37-005-31317

Well Details

Well ID: 37-005-31317
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY B 3H
License Status:
Spud Date:
Permit Date: 2018-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.686856
Longitude: -79.681364

For data sources see[1][2][3]

Well History

Date Event
2018-03-12 New Permit Application
2018-09-17 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 1,562,405.29 139 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Drilling Fluid Waste 929.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Drill Cuttings 541.53 Tons LANDFILL 100585
2018 XTO ENERGY INC Drill Cuttings 17.66 Tons LANDFILL 100434
2019 XTO ENERGY INC Drill Cuttings 973.95 Tons LANDFILL 100585
2019 XTO ENERGY INC Produced Fluid 1,734.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Unused Fracturing Fluid Waste 13.33 Tons LANDFILL 100434
2019 XTO ENERGY INC Produced Fluid 1,853.12 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Other Oil & Gas Wastes 145.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Drill Cuttings 109.70 Tons LANDFILL 100172
2019 XTO ENERGY INC Produced Fluid 2,609.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 869.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Waste Water Treatment Sludge 122.13 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 56,681.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Synthetic Liner Materials 53.50 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2775901 Primary Facility 2018-09-17 Drilling/Alteration No Violations Noted This well was just being spudded inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.
2778797 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2793654 Primary Facility 2018-10-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

On this next return date the rig was drilling at 1124' at the time of this inspection. All drilling log information was present and up to date and all equipment on site looked ok.

2821636 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.

For data sources see[7]

References