X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20027

Well Details

Well ID: 37-007-20027
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: South Beaver Township
Operator Name:
Well Pad ID:
Farm/Lease Name: COLUMBIA GAS OF PENNA INC CGPA5
License Status: ACTIVE
Spud Date:
Permit Date: 1970-04-17
Well Type: WASTE DISPOSAL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.7560
Longitude: -80.443694

For data sources see[1][2][3]

Well History

Date Event
1970-04-17 New Permit Application
1970-09-03 Drilling Completion
1971-01-01 REWORKED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 COLUMBIA GAS OF PA INC 0.00 0 0.00 0 0.00 0
2014 COLUMBIA GAS OF PA INC 0.00 0 0.00 0 0.00 0
2015 COLUMBIA GAS OF PA INC 0.00 0 0.00 0 0.00 0
2016 COLUMBIA GAS OF PA INC 0.00 0 0.00 0 0.00 0
2017 COLUMBIA GAS OF PA INC 0.00 0 0.00 0 0.00 0
2018 COLUMBIA GAS OF PA INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1718249 Primary Facility 2008-05-24 Routine/Complete Inspection No Violations Noted storage
2036739 Primary Facility 2012-01-13 Routine/Complete Inspection No Violations Noted Disposal well for all waters from Blackhawk storage wells; 0psig; wellhead in good shape;
210162 Primary Facility 1989-02-27 Routine/Complete Inspection No Violations Noted E&S OK; TANK
212921 Primary Facility 1990-10-11 Routine/Complete Inspection No Violations Noted HAS UIC PERMIT
2139823 Primary Facility 2013-02-13 Routine/Complete Inspection No Violations Noted Injection well in Blackhawk storage collecting all fluids from all storage wells in pool; well in good shape ; access good.
217244 Primary Facility 1995-09-29 Routine/Complete Inspection No Violations Noted 1940 PSI; PRESSURE MAINT.
218957 Primary Facility 1996-10-24 Routine/Complete Inspection No Violations Noted 1935 PSI/ANN OPEN
220995 Primary Facility 1998-11-12 Routine/Complete Inspection No Violations Noted 1920 PSI; ANN OPEN
2262934 Primary Facility 2014-04-02 Routine/Complete Inspection No Violations Noted Disposal well in Columbia Gas Blackhawk storage field; annulus open; wellhead in good shape; all water from 7 other storage wells drains directly into the disposal well; site clear of any spills;
2398940 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted Disposal Well; 0psig; corrosion at base of wellhead; fieldcheck requested; open annulus;
2491321 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted This is a disposal well that is used to handle all brine water from storage well in Blackhawk storage; closed system; well head painted; no issues;
899126 Primary Facility 1999-11-10 Routine/Complete Inspection No Violations Noted 1210 PSI; ANN OPEN
980924 Primary Facility 2000-10-31 Routine/Complete Inspection No Violations Noted brine inj well in stor reservoir 1890 psi;

For data sources see[6]

References