Well Details

Well ID: 37-015-20612
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Burlington Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 147189
Farm/Lease Name: BACON UNIT
License Status: Inactive
Spud Date:
Permit Date: 2010-01-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.743694
Longitude: -76.551361

For data sources see[1][2][3]

Well History

Date Event
2010-01-15 New Permit Application
2010-03-24 Performed Spud Operation
2010-05-25 Perforation
2010-12-13 DEVIATED
2017-03-13 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 95,170.00 91 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 211,516.00 353 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 11,929.32 60 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 57,141.00 219 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 466.00 24 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 1.34 29 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Produced Fluid 622.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,950.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 374.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2010 CHIEF OIL & GAS LLC Produced Fluid 4,931.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,386.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 1,043.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,262.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Produced Fluid 338.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 129.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 99.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHIEF OIL & GAS LLC Produced Fluid 743.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 CHIEF OIL & GAS LLC Produced Fluid 398.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHIEF OIL & GAS LLC Produced Fluid 1,776.40 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 124.32 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1872438 Primary Facility 2010-03-24 Routine/Complete Inspection No Violations Noted
1900935 Primary Facility 2010-07-21 Routine/Partial Inspection No Violations Noted
2049162 Primary Facility 2012-03-07 Routine/Complete Inspection No Violations Noted
2476848 Primary Facility 2016-03-25 Site Restoration No Violations Noted Routine inspection conducted on 3/25/2016 @ 12:50. Well Site Restoration Report received 3/17/2016.

One well in production.One separator and two production tanks. No leaks detected. Pad surface has topsoil and 70% veg with an access road circling the pad. Site in good condtion. Site restoration meets DEP requirements. No violations noted.

Well Permit Status Inspection ID Prior Inspection 1H 015-20612 Producing 2476848 03/07/2012

2500775 Primary Facility 2016-07-12 Routine/Complete Inspection No Violations Noted
2531216 Primary Facility 2016-10-06 Routine/Complete Inspection No Violations Noted Arrived at 11:30. Weather cool and sunny. This inspection was conducted in conjunction with an Application for Inactive Well Status. There was one well on a small pad. The cellar was filled in and cat tails were growing in close proximity to the well head (see photo). A methanol injection unit was in pieces on location. There was a large green polytank on containment in an area excavated down approximately 1 foot. Solar cells lying on the ground appear to have fallen from a metal mast near the well head. The well was locked and tagged. There was one annular vent, labelled 9 x 5. Field monitoring with an Altair 5X gas meter (calibrated on 10/5/16) obtained 100% combustible gas/volume. The flow appeared to be negligible. Also on the pad were: two produced water tanks and a small GPU in containment. There was also a pipeline connection, located at the edge of the pad. Adjacent to this was a small polytank containing corrosion inhibitor. Contacted Jon Hafer to request a joint follow-up inspection to determine
2531362 Primary Facility 2016-10-25 Routine/Complete Inspection No Violations Noted Arrived at 09:00. Weather: cloudy and cold. This inspection follows up on a previous Inactive Status Application inspection (10/6/16, 2531216). Met with Jon Hafer who confirmed that the well had been previously fracced and had been in production. Confirmed 100% combustible gas/volume on 9-5/8” x 5-1/2” annulus, no measureable flow. He explained that the 13-3/8” x 9-5/8” annulus was underneath the cellar gravel, confirmed that the large green polytank had been used for methanol. The well record listed a total of 1704 sx cement for the production casing which suggested the casing was cemented to surface. Hafer’s information indicated that the production casing cement top had been determined by CBL and was close to the kick-off point. He agreed to look for this CBL. No violations were noted at the time of this inspection. Left location @ 10:16.
2545042 Primary Facility 2016-12-13 Routine/Complete Inspection No Violations Noted Arrived at 11:10. Weather: cold. This inspection follows up on previous Inactive Status Application inspections (10/6/16, IR# 2531216; 10/25/16, IR# 2531362). Met with Jon Hafer (Chief). Also onsite were Ethan and Bob (Mountain Energy) with a vac truck. The 1H is the only well on the pad. It was locked and tagged. The gravel, cat tails and other vegetation present during previous inspections had been removed and 13-3/8” x 9-5/8” annulus was clearly visible. At the start of the inspection the water level was below the surface casing top. No bubbling was observed. When the water level was increased to cover the13-3/8” x 9-5/8” annulus, no bubbling was observed. The 9-5/8” x 5-1/2” annulus whose plumbing to the produced water tank had been blocked, was newly plumbed to the large green polytank previously used for methanol. Equipment and materials not in use had been removed from the site. No violations were noted at the time of this inspection. Left location @ 12:23.
2565823 Primary Facility 2017-02-16 Routine/Complete Inspection No Violations Noted One well in production phase. One separator and two production tanks within containment. No Leaks detected from production equipment. Site appears to be stable even with snow cover.
2681523 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. No violations cited.