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 REPSOL OIL & GAS USA LLC Produced Fluid 102.04 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013 REPSOL OIL & GAS USA LLC Produced Fluid 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE003
2013 REPSOL OIL & GAS USA LLC Produced Fluid 2.21 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 REPSOL OIL & GAS USA LLC Produced Fluid 1,717.60 Bbl REUSE OTHER THAN ROAD SPREADING
2014 REPSOL OIL & GAS USA LLC Produced Fluid 201.22 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 REPSOL OIL & GAS USA LLC Produced Fluid 504.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 REPSOL OIL & GAS USA LLC Produced Fluid 988.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 REPSOL OIL & GAS USA LLC Produced Fluid 975.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 REPSOL OIL & GAS USA LLC Produced Fluid 890.00 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 390.00 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Produced Fluid 210.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Produced Fluid 495.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2010334 Primary Facility 2011-10-13 Routine/Complete Inspection No Violations Noted
2139918 Primary Facility 2013-02-13 Routine/Complete Inspection No Violations Noted 8H in production, 1H-7H conductor only
2563457 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted
2589097 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. I arrived on site at 11:00 hrs. No violations cited.
2784406 Primary Facility 2018-10-04 Site Restoration No Violations Noted A restoration inspection was conducted in response to a wellsite restoration report being received by the DEP on September 10, 2018. All post construction Stormwater management BMPs are installed and the site is stabilized for the requirements of chapter 102.22. The wellsite restoration report was accepted. A notice of termination for the erosion and sediment control general permit could be accepted upon submittal, based on current site conditions. There is one well drilled that appears to be capable of production and seven additional plugged wells located at this site. No violations were noted during this inspection.

For data sources see[8]

References