X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-013-20013

Well Details

Well ID: 37-013-20013
Loading map...
Country: United States
State: Pennsylvania
County: Blair
Municipality: Juniata Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149193
Farm/Lease Name: RITCHEY UNIT 2H
License Status:
Spud Date:
Permit Date: 2010-06-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.353253
Longitude: -78.565858

For data sources see[1][2][3]

Well History

Date Event
2010-06-23 New Permit Application
2010-09-10 Performed Spud Operation
2010-09-28 Drilling Completion
2011-06-03 Perforation
2014-04-02 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 159,817.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 98,939.00 334 0.00 0 0.00 0
2015 LPR ENERGY LLC 92,398.40 284 0.00 0 0.00 0
2016 LPR ENERGY LLC 99,586.59 343 0.00 0 0.00 0
2017 LPR ENERGY LLC 80,590.00 356 0.00 0 0.00 0
2018 LPR ENERGY LLC 87,429.00 356 0.00 0 0.00 0
2019 LPR ENERGY LLC 85,412.00 356 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 89.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CHIEF OIL & GAS LLC Produced Fluid 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 392.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 22.72 Tons LANDFILL 101397
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 0.05 Tons LANDFILL 101397
2013 CHEVRON APPALACHIA LLC Produced Fluid 8,884.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 5,360.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 4,749.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 LPR ENERGY LLC Produced Fluid 288.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 LPR ENERGY LLC Produced Fluid 1,730.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 LPR ENERGY LLC Produced Fluid 55.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015 CHEVRON APPALACHIA LLC Produced Fluid 443.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 LPR ENERGY LLC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 2,500.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC 408.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 495.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC 129.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 972.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC 1,422.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 315.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 1,422.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC 315.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 LPR ENERGY LLC 202.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid 307.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 2,043.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 302.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2019 LPR ENERGY LLC Produced Fluid 1,841.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1911934 Primary Facility 2010-08-10 Routine/Complete Inspection No Violations Noted
1912775 Primary Facility 2010-09-13 Drilling/Alteration No Violations Noted Patterson 255 is currenlty drilling a 12 1/4" hole vertically at 1709'. on fresh water mud
1915131 Primary Facility 2010-09-23 Drilling/Alteration No Violations Noted Patterson 255 drilling curve at 7024'
1929630 Primary Facility 2010-10-29 Routine/Complete Inspection No Violations Noted
1931658 Primary Facility 2010-11-29 Routine/Complete Inspection Violation(s) Noted Gas venting from the 9 5/8" annulus
1980352 Primary Facility 2011-04-12 Routine/Complete Inspection No Violations Noted
1993519 Primary Facility 2011-06-20 Routine/Complete Inspection No Violations Noted
1997603 Primary Facility 2011-07-06 Routine/Complete Inspection No Violations Noted
2001278 Primary Facility 2011-07-22 Routine/Complete Inspection No Violations Noted
2024722 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted
2035484 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted
2049134 Primary Facility 2012-02-14 Routine/Complete Inspection No Violations Noted
2058969 Primary Facility 2012-03-08 Routine/Complete Inspection No Violations Noted
2111543 Primary Facility 2012-10-24 Follow-up Inspection No Violations Noted
2130407 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted
2139852 Primary Facility 2013-02-05 Routine/Complete Inspection No Violations Noted
2150776 Primary Facility 2013-03-19 Routine/Complete Inspection No Violations Noted
2170030 Primary Facility 2013-05-29 Routine/Complete Inspection No Violations Noted
2196049 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted
2223718 Primary Facility 2013-11-19 Routine/Complete Inspection No Violations Noted
2232646 Primary Facility 2013-12-27 Routine/Complete Inspection No Violations Noted
2500006 Primary Facility 2016-06-27 Site Restoration No Violations Noted
2688347 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Ritchey Unit, Well # 2H on January 30, 2018.

There are 3 producing wells on this pad. Annulus is closed and not vented at time of inspection. Mechanical gauge on the production line reads pressure 500 PSI, the gauge on the annulus reads 0 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist.

2818796 Primary Facility 2018-12-24 Routine/Complete Inspection No Violations Noted Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on December 24, 2018. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.

The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and covered in snow.

Well site restoration reports were previously submitted by LPR in June 2016. The Department denied those reports because the well heads were not properly labeled per OAG3211(h). The Department recommending addressing the labeling issue and then resubmitting well site restoration reports for wells 013-20012, 013-20013, and 013-20015. These reports shall be submitted through the Departments Greenport system.

2854586 Primary Facility 2019-03-15 Routine/Complete Inspection No Violations Noted Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on March 15, 2019. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.

The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and slopes are well vegetated.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1931658 600640 11/29/2010 2010-11-29 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
600640 265808 NOV - Notice of Violation

For data sources see[7]

References